You are on page 1of 19

PROJECT : 7 ACRES

Client : Frontline Builders


CONCRETE INWARD REGISTER
Sl.no Date Block Name Area of Casting Company Vch Type Grade Invoice Number Units Quantity M-10 Quantity M-20 Quantity M-25 Quantity M-30 Quantity M-40
1 24-Dec-18 Block - A PCC - Retaining Wall RDC Con RMC M-10 1836201628002 Cum 6 - - -
2 24-Dec-18 Block - A PCC - Retaining Wall RDC Con RMC M-10 1836201628007 Cum 7 - - -
3 25-Dec-18 Block - A PCC - Labour Camp RDC Con RMC M-7.5 1836201628017 Cum 7 - - -
4 25-Dec-18 Block - A PCC - Labour Camp RDC Con RMC M-7.5 1836201628029 Cum 6 - - -
5 27-Dec-18 Block - A RDC Con RMC M-10 1836201628088 Cum 7 - - -
6 27-Dec-18 Block - A RDC Con RMC M-10 1836201628091 Cum 6 - - -
7 10-Jan-19 Block - A PRISM RMC M-25 6119995023 Cum - - 6.00 -
8 10-Jan-19 Block - A PRISM RMC M-25 6119995025 Cum - - 6 -
9 10-Jan-19 Block - A PRISM RMC M-25 6119995027 Cum - - 6 -
10 10-Jan-19 Block - A PRISM RMC M-25 6119995028 Cum - - 6 -
11 10-Jan-19 Block - A PRISM RMC M-25 6119995029 Cum - - 7 -
12 12-Jan-19 Block - A PRISM RMC M-25 6119995040 Cum - - 6 -
13 12-Jan-19 Block - A PRISM RMC M-25 6119995041 Cum - - 6 -
14 12-Jan-19 Block - A PRISM RMC M-25 6119995042 Cum - - 6 -
15 12-Jan-19 Block - A PRISM RMC M-25 6119995043 Cum - - 6 -
16 12-Jan-19 Block - A PRISM RMC M-25 6119995044 Cum - - 6 -
17 12-Jan-19 Block - A PRISM RMC M-25 6119995045 Cum - - 6 -
18 12-Jan-19 Block - A PRISM RMC M-25 6119995046 Cum - - 6 - 2501
19 12-Jan-19 Block - A PRISM RMC M-25 6119995047 Cum - - 5 -
20 12-Jan-19 Block - A PRISM RMC M-10 6119995048 Cum 1 - - -
21 12-Jan-19 Block - A PRISM RMC M-10 6119995049 Cum 5 - - -
22 12-Jan-19 Block - A PRISM RMC M-10 6119995051 Cum 6 - - -
23 12-Jan-19 Block - A PRISM RMC M-10 6119995052 Cum 6 - - -
24 12-Jan-19 Block - A PRISM RMC M-10 6119995053 Cum 6 - - -
25 12-Jan-19 Block - A PRISM RMC M-10 6119995054 Cum 6 - - -
26 25-Jan-19 Block - A PRISM RMC M-25 6119995267 Cum - - 4 -
27 25-Jan-19 Block - A PRISM RMC M-25 6119995280 Cum - - 6 -
28 25-Jan-19 Block - A PRISM RMC M-25 6119995285 Cum - - 6 -
29 25-Jan-19 Block - A PRISM RMC M-25 6119995293 Cum - - 6 -
30 25-Jan-19 Block - A PRISM RMC M-10 6119995270 Cum 6 - - -
31 25-Jan-19 Block - A PRISM RMC M-10 6119995274 Cum 6 - - -
32 25-Jan-19 Block - A PRISM RMC M-10 6119995278 Cum 6 - - -
33 25-Jan-19 Block - A PRISM RMC M-10 6119995284 Cum 6 - - -
34 25-Jan-19 Block - A PRISM RMC M-10 6119995289 Cum 6 - - -
35 25-Jan-19 Block - A PRISM RMC M-10 6119995290 Cum 6 - - -
36 25-Jan-19 Block - A PRISM RMC M-10 6119995294 Cum 6 - - -
37 25-Jan-19 Block - A PRISM RMC M-10 6119995296 Cum 6 - - -
38 25-Jan-19 Block - A PRISM RMC M-10 6119995297 Cum 6 - - -
39 25-Jan-19 Block - A PRISM RMC M-10 6119995299 Cum 6 - - -
40 26-Jan-19 Block - A PRISM RMC M-10 6119995301 Cum 6 - - -
41 29-Jan-19 Block - A RDC Con RMC M-25 1836201629054 Cum - - 6 -
42 29-Jan-19 Block - A RDC Con RMC M-25 1836201629055 Cum - - 6 -
43 29-Jan-19 Block - A RDC Con RMC M-25 1836201629056 Cum - - 6 -
44 29-Jan-19 Block - A RDC Con RMC M-25 1836201629058 Cum - - 6 -
45 29-Jan-19 Block - A RDC Con RMC M-25 1836201629059 Cum - - 6 -
46 29-Jan-19 Block - A RDC Con RMC M-25 1836201629060 Cum - - 7 -
47 31-Jan-19 Block - A RDC Con RMC M-25 1836201629110 Cum - - 4 -
48 7-Feb-19 Block - A Retaining Wall - West S ide & South Side RDC Con RMC M-25 1836201629333 Cum -
lef over base raf Footing
- 7 -

49 7-Feb-19 Block - A Retaining Wall - West S ide & South Side RDC Con RMC M-25 1836201629334 Cum -
lef over base raf Footing - 7 -

50 7-Feb-19 Block - A Retaining Wall - West Side Wall first lif RDC Con RMC M-25 1836201629340 Cum -
- 7 -
51 7-Feb-19 Block - A Footing PCC RDC Con RMC M-10 1836201629345 Cum 6 -
52 7-Feb-19 Block - A Footing PCC RDC Con RMC M-10 1836201629352 Cum 6 -
53 7-Feb-19 Block - A Footing PCC RDC Con RMC M-10 1836201629353 Cum 7 -
54 7-Feb-19 Block - A Footing PCC RDC Con RMC M-10 1836201629356 Cum 6 -
55 7-Feb-19 Block - A Footing PCC RDC Con RMC M-10 1836201629358 Cum 6 -
56 7-Feb-19 Block - A Footing PCC RDC Con RMC M-10 1836201629361 Cum 6 -
57 8-Feb-19 Block - A Footing PCC RDC Con RMC M-10 1836201629364 Cum 7 -
58 8-Feb-19 Block - A Footing PCC RDC Con RMC M-10 1836201610869 Cum 6 -
59 8-Feb-19 Block - A Footing PCC RDC Con RMC M-10 1836201610870 Cum 6 -
60 8-Feb-19 Block - A Footing PCC RDC Con RMC M-10 1836201610871 Cum 6 -
61 8-Feb-19 Block - A Footing PCC RDC Con RMC M-10 1836201610874 Cum 3 -
62 9-Feb-19 Block - A Retaining Wall RDC Con RMC M-25 1836201610921 Cum 5.00
63 9-Feb-19 Block - A Retaining Wall RDC Con RMC M-25 1836201610923 Cum 5.00
64 9-Feb-19 Block - A Retaining Wall RDC Con RMC M-25 1836201610926 Cum 5.00
65 9-Feb-19 Block - A Footing PCC RDC Con RMC M-10 1836201610927 Cum 6
66 12-Feb-19 Block - A Retaining Wall RDC Con RMC M-25 1836201629466 Cum 7.00
67 12-Feb-19 Block - A Retaining Wall RDC Con RMC M-25 1836201629469 Cum 6.00
68 12-Feb-19 Block - A Retaining Wall RDC Con RMC M-25 1836201629471 Cum 4.00
69 12-Feb-19 Block - B Retaining Wall PCC RDC Con RMC M-10 1836201629473 Cum 6.00
70 12-Feb-19 Block - B Retaining Wall PCC RDC Con RMC M-10 1836201629477 Cum 3.00
71 16-Feb-19 Block - A Lif Raf PCC RDC Con RMC M-10 1836201629643 Cum 6.00
72 16-Feb-19 Block - A Lif Raf PCC RDC Con RMC M-10 1836201629648 Cum 6.00
73 16-Feb-19 Block - A Lif Raf PCC RDC Con RMC M-10 1836201629651 Cum 3.00
74 16-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629656 Cum 0.00 6.00
75 16-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629661 Cum 6.00
76 16-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629662 Cum 6.00
77 16-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629664 Cum 6.00
78 16-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629666 Cum 6.00
79 16-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629667 Cum 6.00
80 16-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629670 Cum 2.00
81 18-Feb-19 Block - A Retaining Wall RDC Con RMC M-25 1836201629711 Cum 7.00
82 18-Feb-19 Block - A Retaining Wall RDC Con RMC M-25 1836201629716 Cum 6.00
83 20-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629784 Cum 6.00
84 20-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629785 Cum 6.00
85 20-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629786 Cum 6.00
86 20-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629787 Cum 6.00
87 20-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629789 Cum 6.00
88 20-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629797 Cum 7.00
89 21-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629829 Cum 7.00
90 21-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629831 Cum 7.00
91 21-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629834 Cum 6.00
92 21-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629836 Cum 6.00
93 21-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629838 Cum 7.00
94 21-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629840 Cum 5.00 14
95 23-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629889 Cum 6.00 24
96 23-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629890 Cum 7.00 19 148.2
97 23-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629891 Cum 6.00 52.38 71.4285714286
98 23-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629892 Cum 6.00
99 23-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629893 Cum 6.00 8.33333
100 23-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629894 Cum 6.00 42.8571 4.8
101 23-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629895 Cum 6.00 0.3
102 23-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629897 Cum 4.00
103 25-Feb-19 Block - A Retaining Wall RDC Con RMC M-25 1836201629953 Cum 7.00
104 25-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629959 Cum 6.00
105 25-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629961 Cum 7.00
106 25-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629964 Cum 7.00
107 25-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629964 Cum 6.00
108 25-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629967 Cum 6.00
109 25-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629968 Cum 6.00
110 25-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629969 Cum 6.00
111 25-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629971 Cum 6.00
112 26-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201629976 Cum 3.00
113 28-Feb-19 Block - A Pedestal RDC Con RMC M-40 1836201610957 Cum 6.00
114 28-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201610965 Cum 6.00
115 28-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201610966 Cum 6.00
116 28-Feb-19 Block - A Pedestal RDC Con RMC M-40 1836201610967 Cum 0.00 3.00
117 28-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201610968 Cum 6.00
118 28-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201610969 Cum 7.00
119 28-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201610970 Cum 6.00
120 28-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201610971 Cum 6.00
121 28-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201610972 Cum 6.00
122 28-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201610973 Cum 6.00 43
123 28-Feb-19 Block - A RCC Footing RDC Con RMC M-20 1836201610975 Cum 7.00
124 2-Mar-19 Block - A Pedestal RDC Con RMC M-40 1836201630069 Cum 3.50
3HY18/AR-MN1056
125 2-Mar-19 Block - A Pedestal RDC Con RMC M-40 1836201630075 Cum 4.00
126 3-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836201610999 Cum 6.00
127 3-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836201611000 Cum 7.00
128 3-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836201611002 Cum 6.00
129 3-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836201611003 Cum 6.00
3HY18/AR-MN1057
130 3-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836201611004 Cum 7.00
131 3-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836201611006 Cum 6.00
132 3-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836201611008 Cum 3.00
133 3-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836201630104 Cum 1.50
134 5-Mar-19 Labour Labour camp PCC RDC Con RMC M-10 1836201630144 Cum 6.00 6HY18/AR-SI1322
135 5-Mar-19 Labour Labour camp PCC RDC Con RMC M-10 1836202417230 Cum 6.00 36600
136 6-Mar-19 Block - A Pedestal RDC Con RMC M-40 1836201611011 Cum 4.00
137 6-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836201611012 Cum 6.00 3HY18/AR-MN1060
138 6-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/37 Cum 7.00
139 6-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/39 Cum 7.00
140 6-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/40 Cum 6.00
141 6-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/41 Cum 7.00
142 6-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/42 Cum 6.00
143 6-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/44 Cum 6.00
144 6-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/47 Cum 4.30
145 6-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/47 Cum 0.70
146 7-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/57 Cum 3.00
147 7-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/60 Cum 3.00
148 8-Mar-19 Block - A Retaining Wall RDC Con RMC M-25 3HY18BP2/2 Cum 3.00
149 8-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/113 Cum 7.00
150 8-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP2/3 Cum 6.00
151 8-Mar-19 Block - C Footing PCC RDC Con RMC M-10 3HY18BP1/121 Cum 4.00
152 8-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/122 Cum 7.00
153 8-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/126 Cum 6.00
154 8-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/129 Cum 6.00
155 8-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/132 Cum 7.00
156 8-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/133 Cum 7.00
157 8-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/134 Cum 7.00
158 8-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/135 Cum 4.00
159 8-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/128 Cum 7.00
160 11-Mar-19 Block - C Footing PCC RDC Con RMC M-10 3HY18BP1/275 Cum 6.00
