Legend/Notes
Safety, Health and Environmental Information

B01
Notes below are additional to hazards/risks normally GENERAL NOTES:
associated with this type of work:
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS STATED
COUNTRY CONSTRUCTION:
OTHERWISE.
107050
2. UNDERGROUND SERVICE LOCATIONS ARE TO BE VERIFIED PRIOR
Ci. FULL BURIED SERVICES TO BE CHECKED IN TO CARRYING OUT WORKS USING A CAT SCAN OR OTHER
D-1.3
D-1.1 ACCORDANCE WITH NETWORK RAIL PROCEDURES SUITABLE MEANS.
PLATFORM 1
ECV-

BY THE CONTRACTOR PRIOR TO COMMENCEMENT


OF ANY WORKS. 3. VINCI DUCTING ROUTE DESIGN TO BE CONFIRMED PRIOR TO
D-3.2 CONSTRUCTION WORKS START.
D-3.3 PLATFORM 5
DRG-

Cii. CORING THROUGH SUBWAY WALLS; VIBRATION,


4. SURVEY MODEL IS 148234-191-P2R-MLN1-MOD-ESU-107001.
D-3.1 NOISE & DUST.
D-3.4
5. DUCTING POSITION IN ACCORDANCE WITH COORDINATES
M LN1-

Ciii. WORKING AT HEIGHT. PROVIDED BY WED TEAM. SUBWAY SECTIONS PRE INDICATIVE
BASED ON AS BUILT RECORDS, SURVEY PHOTOS AND MODEL.
D-1.4
Civ. EXISTING CABLES AND PIPES TO BE PROTECTED
D-1.2
Mi DURING CORING. 6. POSITION OF DUCTS TO BE CORED SHOULD BE LOCALLY
PLATFORM 3
P2R-

ADJUSTED ON SITE IF CLASHING WITH EXISTING DUCTS, FIXINGS


OPERATIONAL: OR OTHER ELEMENTS.
191-

7. SHOWN DIMENSIONS ARE MINIMUM DISTANCE OF THE CORING.


ng Num ber

B-B A-A C-C D-D Oi.


THE MAXIMUM DIAMETER OF THE CORE TO BE 70mm.

PASSENGER SUBWAY
148234-

107050 107050 107050 107050 MAINTENANCE: 8. SECTIONS OF PLATFORM 2 ARE ONLY FOR GUIDANCE AND ARE
ASSUMED TO BE SIMILAR TO AS-BUILT DRAWINGS OF PLATFORM 4
awi

Mi. DAMAGE IN CABLING PASSENGER SUBWAY FROM PDF DMFP60018963 WITH REFERENCE
Ci TO PHOTOS SHOWN IN DRAWING.
Dr

D-4.2 Ci
D-4.4 DISMANTLING/DEMOLITION (FUTURE)
9. SECTIONS OF PLATFORM 1 ARE DRAWN ACCORDING TO PHOTOS
D-4.1 PASSENGER SUBWAY SHOWN IN DRAWING.
Di.
D-4.3 PLATFORM 4
10. CORING DISTANCE FROM CEILING TO TOP OF CORE SHOULD BE A
For more detailed information please refer to the designers H&S MINIMUM OF 200mm.
hazard record. Everyday or low risk hazards have not been
indicated on this drawing, neither have hazards that should be
DOWN MAIN UP MAIN DOWN RELIEF UP RELIEF obvious to a competent contractor. Should any additional
hazards be identified the contractor should notify all the relevant
project team members.

PLATFORM 2 These notes are based on the use of experienced and


competent contractors carrying out the work using an
approved safe method of working.

Lifesaving Rules

LUGGAGE SUBWAY Refer to:


Life Savingrules on Safety Central
everyone
home safe highlighting the core risks
associated with working on
every day the railway.

D-2.3
D-2.1 COLOUR KEY:

1. RED - NEW OR ADDITIONAL ITEMS

2. GREEN - REDUNDANT OR TO BE REMOVED


LONDON PLATFORM 1 LONDON END 3. BLUE - MODIFIED OR TO BE MOVED
D-2.4 PASSENGER SUBWAY 4. BLACK - EXISTING OR UNCHANGED
D-2.2

5. CYAN - VINCI DESIGN

4 NO. DISUSED EXISTING DUCTING


DUCTS CROSSING THE
D-4.2 D-4.1 6NO. PROPOSED CORES
SUBWAY
D-3.1 D-3.2 5NO. PROPOSED CORES 270 270 (SEE NOTE 10)
P01 21/08/19 IDC SUBMISSION HL RT RT
270 270 (SEE NOTE 10)
P02 23/08/19 For Form 001,002,003 DT RT RT

B01 23/08/19 For Form 001,002,003 DT RT RT

Rev Date Description of Revisions Drawn Chkd Appr

Mi Status Suitability
Civ

370
Ci
Fit for Internal Review & Comment S3
370

Civ

DOWN MAIN DOWN MAIN Cii, Ciii & Mi


Cii, Ciii 270 270
270
EXISTING CABLE TRAY D-4.4 D-4.3 PLATFORM 1 COUNTRY END
D-3.4 D-3.3
PASSENGER SUBWAY

SECTION A - A SECTION B - B Authorised Signed Date


Electronically Signed
PLATFORM 1 PASSENGER SUBWAY PLATFORM 1 PASSENGER SUBWAY Contractor(s)

COUNTRY END LONDON END Amey Rail


0 1 2 3 4 5m 0 1 2 3 4 5m
Location
PADDINGTON-BRISTOL-PENZANCE (PADDINGTON - COM PLYMOUTH S
SCALE 1:50 SCALE 1:50 Type Sub-type
CAD Drawing
Role Sub-Role
Civil Engineer General
Zone

3 NO. PROPOSED CORES 3NO. PROPOSED CORES Paddington to Reading


EXISTING PIPE D-1.4 PLATFORM 2 D-1.3 Phasing Grip Stage
D-2.3 D-2.4 (SEE NOTE 10) (SEE NOTE 10)
PLATFORM 2 GLAZED LIGHT
Proposed 5
Region

270 270 270 270


GLAZED LIGHT Western and Wales
PLATFORM 2 COUNTRY END Contract No.

PASSENGER SUBWAY 148234


Civ
Contract Title

Outer Stations
Drawing Title

D-2.1 D-2.2 D-1.2 D-1.1


MAIDENHEAD STATION
PASSENGER SUBWAY Cii, Ciii UP MAIN UP MAIN Cii, Ciii PASSENGER SUBWAY
PLATFORM 1 AND 2
PASSENGER SUBWAY
CORING DETAILS
Designed Signed Date
SECTION C - C SECTION D - D F. Bazo Electronically Signed 22/08/19
Drawn Signed Date
PLATFORM 2 PASSENGER SUBWAY PLATFORM 2 PASSENGER SUBWAY D.Tom Electronically Signed 22/08/19
Checked Signed Date
LONDON END COUNTRY END R.Thirumaran Electronically Signed 23/08/19
Approved Signed Date
0 1 2 3 4 5m 0 1 2 3 4 5m R.Thirumaran Electronically Signed 23/08/19
Scale(s) ELR & Mileage

SCALE 1:50 SCALE 1:50 1:1 24.0418 to 24.0418


Alternative Reference Sheet
PLATFORM 2 LONDON END 148234-ALT-DRG-ECV-107050 1 of 1
PASSENGER SUBWAY Drawing Number Revision

148234-191-P2R-MLN1-DRG-ECV-107050 B01

Sheet Size A1 594 x 841