161 11-Mar-19 Block - C Footing PCC RDC Con RMC M-10 3HY18BP1/283 Cum 6.00
162 11-Mar-19 Block - A Retaining Wall RDC Con RMC M-25 3HY18BP1/282 Cum 7.00
163 11-Mar-19 Block - C Footing PCC RDC Con RMC M-10 3HY18BP1/287 Cum 6.00
164 11-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/288 Cum 7.00
165 11-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/294 Cum 6.00
166 11-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/296 Cum 7.00 2 cum dedect due to pump problem
167 11-Mar-19 Block - A Retaining Wall RDC Con RMC M-25 3HY18BP1/290 Cum 4.00
168 11-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/295 Cum 6.00
169 12-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/311 Cum 6.00
170 12-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/312 Cum 3.00
171 12-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/315 Cum 6.00
172 12-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/316 Cum 6.00 122096
173 12-Mar-19 Block - C Footing PCC ACC Con RMC M-10 NS2Q36010000703Cum 7.00
174 12-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/319 Cum 6.00
175 12-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/321 Cum 3.00
176 12-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/322 Cum 7.00
177 12-Mar-19 Block - C Footing PCC ACC Con RMC M-10 NS2Q36010000703Cum 7.00
178 12-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/324 Cum 6.00
179 12-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/327 Cum 6.00
180 12-Mar-19 Block - C Footing PCC ACC Con RMC M-10 NS2Q36010000703Cum 7.00
181 12-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/330 Cum 1.50
182 13-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/350 Cum 3.00
183 13-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995792 Cum 7.00
184 13-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995793 Cum 7.00
185 13-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/353 Cum 6.00
186 13-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/355 Cum 7.00
187 13-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/356 Cum 4.00
188 13-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995796 Cum 7.00
189 13-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/359 Cum 7.00
190 13-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995799 Cum 5.00
191 13-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/361 Cum 5.00
192 13-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/367 Cum 1.50
193 14-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/395 Cum 3.00
194 14-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995821 Cum 6.00
195 14-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995822 Cum 7.00
196 14-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995825 Cum 6.00
197 14-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/406 Cum 3.00
198 14-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995826 Cum 7.00
199 14-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995827 Cum 6.00
200 15-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995867 Cum 7.00
201 15-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/445 Cum 7.00
202 15-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995874 Cum 7.00
203 15-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18/AR-MN1027Cum 6.00
204 15-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/452 Cum 7.00
205 15-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995883 Cum 7.00
206 15-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/455 Cum 7.00
207 15-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/460 Cum 6.00
208 15-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/462 Cum 4.50
209 16-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995906 Cum 6.00
210 16-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995911 Cum 7.00 Tower crane Counter weight Pcc 3 cum
211 16-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995916 Cum 6.00
212 17-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995926 Cum 7.00
213 17-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/523 Cum 3.00
214 17-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995927 Cum 5.00
215 18-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/576 Cum 6.00
216 18-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/577 Cum 6.00
217 18-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995932 Cum 5.00
218 18-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836202417611 Cum 7.00 51800
219 18-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836202417616 Cum 7.00
220 18-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/579 Cum 6.00 3HY18BP1/612
221 18-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/582 Cum 6.50
222 19-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/602 Cum 6.00
223 19-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/604 Cum 7.00
224 19-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/607 Cum 7.00
225 19-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/608 Cum 6.00
226 19-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/609 Cum 7.00
227 19-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/616 Cum 5.50
228 20-Mar-19 Block - A RCC Footing RDC Con RMC M-20 3HY18BP1/631 Cum 7.00
229 20-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995949 Cum 7.00 Labour shed , c-block
230 20-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836201630149 Cum 7.00
231 20-Mar-19 Block - C Footing PCC PRISM RMC M-10 6119995955 Cum 5.00
232 20-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836202417677 Cum 6.00
233 20-Mar-19 Block - A RCC Footing RDC Con RMC M-20 1836201630152 Cum 6.00 25901.1
234 20-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119995957 Cum 7.00
235 20-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119995958 Cum 6.00
236 22-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/659 Cum 3.00
237 22-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119995984 Cum 7.00
238 22-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119995985 Cum 7.00
239 22-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/670 Cum 3.00
240 22-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119995989 Cum 6.00
241 22-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/676 Cum 4.50
242 23-Mar-19 Block - A Pedestal RDC Con RMC M-40 3HY18BP1/708 Cum 5.00
243 23-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996021 Cum 5.50
244 23-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996022 Cum 4.00
245 25-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996049 Cum 7.00
246 25-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996050 Cum 7.00
247 25-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996051 Cum 6.00
248 25-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996052 Cum 7.00
249 25-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996053 Cum 7.00
250 25-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996055 Cum 7.00
251 25-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996057 Cum 7.00
252 25-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996060 Cum 6.00
253 25-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996061 Cum 7.00
254 25-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996062 Cum 7.00
255 25-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996063 Cum 2.00
256 26-Mar-19 Block - A Lif Wall RDC Con RMC M-40 3HY18BP1/799 Cum 4.50
257 26-Mar-19 Block - C Pedestal PRISM RMC M-40 6119996065 Cum 3.00
258 26-Mar-19 Block - C Pedestal PRISM RMC M-40 6119996069 Cum 3.00
259 27-Mar-19 Block - C RCC Footing RDC Con RMC M-20 3HY18BP1/831 Cum 6.00
260 27-Mar-19 Block - C RCC Footing RDC Con RMC M-20 3HY18BP1/834 Cum 7.00
261 27-Mar-19 Block - C RCC Footing RDC Con RMC M-20 3HY18BP1/840 Cum 7.00
262 27-Mar-19 Block - C RCC Footing RDC Con RMC M-20 3HY18BP1/843 Cum 6.00
263 27-Mar-19 Block - C RCC Footing RDC Con RMC M-20 3HY18BP1/848 Cum 6.00
264 27-Mar-19 Block - C RCC Footing RDC Con RMC M-20 3HY18BP1/850 Cum 6.00
265 27-Mar-19 Block - C RCC Footing RDC Con RMC M-20 3HY18BP1/851 Cum 7.00
266 27-Mar-19 Block - C RCC Footing RDC Con RMC M-20 3HY18BP1/852 Cum 6.00
267 27-Mar-19 Block - C RCC Footing RDC Con RMC M-20 3HY18BP1/854 Cum 3.50
268 28-Mar-19 Block - C Pedestal PRISM RMC M-40 6119996099 Cum 3.00
269 28-Mar-19 Block - C Pedestal PRISM RMC M-40 6119996100 Cum 3.00
270 28-Mar-19 Block - C Pedestal PRISM RMC M-40 6119996103 Cum 3.50
271 29-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996124 Cum 7.00
272 29-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996128 Cum 7.00
273 29-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996133 Cum 7.00
274 29-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996138 Cum 7.00
275 29-Mar-19 Block - A Plinth Beam Pcc RDC Con RMC M-10 3HY18BP1/928 Cum 3.00
276 29-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996139 Cum 7.00
277 29-Mar-19 Block - A Column & ConterWeight RDC Con RMC M-40 3HY18BP1/934 Cum 4.00
278 29-Mar-19 Block - C RCC Footing PRISM RMC M-20 6119996147 Cum 5.50
279 30-Mar-19 Block - B Retaining Wall Raf RDC Con RMC M-20 3HY18BP1/961 Cum 7.00
280 30-Mar-19 Block - B Retaining Wall Raf RDC Con RMC M-20 3HY18BP1/964 Cum 7.00
281 30-Mar-19 Block - B Retaining Wall Raf RDC Con RMC M-20 3HY18BP1/965 Cum 7.00
282 30-Mar-19 Block - C Pedestal PRISM RMC M-40 6119996154 Cum 3.00
283 30-Mar-19 Block - B Retaining Wall Raf RDC Con RMC M-20 1836201630153 Cum 7.00 3HY18BP1/969
284 30-Mar-19 Block - C Pedestal & ConterWeight RDC Con RMC M-40 1836201630157 Cum 7.00 Conterweight-3.7 cum & C-Block Pedestal
285 31-Mar-19 Block - C Pedestal PRISM RMC M-40 6119996179 Cum 4.00
286 1-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996184 Cum 6.00
287 1-Apr-19 Block - C RCC Footing PRISM RMC M-20 6119996188 Cum 6.00
288 1-Apr-19 Block - C RCC Footing PRISM RMC M-20 6119996190 Cum 7.00
289 1-Apr-19 Block - C RCC Footing PRISM RMC M-20 6119996192 Cum 7.00
290 1-Apr-19 Block - C RCC Footing PRISM RMC M-20 6119996194 Cum 7.00
291 1-Apr-19 Block - A Plinth Beam Pcc RDC Con RMC M-10 3HY19BP1/6 Cum 4.00
292 1-Apr-19 Block - C RCC Footing PRISM RMC M-20 6119996198 Cum 7.00
293 1-Apr-19 Block - A Plinth Beam Pcc RDC Con RMC M-10 3HY19BP1/8 Cum 4.00
294 1-Apr-19 Block - C RCC Footing PRISM RMC M-20 6119996202 Cum 7.00
295 1-Apr-19 Block - C RCC Footing PRISM RMC M-20 6119996205 Cum 7.00
296 1-Apr-19 Block - C RCC Footing PRISM RMC M-20 6119996208 Cum 7.00
297 1-Apr-19 Block - C RCC Footing PRISM RMC M-20 6119996211 Cum 5.50
298 2-Apr-19 Block - A Plinth Beam Pcc Aparna RMC M-10 1203000069 Cum 3.00
299 2-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996225 Cum 3.50
300 2-Apr-19 Block - B Footing PCC Aparna RMC M-10 1203000082 Cum 6.00
301 3-Apr-19 Block - C RCC Footing PRISM RMC M-20 6119996230 Cum 4.00
302 3-Apr-19 Block - A Plinth Beam Pcc RDC Con RMC M-10 3HY19BP1/90 Cum 6.00
303 3-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996233 Cum 3.00
304 3-Apr-19 Block - A Plinth Beam Pcc RDC Con RMC M-10 3HY19BP1/96 Cum 6.00
305 3-Apr-19 Block - A Plinth Beam Pcc PRISM RMC M-10 6119996234 Cum 4.00
306 3-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996235 Cum 7.00
307 4-Apr-19 Block - A Plinth Beam RCC PRISM RMC M-40 6119996237 Cum 4.00
308 4-Apr-19 Block - A Plinth Beam RCC PRISM RMC M-40 6119996239 Cum 4.00
309 4-Apr-19 Block - A Plinth Beam RCC PRISM RMC M-40 6119996242 Cum 4.00
310 4-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996243 Cum 6.00
311 4-Apr-19 Block - C Footing RCC RDC Con RMC M-20 3HY19BP1/138 Cum 6.00
312 4-Apr-19 Block - B Lif Pcc PRISM RMC M-10 6119996245 Cum 6.00
313 4-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996246 Cum 7.00
314 4-Apr-19 Block - C Footing RCC RDC Con RMC M-20 3HY19BP1/140 Cum 7.00
315 4-Apr-19 Block - C Footing RCC RDC Con RMC M-20 3HY19BP1/143 Cum 6.00
316 4-Apr-19 Block - C Footing RCC RDC Con RMC M-20 3HY19BP1/145 Cum 6.00
317 4-Apr-19 Block - C Footing RCC RDC Con RMC M-20 1836202418079 Cum 6.00
318 5-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996258 Cum 7.00
319 5-Apr-19 Block - A Plinth Beam PCC PRISM RMC M-10 6119996259 Cum 6.00
320 5-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996266 Cum 6.00
321 7-Apr-19 Block - A Plith Beam RCC PRISM RMC M-40 6119996268 Cum 3.00
322 7-Apr-19 Block - A Plith Beam RCC PRISM RMC M-40 6119996274 Cum 4.00
323 7-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996275 Cum 6.00
324 7-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996277 Cum 4.00
325 8-Apr-19 Block - A Plith Beam RCC RDC Con RMC M-40 3HY19BP1/257 Cum 3.00
326 8-Apr-19 Block - B Footing PCC RDC Con RMC M-10 3HY19BP1/258 Cum 7.00
327 8-Apr-19 Block - A Plith Beam RCC RDC Con RMC M-40 3HY19/AR-MN7 Cum 4.00
328 8-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996288 Cum 7.00
329 8-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996289 Cum 7.00
330 8-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996290 Cum 7.00
331 8-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996291 Cum 6.00
332 8-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996292 Cum 7.00
333 8-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996297 Cum 7.00
334 8-Apr-19 Block - A Plith Beam RCC RDC Con RMC M-40 3HY19BP1/268 Cum 4.00
335 8-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996298 Cum 6.00
336 8-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996301 Cum 7.00
337 8-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996302 Cum 7.00
338 8-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996305 Cum 7.00
339 8-Apr-19 Block - B Footing PCC RDC Con RMC M-10 3HY19BP1/271 Cum 6.00
340 8-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996310 Cum 5.50
341 9-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996313 Cum 7.00
342 9-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996318 Cum 3.00
343 9-Apr-19 Block - B Footing PCC RDC Con RMC M-10 3HY19BP1/298 Cum 6.00
344 9-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996321 Cum 7.00
345 9-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996322 Cum 7.00
346 9-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996324 Cum 4.00
347 9-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996325 Cum 7.00
348 9-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996326 Cum 7.00
349 9-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996327 Cum 7.00
350 9-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996329 Cum 2.50
351 10-Apr-19 Block - A Plith Beam RCC RDC Con RMC M-40 3HY19BP1/326 Cum 4.00
352 10-Apr-19 Block - A Plith Beam RCC RDC Con RMC M-40 3HY19BP1/331 Cum 3.00
353 10-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996336 Cum 6.00
354 10-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/333 Cum 6.00
355 10-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996339 Cum 7.00
356 10-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996341 Cum 7.00
357 10-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996345 Cum 7.00 36.00
358 10-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/335 Cum 7.00
359 10-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/336 Cum 6.00 30.00
360 10-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996347 Cum 7.00
361 10-Apr-19 Block - A Plith Beam RCC RDC Con RMC M-40 3HY19BP1/338 Cum 3.00
362 10-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/339 Cum 6.00
363 10-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996349 Cum 2.00
364 10-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996356 Cum 4.00
365 10-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/342 Cum 5.00
366 10-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996358 Cum 7.00
367 12-Apr-19 Block - A Plint beam RCC Aparna RMC M-40 1203000563 Cum 4.00
368 12-Apr-19 Block - A Plint beam RCC RDC Con RMC M-40 3HY19BP1/352 Cum 4.00
369 12-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996384 Cum 7.00
370 12-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996384 Cum 7.00
371 12-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996386 Cum 7.00
372 12-Apr-19 Block - A Plint beam RCC PRISM RMC M-40 6119996387 Cum 4.00
373 12-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996388 Cum 7.00
374 12-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996389 Cum 7.00
375 12-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996390 Cum 7.00
376 12-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996391 Cum 7.00
377 12-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996392 Cum 7.00
378 12-Apr-19 Block - A Plint beam RCC RDC Con RMC M-40 3HY19BP2/16 Cum 3.00
379 12-Apr-19 Labour Labour camp PCC PRISM RMC M-10 6119996393 Cum 6.00
380 12-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996394 Cum 5.00
381 12-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996395 Cum 6.00
382 12-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996396 Cum 3.50
383 13-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996399 Cum 4.00
384 13-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996400 Cum 4.00
385 13-Apr-19 Block - B Towercrane Raf Pcc PRISM RMC M-10 6119996404 Cum 5.00
386 14-Apr-19 Block - C Pedestal& Lif Wall PRISM RMC M-40 6119996407 Cum 4.00
387 15-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996423 Cum 4.00
388 15-Apr-19 Block - A Plinth beam RCC PRISM RMC M-40 6119996435 Cum 4.00
389 15-Apr-19 Block - A Plinth beam RCC PRISM RMC M-40 6119996444 Cum 4.00
390 15-Apr-19 Labour Labour camp PCC PRISM RMC M-10 6119996425 Cum 4.00
391 16-Apr-19 Labour Labour camp PCC PRISM RMC M-10 6119996461 Cum 7.00
392 16-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996460 Cum 5.00
393 16-Apr-19 Block - B Pedestal RDC Con RMC M-40 3HY19BP1/428 Cum 3.00
394 16-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996462 Cum 6.00
395 16-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996463 Cum 7.00
396 16-Apr-19 Labour Labour camp PCC PRISM RMC M-10 6119996464 Cum 6.00
397 16-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/434 Cum 6.00
398 16-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996465 Cum 7.00
399 16-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996466 Cum 6.00
400 16-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/437 Cum 6.00 39.00
401 16-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/436 Cum 6.00 65.00
402 16-Apr-19 Block - B Footing RCC RDC Con RMC M-20 1836202418347 Cum 7.00
403 16-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996467 Cum 5.00
404 16-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996468 Cum 7.00
405 16-Apr-19 Block - B Footing RCC RDC Con RMC M-20 1836202418348 Cum 7.00
406 16-Apr-19 Block - C Footing RCC PRISM RMC M-20 6119996469 Cum 7.00
407 16-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/440 Cum 7.00
408 16-Apr-19 Block - C Footing RCC Aparna RMC M-20 1203000786 Cum 6.00
409 16-Apr-19 Block - C Footing RCC Aparna RMC M-20 1203000785 Cum 6.00
410 16-Apr-19 Block - C Footing RCC Aparna RMC M-20 1203000787 Cum 5.00
411 16-Apr-19 Block - C Footing RCC Aparna RMC M-20 1203000788 Cum 3.00
412 17-Apr-19 Block - B Footing PCC RDC Con RMC M-10 3HY19BP1/451 Cum 6.00
413 17-Apr-19 Block - B Pedestal PRISM RMC M-40 6119996470 Cum 3.00
414 17-Apr-19 Block - B Footing PCC RDC Con RMC M-10 3HY19BP1/454 Cum 7.00
415 17-Apr-19 Block - B Pedestal PRISM RMC M-40 6119996471 Cum 3.00
416 17-Apr-19 Block - B Footing PCC PRISM RMC M-10 6119996472 Cum 6.00
417 17-Apr-19 Block - C Footing RCC Aparna RMC M-20 1204000742 Cum 6.00
418 17-Apr-19 Block - C Footing RCC Aparna RMC M-20 1204000847 Cum 6.00
419 17-Apr-19 Block - C Footing RCC Aparna RMC M-20 1204000743 Cum 7.00
420 17-Apr-19 Block - C Footing RCC Aparna RMC M-20 1204000744 Cum 6.00
421 17-Apr-19 Block - C Footing RCC Aparna RMC M-20 1204000745 Cum 5.00
422 17-Apr-19 Block - C Footing RCC Aparna RMC M-20 1204000748 Cum 4.00
423 17-Apr-19 Block - C Footing RCC Aparna RMC M-20 1204000752 Cum 2.00
424 18-Apr-19 Block - B Footing PCC RDC Con RMC M-10 3HY19BP1/484 Cum 6.00
425 18-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996502 Cum 3.00
426 18-Apr-19 Block - B Footing PCC RDC Con RMC M-10 3HY19BP1/496 Cum 6.00
427 18-Apr-19 Block - C Plinth Beam PCC PRISM RMC M-10 6119996504 Cum 3.00
428 18-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996503 Cum 3.00
429 19-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996505 Cum 4.00
430 19-Apr-19 Block - C Pedestal PRISM RMC M-40 6119996508 Cum 4.00
431 19-Apr-19 Block - B Footing PCC Aparna RMC M-10 1203000986 Cum 5.00
432 19-Apr-19 Block - B Footing PCC RDC Con RMC M-10 3HY19BP1/528 Cum 6.00
433 20-Apr-19 Block - C Plinth Beam PCC PRISM RMC M-10 6119996529 Cum 3.00
434 20-Apr-19 Block - A Column Concrete PRISM RMC M-40 6119996531 Cum 4.00
435 20-Apr-19 Block - A Column Concrete PRISM RMC M-40 6119996534 Cum 4.00
436 20-Apr-19 Block - A Column Concrete PRISM RMC M-40 6119996535 Cum 3.00
437 21-Apr-19 Block - C Plinth Beam RCC PRISM RMC M-40 6119996536 Cum 3.00
438 21-Apr-19 Block - C Plinth Beam RCC PRISM RMC M-40 6119996537 Cum 3.00
439 22-Apr-19 Block - C Plinth Beam PCC RDC Con RMC M-10 3HY19BP1/603 Cum 3.00
440 22-Apr-19 Block - A Column Concrete PRISM RMC M-40 6119996559 Cum 4.00
441 22-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/609 Cum 6.00
442 22-Apr-19 Block - A Column Concrete PRISM RMC M-40 6119996564 Cum 4.00
443 22-Apr-19 Block - B Footing RCC ACC Con RMC M-20 NS2Q36190100055Cum 4.50
444 22-Apr-19 Block - C Plinth Beam RCC PRISM RMC M-40 6119996561 Cum 4.00
445 22-Apr-19 Block - A Column Concrete PRISM RMC M-40 6119996568 Cum 4.50
446 23-Apr-19 Block - C Plinth Beam PCC ACC Con RMC M-10 NS2Q36190100058Cum 3.00
447 23-Apr-19 Block - C Plinth Beam RCC RDC Con RMC M-40 3HY19BP1/644 Cum 3.00
448 24-Apr-19 Block - C Plinth Beam RCC Aparna RMC M-40 1203001162 Cum 3.50
449 24-Apr-19 Tower crane Tower crane Footing RDC Con RMC M-30 3HY19BP1/672 Cum 6.00
450 24-Apr-19 Tower crane Tower crane Footing RDC Con RMC M-30 3HY19BP1/674 Cum 7.00
451 24-Apr-19 Tower crane Tower crane Footing RDC Con RMC M-30 3HY19BP1/677 Cum 6.00
452 24-Apr-19 Tower crane Tower crane Footing RDC Con RMC M-30 3HY19BP1/679 Cum 6.00
453 24-Apr-19 Tower crane Tower crane Footing RDC Con RMC M-30 3HY19BP1/682 Cum 7.00
454 24-Apr-19 Block - C Plinth Beam RCC Aparna RMC M-40 1203001162 Cum 3.00
455 25-Apr-19 Block - C Plinth Beam PCC RDC Con RMC M-10 3HY19BP1/702 Cum 3.00
456 25-Apr-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/707 Cum 3.00
457 25-Apr-19 Block - C Plinth Beam RCC RDC Con RMC M-40 3HY19BP1/716 Cum 3.00
458 25-Apr-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/717 Cum 4.50
459 25-Apr-19 Block - B Pedestal RDC Con RMC M-40 3HY19BP1/725 Cum 3.00
460 25-Apr-19 Block - B Footing PCC RDC Con RMC M-10 3HY19BP1/726 Cum 3.00
461 26-Apr-19 Block - C Plinth Beam RCC RDC Con RMC M-40 3HY19BP1/761 Cum 3.00
462 26-Apr-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/768 Cum 3.00
463 26-Apr-19 Block - C Plinth Beam RCC & Lif RDC Con RMC M-40 3HY19BP1/773 Cum 2.50
464 27-Apr-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/808 Cum 4.00
465 27-Apr-19 Block - C Plinth Beam RCC RDC Con RMC M-40 3HY19BP1/809 Cum 4.00
466 27-Apr-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/816 Cum 3.00
467 27-Apr-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/822 Cum 3.00
468 29-Apr-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/842 Cum 4.00
469 29-Apr-19 Block - C Plinth Beam RDC Con RMC M-40 3HY19BP1/846 Cum 3.00
470 29-Apr-19 Block - B Retaining Wall PCC RDC Con RMC M-10 NS2Q36190100072Cum 3.00
471 29-Apr-19 Block - C Plinth Beam RCC RDC Con RMC M-40 3HY19BP1/855 Cum 3.50
472 29-Apr-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/856 Cum 3.00
473 29-Apr-19 Block - B Footing RCC RDC Con RMC M-20 1836202418664 Cum 7.00
474 29-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP2/29 Cum 6.00
475 29-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP2/31 Cum 6.00
476 29-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP2/32 Cum 7.00
477 29-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP2/33 Cum 6.00
478 29-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/857 Cum 5.00
479 29-Apr-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/860 Cum 3.00
480 29-Apr-19 Block - B Footing RCC RDC Con RMC M-20 1836202418670 Cum 6.00
481 29-Apr-19 Block - B Footing RCC RDC Con RMC M-20 1836202418669 Cum 6.00
482 30-Apr-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/885 Cum 4.00
483 30-Apr-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/890 Cum 3.50
484 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/895 Cum 6.00
485 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/898 Cum 6.00
486 30-Apr-19 Block - C Plinth Beam RDC Con RMC M-40 3HY19BP1/899 Cum 4.00
487 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/901 Cum 7.00
488 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/900 Cum 7.00
489 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/903 Cum 6.00
490 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/905 Cum 6.00
491 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/907 Cum 6.00
492 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/908 Cum 7.00
493 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/909 Cum 7.00
494 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/910 Cum 6.00
495 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/911 Cum 7.00
496 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/913 Cum 6.00
497 30-Apr-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/915 Cum 6.00
498 1-May-19 Block - A PCC Grade Slab RDC Con RMC M-10 3HY19BP1/918 Cum 2.00
499 2-May-19 Block - C Plinth Beam RDC Con RMC M-40 3HY19BP1/933 Cum 3.00
500 2-May-19 Block - B Retainingwall PCC RDC Con RMC M-10 3HY19BP1/936 Cum 6.00
501 2-May-19 Block - C Plinth Beam RDC Con RMC M-40 3HY19BP1/940 Cum 4.00 0.2 Block-A
502 2-May-19 Block - B Retainingwall PCC RDC Con RMC M-10 3HY19BP1/941 Cum 7.00
503 2-May-19 Block - C Plinth Beam RDC Con RMC M-40 3HY19BP1/947 Cum 3.00
504 3-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/957 Cum 3.00
505 3-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/960 Cum 3.00
506 3-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/966 Cum 3.00
507 3-May-19 Block - A & B EF Footings & B-Reating RDC Con RMC M-10 3HY19BP2/36 Cum 6.00 A-4 B-2
508 4-May-19 Block - B Pedestals RDC Con RMC M-40 3HY19BP1/985 Cum 3.00
509 4-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/990 Cum 3.50
510 4-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/996 Cum 6.00
511 4-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/998 Cum 7.00
512 4-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1001 Cum 6.00
513 4-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1002 Cum 7.00
514 4-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1007 Cum 4.00
515 4-May-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/1010 Cum 6.00
516 4-May-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/1011 Cum 6.00
517 4-May-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/1012 Cum 7.00
518 4-May-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/1013 Cum 6.00
519 4-May-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/1014 Cum 6.00
520 6-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/1059 Cum 3.00 10.00
521 6-May-19 Block - C Columns RDC Con RMC M-40 3HY19BP1/1059 Cum 3.50
522 6-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/1063 Cum 3.00
523 6-May-19 Block - C Columns RDC Con RMC M-40 3HY19BP1/1064 Cum 3.00
524 6-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/1065 Cum 4.00 6.50
525 7-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/1074 Cum 4.00
526 7-May-19 Block - C Columns RDC Con RMC M-40 3HY19BP1/1082 Cum 4.00
527 7-May-19 Block - B Footing PCC RDC Con RMC M-10 3HY19BP1/1085 Cum 3.00
528 7-May-19 Block - B Footing PCC RDC Con RMC M-10 3HY19BP1/1086 Cum 3.00
529 7-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1087 Cum 7.00
530 7-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1088 Cum 6.00
531 7-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1089 Cum 6.00
532 7-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1091 Cum 6.00
533 7-May-19 Block - B Footings RCC RDC Con RMC M-20 3HY19BP1/1094 Cum 7.00
534 7-May-19 Block - B Footings RCC RDC Con RMC M-20 3HY19BP1/1095 Cum 6.00
535 7-May-19 Block - B Footings RCC RDC Con RMC M-20 3HY19BP1/1099 Cum 6.00
536 7-May-19 Block - B Footings RCC RDC Con RMC M-20 3HY19BP1/1104 Cum 5.50
537 8-May-19 Block - B Pedestal RDC Con RMC M-40 3HY19BP1/1120 Cum 4.00
538 8-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/1123 Cum 4.00
539 8-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/1124 Cum 3.00
540 8-May-19 Block - C Columns RDC Con RMC M-40 3HY19BP1/1125 Cum 3.00
541 8-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/1126 Cum 4.00
542 8-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/1127 Cum 4.00
543 8-May-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/1129 Cum 5.00
544 8-May-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/1132 Cum 3.00
545 9-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/1164 Cum 3.00
546 9-May-19 Block - C Columns RDC Con RMC M-40 3HY19BP1/1171 Cum 4.00
547 9-May-19 Block - A Columns RDC Con RMC M-40 3HY19BP1/1173 Cum 3.00
548 9-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1175 Cum 6.00
549 9-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1176 Cum 6.00
550 9-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1179 Cum 7.00
551 9-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 5HY19/AR-MN14 Cum 6.00
552 9-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1180 Cum 7.00
553 10-May-19 Block - B Pedestal RDC Con RMC M-40 3HY19BP1/1183 Cum 3.00
554 10-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1188 Cum 7.00
555 10-May-19 Block - C Columns RDC Con RMC M-40 3HY19BP1/1189 Cum 4.50
556 10-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1190 Cum 7.00
557 10-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1191 Cum 6.00
558 10-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1194 Cum 6.00
559 10-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1197 Cum 6.00
560 10-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1199 Cum 7.00
561 10-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19/AR-MN19 Cum 7.00
562 10-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 1836202418939 Cum 7.00
564 10-May-19 Block - A Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1200 Cum 7.00
563 11-May-19 Block - B Footing RCC RDC Con RMC M-20 1836202418947 Cum 5.00
565 11-May-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/1202 Cum 6.00
566 11-May-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/1203 Cum 6.00
567 11-May-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/1204 Cum 6.00
568 11-May-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/1205 Cum 7.00
569 11-May-19 Block - B Footing RCC RDC Con RMC M-20 3HY19BP1/1207 Cum 3.00
570 12-May-19 Block - C Columns Aparna RMC M-40 1203001849 Cum 4.50
571 12-May-19 Block - C Columns ACC Con RMC M-40 NS2Q36190100098Cum 3.50
572 13-May-19 Block - B Pedestal Aparna RMC M-40 1203001905 Cum 3.00
573 13-May-19 Block - C Columns ACC Con RMC M-40 NS2Q36190100103Cum 5.00
574 13-May-19 Block - B Pedestal Aparna RMC M-40 1203001916 Cum 3.00
575 13-May-19 Block - B Footing RCC Aparna RMC M-20 1203001917 Cum 4.50
576 14-May-19 Block - B Footing RCC ACC Con RMC M-20 NS2Q36190100106Cum 6.00
577 14-May-19 Block - B Footing RCC ACC Con RMC M-20 NS2Q36190100106Cum 3.50
578 14-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100107Cum 7.00
579 14-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100107Cum 7.00
580 14-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100107Cum 7.00
581 14-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100107Cum 7.00
582 14-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100107Cum 7.00
583 15-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100107Cum 4.00
584 15-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100108Cum 2.00
585 15-May-19 Block - C Columns ACC Con RMC M-40 NS2Q36190100109Cum 3.00
586 15-May-19 DG PCC DG, Cutting & Bending Me ACC Con RMC M-10 NS2Q36190100109Cum 3.00
587 15-May-19 Block - C Columns ACC Con RMC M-40 NS2Q36190100110Cum 3.00
588 16-May-19 Block - B Pedestal & EF Columns Aparna RMC M-40 1203001985 Cum 3.00
589 16-May-19 Block - C Columns 2nd Lif ACC Con RMC M-40 NS2Q36190100111Cum 3.00
590 17-May-19 Block - C Columns RDC Con RMC M-40 3HY19BP1/1382 Cum 3.50
591 17-May-19 Block - C Columns RDC Con RMC M-40 3HY19BP1/1386 Cum 3.50
592 18-May-19 Block - C Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1428 Cum 7.00
593 18-May-19 Block - C Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1430 Cum 6.00
594 18-May-19 Block - C Grade Slab PCC RDC Con RMC M-10 6HY19/AR-SI378 Cum 7.00
595 18-May-19 Block - C Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1434 Cum 7.00
596 18-May-19 Block - C Grade Slab PCC RDC Con RMC M-10 3HY19BP1/1438 Cum 6.00
597 18-May-19 Block - A 1st Slab Concrete RDC Con RMC M-40 3HY19BP1/1443 Cum 3.00
598 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1445 Cum 6.00
599 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1446 Cum 7.00
600 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 6HY19/AR-SI388 Cum 7.00
601 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1447 Cum 6.00
602 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1449 Cum 7.00
603 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 6HY19/AR-SI390 Cum 6.00
604 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1450 Cum 6.00
605 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 6HY19/AR-SI393 Cum 6.00
606 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1452 Cum 7.00
607 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-40 3HY19BP1/1453 Cum 6.00
608 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-40 6HY19/AR-SI394 Cum 6.00
609 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1455 Cum 7.00
610 19-May-19 Block-C Columns ACC Con RMC M-40 NS2Q36190100115Cum 4.00
611 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1456 Cum 6.00
612 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1457 Cum 6.00
613 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1458 Cum 6.00
614 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 6HY19/AR-SI395 Cum 7.00
615 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1459 Cum 6.00
616 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-40 3HY19BP1/1460 Cum 6.00
617 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-40 3HY19BP1/1461 Cum 1.00
618 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1462 Cum 7.00
619 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1464 Cum 7.00
620 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP1/1465 Cum 6.00
621 19-May-19 Block - B Footing Rcc RDC Con RMC M-25 3HY19BP2/59 Cum 6.00
622 19-May-19 Block - A 1st Slab Concrete RDC Con RMC M-25 3HY19BP2/57 Cum 6.00 sa
623 19-May-19 Block - B Footing Rcc RDC Con RMC M-25 3HY19BP2/57 Cum 1.00
624 19-May-19 Block - B Footing Rcc RDC Con RMC M-25 3HY19BP1/1474 Cum 3.50
625 19-May-19 Block - B Footing Rcc RDC Con RMC M-25 3HY19BP1/1475 Cum 0.50
626 20-May-19 Block - C Columns RDC Con RMC M-40 3HY19BP1/1480 Cum 3.50
627 20-May-19 Block - C Columns RDC Con RMC M-40 3HY19BP1/1479 Cum 3.00
628 20-May-19 Block - C Columns ACC Con RMC M-40 NS2Q36190100117Cum 3.00
629 20-May-19 Block - B Footing Rcc RDC Con RMC M-20 3HY19BP1/1483 Cum 6.00
630 20-May-19 Block - B Footing Rcc RDC Con RMC M-20 3HY19BP2/60 Cum 6.00
631 20-May-19 Block - B Footing Rcc RDC Con RMC M-20 3HY19BP2/61 Cum 6.00
632 20-May-19 Block - B Footing Rcc RDC Con RMC M-20 3HY19BP1/1484 Cum 1.40
633 20-May-19 Block - B Footing Rcc RDC Con RMC M-20 3HY19BP2/62 Cum 5.50
634 20-May-19 Block - B Footing Rcc RDC Con RMC M-20 3HY19BP2/63 Cum 2.50
635 21-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100117Cum 5.00
636 21-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100116Cum 6.50
637 21-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100116Cum 6.50
638 21-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100116Cum 7.00
639 21-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100118Cum 3.00
640 21-May-19 Block - B Pedestal ACC Con RMC M-40 NS2Q36190100116Cum 4.50 1 A
641 21-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100117Cum 6.00
642 21-May-19 Block - B Footing RCC ACC Con RMC M-20 NS2Q36190100118Cum 2.50
643 21-May-19 Block - B Retaining Wall ACC Con RMC M-25 NS2Q36190100118Cum 6.00
644 22-May-19 Block - B Retaining Wall ACC Con RMC M-25 NS2Q36190100118Cum 4.00
645 22-May-19 Block - C Columns PRISM RMC M-40 6119997025 Cum 3.00
646 22-May-19 Block - A Lif Wall RDC Con RMC M-40 3HY19BP2/64 Cum 3.50
647 22-May-19 Block - C Columns RDC Con RMC M-40 3HY19BP2/64 Cum 1.00
648 22-May-19 Block - C Columns PRISM RMC M-40 6119997031 Cum 3.00
649 23-May-19 Block - C Lif Wall PRISM RMC M-40 6119997036 Cum 3.00
650 23-May-19 Block - C Lif Wall PRISM RMC M-40 6119997043 Cum 3.00
651 24-May-19 Block - A Columns PRISM RMC M-40 6119997066 Cum 3.00
652 24-May-19 Block - C Columns PRISM RMC M-40 6119997068 Cum 3.00
653 24-May-19 Block - C Columns PRISM RMC M-40 6119997073 Cum 3.50
654 24-May-19 Block - A Footing PCC PRISM RMC M-10 6119997075 Cum 6.00
655 25-May-19 Block - C Columns PRISM RMC M-40 6119997085 Cum 4.00
656 25-May-19 Block - B Retaining Wall PCC PRISM RMC M-10 6119997086 Cum 6.00
657 25-May-19 Block - B Footing RCC PRISM RMC M-20 6119997090 Cum 7.00
658 25-May-19 Block - B Footing RCC PRISM RMC M-20 6119997091 Cum 7.00
659 25-May-19 Block - B Footing RCC PRISM RMC M-20 6119997092 Cum 6.00
660 25-May-19 Block - B Footing RCC PRISM RMC M-20 6119997093 Cum 6.00
661 25-May-19 Block - B Footing RCC PRISM RMC M-20 6119997094 Cum 5.00
662 25-May-19 Block - C Columns PRISM RMC M-40 6119997095 Cum 3.00
663 25-May-19 Block - B Footing RCC PRISM RMC M-20 6119997096 Cum 2.00
664 26-May-19 Block - A Columns PRISM RMC M-40 6119997109 Cum 4.50
665 26-May-19 Block - A Staircase PRISM RMC M-20 6119997115 Cum 3.00
666 27-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100124Cum 7.00
667 27-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100124Cum 7.00
668 27-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100124Cum 7.00
669 27-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100124Cum 7.00
670 27-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100125Cum 7.00
671 27-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100125Cum 7.00
672 27-May-19 Block - C Grade Slab PCC ACC Con RMC M-10 NS2Q36190100125Cum 7.00
673 28-May-19 Block - C Columns PRISM RMC M-40 6119997123 Cum 3.00
674 28-May-19 Block - B Footing Rcc ACC Con RMC M-20 NS2Q36190100128Cum 6.00
675 28-May-19 Block - B Footing Rcc ACC Con RMC M-20 NS2Q36190100128Cum 6.00
676 28-May-19 Block - B Footing Rcc ACC Con RMC M-20 NS2Q36190100129Cum 7.00
677 28-May-19 Block - B Footing Rcc ACC Con RMC M-20 NS2Q36190100129Cum 6.50
678 28-May-19 Block - B Lif Raf ACC Con RMC M-20 NS2Q36190100129Cum 6.50
679 28-May-19 Block - B Lif Raf ACC Con RMC M-20 NS2Q36190100129Cum 6.50
680 28-May-19 Block - B Lif Raf ACC Con RMC M-20 NS2Q36190100129Cum 6.50
681 28-May-19 Block - B Lif Raf ACC Con RMC M-20 NS2Q36190100129Cum 6.50
682 28-May-19 Block - B Lif Raf ACC Con RMC M-20 NS2Q36190100130Cum 6.50
683 28-May-19 Block - B Raf-3 ACC Con RMC M-20 NS2Q36190100130Cum 6.50
684 28-May-19 Block - B Raf-3 ACC Con RMC M-20 NS2Q36190100130Cum 6.50
685 28-May-19 Block - B Raf-3 ACC Con RMC M-20 NS2Q36190100130Cum 6.50
686 29-May-19 Labour Labour camp PCC ACC Con RMC M-10 NS2Q36190100132Cum 6.00
687 29-May-19 Labour Labour camp PCC ACC Con RMC M-10 NS2Q36190100132Cum 6.00
688 29-May-19 Labour Labour camp PCC ACC Con RMC M-10 NS2Q36190100133Cum 7.00
689 29-May-19 Labour Labour camp PCC ACC Con RMC M-10 NS2Q36190100133Cum 6.00 9375
690 29-May-19 Labour Labour camp PCC ACC Con RMC M-10 NS2Q36190100133Cum 6.00 1041.67
691 31-May-19 Block-C Columns 2nd Lif ACC Con RMC M-40 NS2Q36190100142Cum 3.00
692 31-May-19 Block-A LIFT Wall RDC Con RMC M-40 3HY19BP1/1794 Cum 4.00
693 31-May-19 Block-A LIFT Wall RDC Con RMC M-40 3HY19BP1/1803 Cum 3.00
694 31-May-19 Block-A LIFT Wall RDC Con RMC M-40 3HY19BP1/1804 Cum 5.00
695 31-May-19 Block-A LIFT Wall RDC Con RMC M-40 3HY19BP1/1804 Cum 2.00
696 31-May-19 Block-A Staircase RDC Con RMC M-40 3HY19BP1/1811 Cum 1.30
697 31-May-19 Block-B Plinth Beam PCC RDC Con RMC M-40 3HY19BP1/1811 Cum 0.70
698 1-Jun-19 Block-B Plinth Beam PCC PRISM RMC M-10 6119997192 Cum 3.00
699 1-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997200 Cum 7.00
700 1-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997201 Cum 7.00
701 1-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997203 Cum 6.00
702 1-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997204 Cum 7.00
703 1-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997205 Cum 7.00
704 1-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997206 Cum 7.00
705 1-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997209 Cum 6.00
706 1-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997210 Cum 7.00
707 1-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997211 Cum 6.00
708 3-Jun-19 Block-C Columns ACC Con RMC M-40 NS2Q36190100554Cum 3.00
709 3-Jun-19 Block-B Footings RCC RDC Con RMC M-40 3HY19BP1/1865 Cum 6.00
710 3-Jun-19 Block-B Footings RCC RDC Con RMC M-25 3HY19BP1/1866 Cum 7.00
711 3-Jun-19 Block-B Footings RCC RDC Con RMC M-25 3HY19BP1/1867 Cum 7.00
712 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-40 3HY19BP1/1883 Cum 3.00
713 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1886 Cum 6.00
714 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1887 Cum 7.00
715 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-40 NS2Q36190100156Cum 4.00
716 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-25 NS2Q36190100156Cum 6.50
717 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1889 Cum 7.00
718 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-40 3HY19BP1/1890 Cum 6.00
719 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 6HY19/AR-SI814 Cum 7.00
720 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-25 NS2Q36190100156Cum 6.50
721 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-25 NS2Q36190100156Cum 6.50
722 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1891 Cum 6.00
723 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 6HY19/AR-SI815 Cum 7.00
724 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1892 Cum 6.00
725 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1894 Cum 7.00
726 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-40 NS2Q36190100156Cum 3.50
727 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-25 NS2Q36190100157Cum 6.50
728 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1895 Cum 6.00
729 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-40 6HY19/AR-SI821 Cum 6.00
730 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1896 Cum 6.00
731 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-25 NS2Q36190100157Cum 6.50
732 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1897 Cum 6.00
733 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1898 Cum 6.00
734 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP2/84 Cum 6.00
735 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-40 NS2Q36190100157Cum 4.00
736 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-25 NS2Q36190100157Cum 6.50
737 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-25 NS2Q36190100157Cum 6.50
738 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-25 NS2Q36190100157Cum 6.50
739 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1901 Cum 6.00
740 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1902 Cum 6.00
741 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-25 NS2Q36190100157Cum 6.50 A&B
742 4-Jun-19 Block-C 1st Slab Concrete Pour-1 ACC Con RMC M-40 NS2Q36190100158Cum 3.00 235.5
743 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-40 3HY19BP1/1906 Cum 6.00
744 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1907 Cum 6.00
745 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1908 Cum 6.00
746 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1909 Cum 7.00
747 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-40 3HY19BP1/1911 Cum 7.00
748 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1912 Cum 6.00
749 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1913 Cum 7.00
750 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1914 Cum 6.00
751 4-Jun-19 Block-A 1st Slab Concrete Pour-2 RDC Con RMC M-25 3HY19BP1/1915 Cum 1.50
752 5-Jun-19 Block-C Columns RDC Con RMC M-40 3HY19BP2/93 Cum 3.00
753 6-Jun-19 Block-B Plinth Beam RCC RDC Con RMC M-40 3HY19BP1/1928 Cum 3.00
754 6-Jun-19 Block-B Plinth Beam RCC ACC Con RMC M-40 NS2Q36190100066Cum 4.00
755 7-Jun-19 Block-B Reataining Wall RDC Con RMC M-25 3HY19BP1/1970 Cum 7.00
756 7-Jun-19 Block-C Columns ACC Con RMC M-40 NS2Q36190100073Cum 3.00
757 7-Jun-19 Block-B Reataining Wall RDC Con RMC M-25 3HY19BP1/1977 Cum 5.00
758 7-Jun-19 Block-B Footing RCC RDC Con RMC M-20 3HY19BP1/1984 Cum 6.00
759 7-Jun-19 Block-B Footing RCC RDC Con RMC M-20 3HY19BP1/1985 Cum 7.00
760 7-Jun-19 Block-B Footing RCC RDC Con RMC M-20 3HY19BP1/1989 Cum 7.00
761 7-Jun-19 Block-B Footing RCC RDC Con RMC M-20 3HY19BP1/1994 Cum 7.00
762 7-Jun-19 Block-B Footing RCC RDC Con RMC M-20 3HY19BP1/1996 Cum 6.00
763 8-Jun-19 Block-B Footing RCC RDC Con RMC M-20 3HY19BP1/2000 Cum 7.00
764 8-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997259 Cum 3.00
765 8-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997258 Cum 7.00
766 8-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997257 Cum 7.00
767 8-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997256 Cum 7.00
768 8-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997255 Cum 7.00
769 8-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997252 Cum 7.00
770 8-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997251 Cum 6.00
771 8-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997246 Cum 7.00
772 8-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997245 Cum 7.00
773 9-Jun-19 Block-C Staircase ACC Con RMC M-40 NS2Q36190100170Cum 3.50
774 10-Jun-19 Block-C Staircase-2 PRISM RMC M-40 6119997281 Cum 4.00
775 10-Jun-19 Block-B Retaining Wall Raf PCC ACC Con RMC M-10 NS2Q36190100174Cum 3.00
776 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-40 3HY19BP1/2081 Cum 4.00
777 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 3HY19BP1/2083 Cum 6.00
778 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 6HY19/AR-SI935 Cum 6.00
779 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 6HY19/AR-SI934 Cum 6.00
780 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-40 3HY19BP1/2084 Cum 6.00
781 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 3HY19BP1/2085 Cum 6.00
782 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 3HY19BP1/2086 Cum 6.00
783 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 3HY19BP1/2087 Cum 6.00
784 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 3HY19BP1/2089 Cum 6.00
785 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 6HY19/AR-SI36 Cum 6.00
786 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 3HY19BP1/2088 Cum 6.00
787 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 6HY19/AR-SI937 Cum 6.00
788 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 3HY19BP1/2090 Cum 6.00
789 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 6HY19/AR-SI938 Cum 6.00
790 10-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-40 3HY19BP1/2092 Cum 6.00
791 11-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-40 3HY19BP1/2094 Cum 1.50
792 11-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-40 6HY19/AR-SI945 Cum 4.50
793 11-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 6HY19/AR-SI947 Cum 6.00
794 11-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 6HY19/AR-SI949 Cum 6.00
795 11-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 6HY19/AR-SI950 Cum 6.00
796 11-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 6HY19/AR-SI953 Cum 7.00
797 11-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 6HY19/AR-SI955 Cum 6.00
798 11-Jun-19 Block-A 1st slab pour-3 RDC Con RMC M-25 3HY19BP1/2098 Cum 1.00
799 11-Jun-19 Block-B Plinth Beam ACC Con RMC M-40 NS2Q36190100177Cum 4.00
800 11-Jun-19 Block-B Plinth Beam,Pedestal ACC Con RMC M-40 NS2Q36190100178Cum 6.00
801 11-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-25 6119997300 Cum 6.00
802 11-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997304 Cum 6.00
803 11-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997305 Cum 7.00
804 11-Jun-19 Block-B Lif Wall ACC Con RMC M-40 NS2Q36190100180Cum 5.00
805 11-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997306 Cum 7.00
806 11-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997310 Cum 6.00
807 11-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997311 Cum 7.00
808 11-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997312 Cum 7.00
809 11-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997313 Cum 7.00
810 12-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997314 Cum 7.00
811 12-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997315 Cum 4.00
812 12-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997323 Cum 3.00
813 12-Jun-19 Block-B Pedestal PRISM RMC M-40 6119997336 Cum 3.00
814 12-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997346 Cum 4.00
815 12-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997349 Cum 3.00
816 12-Jun-19 Block-A Columns Af 1st Slab RDC Con RMC M-40 3HY19BP1/2162 Cum 4.00
817 12-Jun-19 Block-A PCC Grade Slab PRISM RMC M-10 6119997350 Cum 3.00
818 12-Jun-19 Block-A Columns Af 1st Slab Aparna RMC M-40 1203003264 Cum 4.00
819 12-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003278 Cum 7.00
820 12-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003281 Cum 6.00
821 12-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003285 Cum 7.00
822 12-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003286 Cum 6.00
823 12-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003290 Cum 7.00
824 12-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003291 Cum 7.00
825 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-40 NS2Q36190100191Cum 6.50
826 13-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003295 Cum 7.00
827 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100191Cum 6.50
828 13-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003297 Cum 7.00
829 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100191Cum 6.50
830 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100192Cum 6.50
831 13-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003300 Cum 6.00
832 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100192Cum 6.50
833 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100192Cum 6.00
834 13-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003303 Cum 7.00
835 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100192Cum 6.50
836 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100192Cum 6.50
837 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100192Cum 6.50
838 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100192Cum 6.50
839 13-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003306 Cum 6.00
840 13-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003307 Cum 5.00
841 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-40 NS2Q36190100192Cum 6.50
842 13-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003313 Cum 6.00
843 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-40 NS2Q36190100192Cum 6.50
844 13-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100193Cum 6.50
845 14-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100193Cum 6.50
846 14-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003318 Cum 6.00
847 14-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003321 Cum 7.00
848 14-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-40 NS2Q36190100193Cum 7.00
849 14-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100193Cum 6.50
850 14-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003322 Cum 5.00
851 14-Jun-19 Block-B Footing RCC Aparna RMC M-20 1203003324 Cum 5.00
852 14-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100193Cum 6.50
853 14-Jun-19 Block-B Footing PCC Aparna RMC M-10 1203003326 Cum 6.00
854 14-Jun-19 Block-C 1st Slab Pour-2 ACC Con RMC M-25 NS2Q36190100193Cum 5.00
855 14-Jun-19 Block-A Columns Af 1st Slab RDC Con RMC M-40 3HY19BP1/2232 Cum 4.00
856 14-Jun-19 Block-A Columns Af 1st Slab RDC Con RMC M-40 3HY19BP1/2238 Cum 3.00
857 14-Jun-19 Block-A Columns Af 1st Slab RDC Con RMC M-40 3HY19BP1/2244 Cum 3.00
858 14-Jun-19 Block-A 1st Slab Pour-4 lobby RDC Con RMC M-25 3HY19BP1/2249 Cum 6.00
859 14-Jun-19 Block-A 1st Slab Pour-4 lobby RDC Con RMC M-40 3HY19BP1/2248 Cum 4.00
860 14-Jun-19 Block-A 1st Slab Pour-4 lobby RDC Con RMC M-25 3HY19BP1/2251 Cum 7.00
861 14-Jun-19 Block-A 1st Slab Pour-4 lobby RDC Con RMC M-40 3HY19BP1/2254 Cum 5.00
862 15-Jun-19 Block-A 1st Slab Pour-4 lobby RDC Con RMC M-40 3HY19BP1/2257 Cum 3.00
863 15-Jun-19 Block-A 1st Slab Pour-4 lobby RDC Con RMC M-25 3HY19BP1/2258 Cum 4.00
864 15-Jun-19 Block-A 1st Slab Pour-4 lobby RDC Con RMC M-25 3HY19BP1/2259 Cum 2.00
865 15-Jun-19 Block-B Pedestal PRISM RMC M-40 6119997386 Cum 4.00
866 15-Jun-19 Block-B Pedestal PRISM RMC M-40 6119997388 Cum 4.00
867 15-Jun-19 Block-B Pedestal PRISM RMC M-40 6119997391 Cum 4.00
868 15-Jun-19 Block-B Pedestal PRISM RMC M-40 6119997394 Cum 4.00
869 15-Jun-19 Block-A Columns Af 1st Slab RDC Con RMC M-40 3HY19BP1/2278 Cum 5.00
870 15-Jun-19 Block-B Retaining Wall PRISM RMC M-25 6119997396 Cum 6.00
871 15-Jun-19 Block-B Retaining Wall PRISM RMC M-25 6119997397 Cum 3.00
872 15-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997398 Cum 4.00
873 16-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997399 Cum 7.00
874 16-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997400 Cum 7.00
875 16-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997401 Cum 7.00
876 16-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997402 Cum 6.00
877 16-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997403 Cum 6.00
878 16-Jun-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997404 Cum 5.00
879 16-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997405 Cum 5.50
880 16-Jun-19 Block-A Podium Columns PRISM RMC M-40 6119997406 Cum 4.00
881 17-Jun-19 Block-A Podium Columns PRISM RMC M-40 6119997423 Cum 4.00
882 17-Jun-19 Block-B Retaining Wall North PRISM RMC M-40 6119997426 Cum 4.50
883 17-Jun-19 Block-B Lif Wall PRISM RMC M-40 6119997431 Cum 4.00
884 17-Jun-19 Block-B Retaining Wall North PRISM RMC M-40 6119997434 Cum 6.00
885 17-Jun-19 Block-B Pedestals PRISM RMC M-40 6119997435 Cum 3.00
886 17-Jun-19 Tower crane Tower crane PCC-2 PRISM RMC M-10 6119997437 Cum 4.00
887 17-Jun-19 Block-C Lif Wall PRISM RMC M-40 6119997438 Cum 5.00
888 17-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997439 Cum 4.00
889 17-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997446 Cum 4.00
890 18-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997451 Cum 6.00
891 18-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997452 Cum 5.50
892 18-Jun-19 Block-C Columns Af 1st Slab PRISM RMC M-40 6119997453 Cum 3.00
893 18-Jun-19 Block-C Columns Af 1st Slab PRISM RMC M-40 6119997455 Cum 4.00
894 18-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997456 Cum 4.00
895 18-Jun-19 Block-A Podium Footings PRISM RMC M-20 6119997457 Cum 5.00
896 18-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997459 Cum 4.00
897 18-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997460 Cum 4.00
898 19-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997461 Cum 4.00
899 19-Jun-19 Block-B Pedestals PRISM RMC M-40 6119997462 Cum 4.00
900 19-Jun-19 Block-C Columns Af 1st Slab RDC Con RMC M-40 3HY19BP1/2410 Cum 3.00
901 19-Jun-19 Block-B Pedestal PRISM RMC M-40 6119997463 Cum 5.00
902 19-Jun-19 Block-B Pedestal RDC Con RMC M-40 3HY19BP1/2420 Cum 3.00
903 19-Jun-19 Block-B Pedestal PRISM RMC M-40 6119997464 Cum 1.00
904 19-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997464 Cum 3.00
905 19-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997472 Cum 5.00
906 20-Jun-19 Block-A Retaining wall west af 1st PRISM RMC M-25 6119997479 Cum 5.00 0.00
907 20-Jun-19 Block-A Retaining wall west af 1st PRISM RMC M-25 6119997484 Cum 4.00
908 20-Jun-19 Block-A Retaining wall west af 1st PRISM RMC M-25 6119997487 Cum 4.00
909 20-Jun-19 Block-A Retaining wall west af 1st PRISM RMC M-25 6119997489 Cum 3.00
910 20-Jun-19 Block-A Retaining wall west af 1st PRISM RMC M-25 6119997490 Cum 3.00
911 20-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997492 Cum 3.00
912 20-Jun-19 Block-B Footing RCC PRISM RMC M-40 6119997497 Cum 3.00
913 20-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997502 Cum 6.00
914 20-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997505 Cum 6.00
915 20-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997504 Cum 6.00
916 20-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997500 Cum 6.00
917 20-Jun-19 Block-B Footing RCC PRISM RMC M-20 6119997507 Cum 3.00
918 21-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-40 6119997527 Cum 6.00
919 21-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-25 6119997528 Cum 7.00
920 21-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-40 6119997526 Cum 7.00
921 21-Jun-19 Block-C Tower crane footing-2 PRISM RMC M-40 6119997525 Cum 7.00
922 21-Jun-19 Block-C Tower crane footing-2 PRISM RMC M-40 6119997524 Cum 7.00
923 21-Jun-19 Block-C Tower crane footing-2 PRISM RMC M-40 6119997523 Cum 7.00
924 21-Jun-19 Block-C Tower crane footing-2 PRISM RMC M-40 6119997522 Cum 3.50
925 21-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997518 Cum 3.50
926 21-Jun-19 Labour camp Labour camp PCC RDC Con RMC M-10 3HY19BP1/2506 Cum 6.00
927 21-Jun-19 Block-C Columns Af 1st Slab PRISM RMC M-40 6119997510 Cum 3.50
928 21-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997509 Cum 2.00
929 21-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997509 Cum 1.00
930 21-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-25 6119997529 Cum 7.00
931 21-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-25 6119997530 Cum 7.00
932 21-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-40 6119997532 Cum 6.00
933 21-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-25 6119997533 Cum 6.00
934 21-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-25 6119997534 Cum 7.00
935 22-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-40 6119997539 Cum 6.00
936 22-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-25 6119997542 Cum 7.00
937 22-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-25 6119997544 Cum 6.00
938 22-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-25 6119997550 Cum 7.00
939 22-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-25 6119997552 Cum 7.00
940 22-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-40 6119997556 Cum 5.00
941 22-Jun-19 Block-C 1st Slab 3rd Pour PRISM RMC M-25 6119997560 Cum 2.50
942 22-Jun-19 Block-B Pedestals PRISM RMC M-40 6119997561 Cum 4.00
943 22-Jun-19 Block-B Pedestals RDC Con RMC M-40 3HY19BP1/2531 Cum 4.00
944 22-Jun-19 Block-A&B Podium Footing RCC PRISM RMC M-20 6119997575 Cum 5.00
945 22-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997577 Cum 4.00
946 22-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997581 Cum 5.00
947 22-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997587 Cum 1.00
948 22-Jun-19 Block-B Pedestals PRISM RMC M-40 6119997587 Cum 2.00
949 22-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997602 Cum 2.00
950 22-Jun-19 Block-B Pedestals PRISM RMC M-40 6119997602 Cum 1.00
951 24-Jun-19 Block-C Columns RDC Con RMC M-40 3HY19BP1/2597 Cum 3.00
952 24-Jun-19 Block-A Columns RDC Con RMC M-40 3HY19BP1/2605 Cum 4.00
953 24-Jun-19 Block-A Retaining wall AF 1st slab PRISM RMC M-25 6119997621 Cum 4.00
954 24-Jun-19 Block-A Retaining wall AF 1st slab PRISM RMC M-25 6119997624 Cum 3.50
955 24-Jun-19 Block-A& B Retaining wall AF 1st slab PRISM RMC M-25 6119997625 Cum 4.50
956 24-Jun-19 Block-B Retaining wall west side PRISM RMC M-25 6119997626 Cum 3.00
957 25-Jun-19 Block-B Retaining wall west side PRISM RMC M-25 6119997630 Cum 4.00
958 25-Jun-19 Block-C Columns Af 1st Slab ACC Con RMC M-40 NS3R36190100130Cum 4.00
959 25-Jun-19 Block-B Pedestal ACC Con RMC M-40 NS3R36190100130Cum 4.00
960 25-Jun-19 Block-B Plinth Beam PCC ACC Con RMC M-10 NS3R36190100131Cum 3.00
961 25-Jun-19 Block-C Columns Af 1st Slab ACC Con RMC M-40 NS3R36190100131Cum 3.00
962 25-Jun-19 Block-B Pedestals PRISM RMC M-40 6119997651 Cum 4.00
963 25-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997653 Cum 4.00
964 25-Jun-19 Block-A Retaining wall west side PRISM RMC M-25 6119997657 Cum 3.50
965 26-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997671 Cum 3.00
966 26-Jun-19 Block-A Columns Af 1st Slab ACC Con RMC M-40 NS2Q36190100234Cum 4.00
967 26-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997672 Cum 4.00
968 26-Jun-19 Block-C Staircase 2nd Lif ACC Con RMC M-40 NS3R36190100131Cum 7.00
969 26-Jun-19 Block-B Pedestals RDC Con RMC M-40 3HY19BP2/120 Cum 3.00
970 26-Jun-19 Block-C 1st Slab Pour 4 ACC Con RMC M-40 NS3R36190100134Cum 6.00
971 26-Jun-19 Block-B Plinth Beam PCC PRISM RMC M-10 6119997689 Cum 4.00
972 26-Jun-19 Block-C 1st Slab Pour 4 ACC Con RMC M-25 NS2Q36190100235Cum 6.00
973 26-Jun-19 Block-C 1st Slab Pour 4 ACC Con RMC M-40 NS3R36190100134Cum 5.00
974 26-Jun-19 Block-C 1st Slab Pour 4 ACC Con RMC M-25 NS2Q36190100235Cum 6.50
975 27-Jun-19 Block-C Columns Af 1st Slab ACC Con RMC M-40 NS3R36190100137Cum 3.00
976 27-Jun-19 Block-A Retaining wall west side PRISM RMC M-25 6119997718 Cum 3.00
977 27-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997728 Cum 3.00
978 27-Jun-19 Block-B Retaining Wall B&C ACC Con RMC M-40 NS3R36190100140Cum 4.00
979 27-Jun-19 Block-A Plinth Beam PCC RDC Con RMC M-10 3HY19BP2/151 Cum 3.00
980 27-Jun-19 Block-B Retaining Wall B&C ACC Con RMC M-40 NS3R36190100140Cum 3.00
981 27-Jun-19 Block-A 1st Slab Pour-5 Podium ACC Con RMC M-25 NS3R36190100140Cum 4.00
982 28-Jun-19 Block-A 1st Slab Pour-5 Podium ACC Con RMC M-40 NS3R36190100142Cum 3.00
983 28-Jun-19 Block-A 1st Slab Pour-5 Podium ACC Con RMC M-25 NS3R36190100142Cum 6.00
984 28-Jun-19 Block-A 1st Slab Pour-5 Podium ACC Con RMC M-25 NS3R36190100142Cum 3.00
985 28-Jun-19 Block-A 1st Slab Pour-5 Podium ACC Con RMC M-25 NS3R36190100141Cum 5.00
986 28-Jun-19 Block-A 1st Slab Pour-5 Podium ACC Con RMC M-25 NS3R36190100143Cum 6.00
987 28-Jun-19 Block-A 1st Slab Pour-5 Podium ACC Con RMC M-25 NS3R36190100141Cum 5.00
988 28-Jun-19 Block-A 1st Slab Pour-5 Podium ACC Con RMC M-25 NS3R36190100143Cum 6.00
989 28-Jun-19 Block-A 1st Slab Pour-5 Podium ACC Con RMC M-25 NS3R36190100143Cum 6.00
990 28-Jun-19 Block-A 1st Slab Pour-5 Podium ACC Con RMC M-25 NS3R36190100143Cum 6.00
991 28-Jun-19 Block-A 1st Slab Pour-5 Podium PRISM RMC M-25 6119997766 Cum 3.00
992 28-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997778 Cum 3.00
993 28-Jun-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997779 Cum 3.00
994 29-Jun-19 Block-C Columns Af 1st Slab PRISM RMC M-40 6119997793 Cum 3.50
995 29-Jun-19 Labour camp Labour camp PCC PRISM RMC M-10 6119997795 Cum 4.00
996 29-Jun-19 Block-C Columns Af 1st Slab PRISM RMC M-40 6119997796 Cum 3.50
997 29-Jun-19 Block-A Plinth Beam RCC PRISM RMC M-40 6119997806 Cum 5.00
998 29-Jun-19 Block-C Columns Af 1st Slab PRISM RMC M-40 6119997803 Cum 3.00
999 30-Jun-19 Block-C Columns Af 1st Slab PRISM RMC M-40 6119997816 Cum 3.50
### 1-Jul-19 Block-B Pedestals PRISM RMC M-40 6119997830 Cum 4.00
### 1-Jul-19 Block-A Retaining Wall ACC Con RMC M-25 NS2Q36190100252Cum 3.00
### 1-Jul-19 Block-C Tower crane Counter wt PRISM RMC M-40 6119997831 Cum 4.50
### 1-Jul-19 Block-B Podium Columns PRISM RMC M-40 6119997836 Cum 4.00
### 1-Jul-19 Block-A Retaining Wall ACC Con RMC M-25 NS2Q36190100253Cum 5.00
### 1-Jul-19 Block-A Retaining Wall ACC Con RMC M-25 NS2Q36190100254Cum 5.00
### 1-Jul-19 Block-B Pedestals PRISM RMC M-40 6119997840 Cum 4.00
### 1-Jul-19 Block-A Retaining Wall ACC Con RMC M-25 NS2Q36190100254Cum 5.00
### 1-Jul-19 Block-A Columns Af 1st Slab ACC Con RMC M-40 NS2Q36190100254Cum 3.00
### 1-Jul-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997843 Cum 4.00
### 1-Jul-19 Block-A Staircase PRISM RMC M-40 6119997841 Cum 5.00
### 1-Jul-19 Block-B Retaining Wall Raf PRISM RMC M-20 6119997842 Cum 5.00
### 2-Jul-19 Block-B Plith Beam RCC PRISM RMC M-40 6119997845 Cum 3.00
### 2-Jul-19 Block-B Plith Beam RCC PRISM RMC M-40 6119997849 Cum 4.00
### 2-Jul-19 Block-A Podium Columns PRISM RMC M-40 6119997857 Cum 3.50
### 3-Jul-19 Block-A Columns Af 1st Slab RDC Con RMC M-40 3HY19BP2/240 Cum 3.00
### 3-Jul-19 Block-A Retaining Wall South PRISM RMC M-25 6119997888 Cum 4.00
### 3-Jul-19 Block-A Retaining Wall South PRISM RMC M-25 6119997892 Cum 6.00
### 3-Jul-19 Block-A Retaining Wall South PRISM RMC M-25 6119997899 Cum 3.00
### 4-Jul-19 Block-C Columns Af 1st Slab RDC Con RMC M-40 6HY19/AR-SI1599 Cum 3.50
### 4-Jul-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997921 Cum 3.50
### 4-Jul-19 Block-C Columns Af 1st Slab RDC Con RMC M-40 3HY19BP2/262 Cum 5.00
### 4-Jul-19 Block-B Pedestal PRISM RMC M-40 6119997927 Cum 3.00
### 4-Jul-19 Block-B 1st Slab Columns PRISM RMC M-40 6119997929 Cum 3.00
### 4-Jul-19 Block-C Columns Af 1st Slab RDC Con RMC M-40 3HY19BP2/263 Cum 5.00
### 4-Jul-19 Block-A Retaining Wall South PRISM RMC M-40 6119997928 Cum 3.00
### 4-Jul-19 Block-B Plinth Beam RCC PRISM RMC M-40 6119997930 Cum 3.00
### 4-Jul-19 Block-B Plinth Beam RCC PRISM RMC M-40 6119997931 Cum 3.00
### 4-Jul-19 Block-B Plinth Beam RCC PRISM RMC M-40 6119997932 Cum 3.00
### 5-Jul-19 Block-B Retaining Wall North PRISM RMC M-40 6119997946 Cum 4.00
### 5-Jul-19 Block-B Footing PCC PRISM RMC M-10 6119997956 Cum 5.00
### 5-Jul-19 Block-B 1st Slab Columns PRISM RMC M-40 6119997953 Cum 3.00
### 5-Jul-19 Block-A Columns Af 1st Slab PRISM RMC M-40 6119997955 Cum 4.00
### 5-Jul-19 Block-B Plinth Beam RCC PRISM RMC M-40 6119997964 Cum 3.50
### 5-Jul-19 Block-B Plinth Beam RCC RDC Con RMC M-40 3HY19BP2/305 Cum 3.00
### 6-Jul-19 Labour camp Labour camp PCC PRISM RMC M-10 6119997977 Cum 4.00
### 6-Jul-19 Block-C Staircase & Columns PRISM RMC M-40 6119997979 Cum 3.00
### 6-Jul-19 Block-B Labour camp PCC PRISM RMC M-10 6119997977 Cum 4.00
### 6-Jul-19 Block-C Columns PRISM RMC M-40 6119997989 Cum 3.50
### 6-Jul-19 Block-B Plinth Beam PCC PRISM RMC M-10 6119997992 Cum 4.00
### 6-Jul-19 Block-B Plinth Beam PCC PRISM RMC M-10 6119997997 Cum 3.00
### 8-Jul-19 Block-B Columns PRISM RMC M-40 6119998025 Cum 4.00
### 8-Jul-19 Block-C Columns Af 1st Slab PRISM RMC M-40 6119998027 Cum 3.50
### 8-Jul-19 Block-B Columns PRISM RMC M-40 6119998032 Cum 4.00
### 8-Jul-19 Block-B Footing RCC PRISM RMC M-20 6119998039 Cum 7.00
### 8-Jul-19 Block-B Footing RCC PRISM RMC M-20 6119998040 Cum 6.00
### 8-Jul-19 Block-B Footing RCC PRISM RMC M-20 6119998043 Cum 6.00
### 8-Jul-19 Block-B Footing RCC PRISM RMC M-20 6119998044 Cum 7.00
### 8-Jul-19 PRISM RMC M-40 6119998045 Cum 4.50
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-40 1203004591 Cum 3.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-40 1203004599 Cum 4.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-40 1203004607 Cum 3.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004595 Cum 6.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004596 Cum 6.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004601 Cum 7.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004606 Cum 6.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004602 Cum 6.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004604 Cum 6.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004603 Cum 7.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004605 Cum 6.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004609 Cum 6.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004608 Cum 6.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004612 Cum 6.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004613 Cum 6.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004600 Cum 6.00
### 8-Jul-19 Block-A 2nd Slab Pour-1 Aparna RMC M-25 1203004597 Cum 6.00
### 9-Jul-19 Block-A Lif Wall PRISM RMC M-40 6119998051 Cum 3.00
### 9-Jul-19 Block-A Lif Wall PRISM RMC M-40 6119998052 Cum 4.00
### 9-Jul-19 Block-A Lif Wall PRISM RMC M-40 6119998058 Cum 4.00
### 9-Jul-19 Block-C 2nd Slab Pour-1 PRISM RMC M-40 6119998059 Cum 4.00
### 9-Jul-19 Block-C 2nd Slab Pour-1 PRISM RMC M-25 6119998063 Cum 7.00
### 9-Jul-19 Block-C 2nd Slab Pour-1 PRISM RMC M-25 6119998064 Cum 7.00
### 9-Jul-19 Block-C 2nd Slab Pour-1 PRISM RMC M-40 6119998066 Cum 4.00
### 10-Jul-19 Block-B Plinth Beam PCC ACC Con RMC M-10 NS3R36190100198Cum 3.00
### 10-Jul-19 Block-B Columns PRISM RMC M-40 6119998090 Cum 3.00
### 10-Jul-19 Block-B Columns PRISM RMC M-40 6119998093 Cum 3.00
### 11-Jul-19 Block-C 2nd Slab Pour-2 PRISM RMC M-40 6119998101 Cum 6.00
### 11-Jul-19 Block-C 2nd Slab Pour-2 PRISM RMC M-25 6119998103 Cum 6.00
### 11-Jul-19 Block-C 2nd Slab Pour-2 PRISM RMC M-25 6119998104 Cum 7.00
### 11-Jul-19 Block-C 2nd Slab Pour-2 PRISM RMC M-25 6119998105 Cum 7.00
### 11-Jul-19 Block-C 2nd Slab Pour-2 PRISM RMC M-25 6119998106 Cum 7.00
### 11-Jul-19 Block-C 2nd Slab Pour-2 PRISM RMC M-25 6119998108 Cum 7.00
### 11-Jul-19 Block-C 2nd Slab Pour-2 PRISM RMC M-40 6119998110 Cum 4.00
### 11-Jul-19 Block-C 2nd Slab Pour-2 PRISM RMC M-25 6119998110 Cum 6.00
### 11-Jul-19 Block-C 2nd Slab Pour-2 PRISM RMC M-25 6119998115 Cum 3.50
### 12-Jul-19 Block-B columns PRISM RMC M-40 6119998137 Cum 3.00
### 12-Jul-19 Block-C Afer1st slab columns PRISM RMC M-40 6119998139 Cum 4.00
### 12-Jul-19 Block-B columns RDC Con RMC M-40 3HY19BP2/485 Cum 3.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-40 6119998145 Cum 4.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998146 Cum 7.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998147 Cum 7.00
### 12-Jul-19 Block-c Afer1st slab columns RDC Con RMC M-40 3HY19BP2/491 Cum 4.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998152 Cum 6.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998153 Cum 7.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998154 Cum 7.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-40 6119998155 Cum 4.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998156 Cum 7.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998157 Cum 6.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998159 Cum 7.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998160 Cum 6.00
### 12-Jul-19 Block-B Columns &PLINTH BEAM PRISM RMC M-40 6119998158 Cum 4.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998163 Cum 6.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-40 6119998164 Cum 3.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998165 Cum 6.00
### 12-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998166 Cum 6.00
### 12-Jul-19 Block-B Plinth beam PRISM RMC M-40 6119998161 Cum 4.00
### 13-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998168 Cum 6.00
### 13-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998170 Cum 6.00
### 13-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998171 Cum 6.00
### 13-Jul-19 Block-B Pedastals$plinth beam PRISM RMC M-40 6119998169 Cum 3.00
### 13-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998172 Cum 6.00
### 13-Jul-19 Block-A 2nd Slab Pour-2 PRISM RMC M-25 6119998174 Cum 3.50
### 13-Jul-19 Block-C B2 TO GF Staircase PRISM RMC M-40 6119998178 Cum 4.00
### 13-Jul-19 Block-A Afer1st slab columns PRISM RMC M-40 6119998184 Cum 3.00
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998189 Cum 7.00
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998190 Cum 7.00
### 13-Jul-19 Block-C B2 TO GF Staircase PRISM RMC M-40 6119998192 Cum 3.50
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-40 6119998193 Cum 3.00
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998194 Cum 7.00
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998196 Cum 7.00
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998198 Cum 7.00
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998200 Cum 7.00
### 13-Jul-19 Block-B Columns PRISM RMC M-40 6119998206 Cum 3.00
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-40 6119998207 Cum 7.00
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998209 Cum 7.00
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998210 Cum 7.00
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998211 Cum 6.00
### 13-Jul-19 Block-B Columns PRISM RMC M-40 6119998208 Cum 4.00
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-40 6119998213 Cum 7.00
### 13-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998212 Cum 6.00
### 14-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998214 Cum 7.00
### 14-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998216 Cum 2.00
### 14-Jul-19 Block-A 2nd Slab Pour-3 PRISM RMC M-25 6119998215 Cum 6.00
### 14-Jul-19 Block-C Afer1st slab columns PRISM RMC M-40 6119998225 Cum 4.00
### 15-Jul-19 Block-C Afer1st slab columns PRISM RMC M-40 6119998246 Cum 4.00
### 15-Jul-19 Block-B Lif Wall APARNA RMC M-40 1203004923 Cum 3.50
### 15-Jul-19 Block-C 2nd Slab Pour-3 PRISM RMC M-40 6119998264 Cum 4.00
### 15-Jul-19 Block-C 2nd Slab Pour-3 PRISM RMC M-25 6119998263 Cum 7.00
### 15-Jul-19 Block-C 2nd Slab Pour-3 PRISM RMC M-25 6119998269 Cum 7.00
### 15-Jul-19 Block-B Plinth beam$lif wall APARNA RMC M-40 1203004935 Cum 4.00
### 15-Jul-19 Block-C 2nd Slab Pour-3 PRISM RMC M-40 6119998272 Cum 4.00
### 15-Jul-19 Block-C 2nd Slab Pour-3 PRISM RMC M-25 6119998281 Cum 6.00
### 15-Jul-19 Block-C 2nd Slab Pour-3 PRISM RMC M-25 6119998278 Cum 7.00
### 15-Jul-19 Block-C 2nd Slab Pour-3 PRISM RMC M-25 6119998283 Cum 7.00
### 15-Jul-19 Block-B Plinth beam$columns APARNA RMC M-40 1203004943 Cum 4.00
### 15-Jul-19 Block-C 2nd Slab Pour-3 PRISM RMC M-40 6119998282 Cum 4.00
### 15-Jul-19 Block-C 2nd Slab Pour-3 PRISM RMC M-25 6119998285 Cum 7.00
### 15-Jul-19 Block-A 1st slab pour-6 RDC Con RMC M-40 6HY19/AR-SI2073 Cum 4.00
### 15-Jul-19 Block-C 2nd Slab Pour-3 PRISM RMC M-25 6119998287 Cum 5.50
### 15-Jul-19 Block-B Columns PRISM RMC M-40 6119998288 Cum 3.00
### 15-Jul-19 Block-A 1st slab pour-6 RDC Con RMC M-25 6HY19/AR-SI2074 Cum 7.00
### 16-Jul-19 Block-A 1st slab pour-6 RDC Con RMC M-25 6HY19/AR-SI2075 Cum 6.00
### 16-Jul-19 Block-A 1st slab pour-6 RDC Con RMC M-25 3HY19BP2/593 Cum 6.00
### 16-Jul-19 Block-A 1st slab pour-6 RDC Con RMC M-25 6HY19/AR-SI2076 Cum 6.00
### 16-Jul-19 Block-A 1st slab pour-6 RDC Con RMC M-25 6HY19/AR-SI2077 Cum 6.00
### 16-Jul-19 Block-A 1st slab pour-6 RDC Con RMC M-25 6HY19/AR-SI2078 Cum 6.00
### 16-Jul-19 Block-A 1st slab pour-6 RDC Con RMC M-25 6HY19/AR-SI2079 Cum 6.00
### 16-Jul-19 Block-B Columns PRISM RMC M-40 6119998289 Cum 3.50
### 16-Jul-19 Block-A 1st slab pour-6 RDC Con RMC M-25 6HY19/AR-SI2080 Cum 6.00
### 16-Jul-19 Block-A 1st slab pour-6 RDC Con RMC M-25 3HY19BP2/594 Cum 3.00
### 16-Jul-19 Block-C B1 TO GF Lif wall PRISM RMC M-40 6119998290 Cum 4.00
### 16-Jul-19 Block-C B1 TO GF Lif wall PRISM RMC M-40 6119998301 Cum 4.00
### 16-Jul-19 Block-C B1TOGF L/W$Staircasecolumns RDC Con RMC M-40 3HY19BP2/610 Cum 3.50
### 17-Jul-19 Block-C B1 2nd lif columns flat no3 ACC Con RMC M-40 NS3R36190100237Cum 3.00
### 17-Jul-19 Block-B#C Columns (3+1) RDC Con RMC M-40 6HY19/AR-SI2141 Cum 4.00
### 17-Jul-19 Block-B Columns Aparna RMC M-40 1204005222 Cum 4.00
### 17-Jul-19 Block-A$B column junction#columns(2.5+1.5) RDC Con RMC M-40 6HY19/AR-SI2141 Cum 4.00
### 17-Jul-19 Block-A 2nd slab pour-4 RDC Con RMC M-25 6HY19/AR-SI2155 Cum 6.00
### 17-Jul-19 Block-A 2nd slab pour-4 RDC Con RMC M-25 6HY19/AR-SI2157 Cum 3.00
### 18-Jul-19 Block-B Columns$Pedastals RDC Con RMC M-40 3HY19BP2/620 Cum 3.00
### 18-Jul-19 Block-B Grade Slab PCC RDC Con RMC M-10 3HY19BP2/625 Cum 7.00
### 18-Jul-19 Block-B Grade Slab PCC RDC Con RMC M-10 6HY19/AR-SI2187 Cum 6.00
### 18-Jul-19 Block-A$C Podium columns#starters Aparna RMC M-40 1203005097 Cum 3.00
### 18-Jul-19 Block-B Grade Slab PCC RDC Con RMC M-10 3HY19BP1/2616 Cum 6.00
### 18-Jul-19 Block-B Grade Slab PCC RDC Con RMC M-10 6HY19/AR-SI2192 Cum 6.00
### 18-Jul-19 Block-B Grade Slab PCC RDC Con RMC M-10 6HY19/AR-SI2193 Cum 7.00
### 18-Jul-19 Block-B Pcc for plinth beam RDC Con RMC M-10 3HY19BP2/626 Cum 7.00
### 18-Jul-19 Block-B Pcc for plinth beam RDC Con RMC M-10 6HY19/AR-SI2194 Cum 7.00
### 18-Jul-19 Block-B Grade Slab PCC RDC Con RMC M-10 3HY19BP2/629 Cum 7.00
### 18-Jul-19 Block-B Grade Slab PCC RDC Con RMC M-10 3HY19BP2/627 Cum 7.00
### 18-Jul-19 Block-B Columns Aparna RMC M-40 1203005113 Cum 4.00
### 19-Jul-19 Block-B Grade Slab PCC RDC Con RMC M-10 3HY19BP2/633 Cum 7.00
### 19-Jul-19 Block-B Columns$plinth beam RDC Con RMC M-40 3HY19BP2/634 Cum 4.00
### 19-Jul-19 Block-B Grade Slab PCC RDC Con RMC M-10 3HY19BP2/640 Cum 3.50
### 19-Jul-19 Block-B Plinth beam RDC Con RMC M-40 3HY19BP2/642 Cum 4.00
### 19-Jul-19 Block-C Afer 2nd slab columns PRISM RMC M-40 6119998391 Cum 4.00
### 19-Jul-19 Block-C 2nd slab pour-4 APARNA RMC M-25 1204005330 Cum 6.00
### 19-Jul-19 Block-B Columns PRISM RMC M-40 6119998400 Cum 4.00
### 19-Jul-19 Block-C 2nd slab pour-4 APARNA RMC M-40 6119998400 Cum 6.00
### 19-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-40 3HY19BP1/2632 Cum 4.00
### 19-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-40 3HY19BP1/2633 Cum 4.00
### 19-Jul-19 Block-C 2nd slab pour-4 APARNA RMC M-40 1204005336 Cum 4.00
### 19-Jul-19 Block-C 2nd slab pour-4 APARNA RMC M-25 1204005339 Cum 6.00
### 19-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-25 3HY19BP1/2635 Cum 7.00
### 19-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-25 3HY19BP1/2639 Cum 7.00
### 19-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-25 3HY19BP1/2638 Cum 7.00
### 20-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-40 3HY19BP2/647 Cum 4.00
### 20-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-40 3HY19BP2/649 Cum 3.00
### 20-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-25 3HY19BP2/651 Cum 7.00
### 20-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-25 3HY19BP2/652 Cum 6.00
### 20-Jul-19 Block-A Lif Wall RDC Con RMC M-40 3HY19BP2/654 Cum 3.00
### 20-Jul-19 Block-A Lif Wall RDC Con RMC M-25 3HY19BP2/656 Cum 7.00
### 20-Jul-19 Block-B Pcc for plinth beam PRISM RMC M-10 6119998424 Cum 3.00
### 20-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-25 3HY19BP2/658 Cum 7.00
### 20-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-40 3HY19BP2/660 Cum 6.00
### 20-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-25 3HY19BP2/662 Cum 7.00
### 20-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-25 3HY19BP2/666 Cum 6.00
### 20-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-25 3HY19BP2/669 Cum 6.00
### 21-Jul-19 Block-A 2nd slab pour-5 PRISM RMC M-40 6119998437 Cum 4.00
### 20-Jul-19 Block-A 2nd slab pour-5 RDC Con RMC M-25 3HY19BP2/671 Cum 4.00
### 20-Jul-19 Block-A 2nd slab pour-5 PRISM RMC M-40 6119998430 Cum 4.00
### 21-Jul-19 Block-A$B GF Columns$plinth beam RDC Con RMC M-40 3HY19BP2/676 Cum 4.00
### 21-Jul-19 Block-B Columns PRISM RMC M-40 6119998452 Cum 4.00
### 21-Jul-19 Block-B Columns PRISM RMC M-40 6119998462 Cum 4.00
### 21-Jul-19 Block-B Columns PRISM RMC M-40 6119998466 Cum 4.00
### 21-Jul-19 Block-B Retaining wall north side RDC Con RMC M-40 3HY19BP2/697 Cum 7.00
### 21-Jul-19 Block-B Retaining wall north side RDC Con RMC M-40 3HY19BP2/701 Cum 7.00
### 21-Jul-19 Block-B Retaining wall north side RDC Con RMC M-40 3HY19BP2/700 Cum 7.00
### 21-Jul-19 Block-B Retaining wall north side RDC Con RMC M-40 3HY19BP1/2656 Cum 1.00
### 22-Jul-19 Block-C Columns in flat7@GF PRISM RMC M-40 6119998490 Cum 4.00
### 22-Jul-19 Block-C Columns in flat7@GF APARNA RMC M-40 1204005458 Cum 4.00
### 22-Jul-19 Block-A Columns in flat7@GF ACC Con RMC M-40 NS3R36190100267Cum 3.00
### 22-Jul-19 Block-C Staircase 1 GF PRISM RMC M-40 6119998501 Cum 4.00
### 22-Jul-19 Block-C 2nd slab pour-5 APARNA RMC M-25 1203005270 Cum 6.00
### 22-Jul-19 Block-C 2nd slab pour-5 APARNA RMC M-40 1203005269 Cum 6.00
### 22-Jul-19 Block-A Columns in flat7@GF ACC Con RMC M-40 NS3R36190100267Cum 3.50
### 22-Jul-19 Block-C 2nd slab pour-5 APARNA RMC M-25 1203005271 Cum 6.00
### 22-Jul-19 Block-C 2nd slab pour-5 APARNA RMC M-25 1203005277 Cum 6.00
### 22-Jul-19 Block-C 2nd slab pour-5 APARNA RMC M-40 1203005273 Cum 4.00
### 22-Jul-19 Block-C 2nd slab pour-5 APARNA RMC M-25 1203005276 Cum 6.00
### 22-Jul-19 Block-C 2nd slab pour-5 APARNA RMC M-25 1203005278 Cum 6.00
### 22-Jul-19 Block-C 2nd slab pour-5 APARNA RMC M-25 1203005279 Cum 3.50
### 23-Jul-19 Block-B Columns Concrete PRISM RMC M-40 6119998524 Cum 3.00
### 23-Jul-19 Block-B Columns Concrete PRISM RMC M-40 6119998529 Cum 4.00
### 23-Jul-19 Block-A Columns in flat5@GF PRISM RMC M-40 6119998542 Cum 3.00
### 23-Jul-19 Block-A Columns in flat5@GF PRISM RMC M-40 6119998547 Cum 3.50
### 23-Jul-19 Block-B Plinth beam PRISM RMC M-40 6119998553 Cum 3.00
### 23-Jul-19 Block-B Plinth beam PRISM RMC M-40 6119998555 Cum 3.50
### 24-Jul-19 Block-C Columns in flat8@GF PRISM RMC M-40 6119998563 Cum 4.00
### 24-Jul-19 Block-C Columns flat8@GF ACC Con RMC M-40 NS3R36190100273Cum 2.50
### 24-Jul-19 Block-A Staircase Columns@ GF ACC Con RMC M-40 NS3R36190100273Cum 1.50
### 24-Jul-19 Block-B Columns Concrete PRISM RMC M-40 6119998589 Cum 3.00
### 24-Jul-19 Block-B Columns Concrete PRISM RMC M-40 6119998593 Cum 3.00
### 25-Jul-19 Block-A Columns flat4@GF RDC Con RMC M-40 3HY19BP1/2771 Cum 3.00
### 25-Jul-19 Block-A Columns flat4@GF PRISM RMC M-40 6119998622 Cum 4.00
### 26-Jul-19 Block-C Columns flat1@GF ACC Con RMC M-40 NS3R36190100281Cum 4.00
### 26-Jul-19 Block-B Columns Concrete RDC Con RMC M-40 3HY19BP1/2809 Cum 2.00
### 26-Jul-19 Block-A Columns Concrete RDC Con RMC M-40 3HY19BP1/2809 Cum 1.00
### 26-Jul-19 Block-C Columns flat1@GF ACC Con RMC M-40 NS3R36190100281Cum 3.00
### 26-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005468 Cum 6.00
### 26-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005469 Cum 6.00
### 26-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005470 Cum 6.00
### 26-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005471 Cum 6.00
### 26-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005472 Cum 6.00
### 26-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005473 Cum 5.00
### 26-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005476 Cum 6.00
### 26-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005477 Cum 6.00
### 26-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005478 Cum 6.00
### 26-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1204005769 Cum 6.00
### 26-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1204005770 Cum 7.00
### 27-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005489 Cum 6.00
### 27-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005496 Cum 5.00
### 27-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1204005771 Cum 6.00
### 27-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1204005772 Cum 7.00
### 27-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005500 Cum 5.00
### 27-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005504 Cum 6.00
### 27-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005507 Cum 5.00
### 27-Jul-19 Block-B Grade Slab PCC Aparna RMC M-10 1203005510 Cum 3.00
### 27-Jul-19 Block-B Retaining wall BI TO BM RDC Con RMC M-25 3HY19BP1/2855 Cum 3.00
### 27-Jul-19 Block-B Retaining wall north side PRISM RMC M-40 6119998675 Cum 6.00
### 27-Jul-19 Block-B Retaining wall north side PRISM RMC M-40 6119998683 Cum 6.00
### 27-Jul-19 Block-B Retaining wall north side PRISM RMC M-40 6119998685 Cum 4.00
### 27-Jul-19 Block-A Columns flat3@GF PRISM RMC M-40 6119998690 Cum 4.00
### 27-Jul-19 Block-C 2nd slab pour-6 PRISM RMC M-40 6119998694 Cum 6.00
### 27-Jul-19 Block-C 2nd slab pour-6 PRISM RMC M-25 6119998699 Cum 6.00
### 27-Jul-19 Block-C 2nd slab pour-6 PRISM RMC M-25 6119998702 Cum 7.00
### 27-Jul-19 Block-A Columns flat3@GF RDC Con RMC M-40 3HY19BP1/2871 Cum 3.00
### 27-Jul-19 Block-C 2nd slab pour-6 PRISM RMC M-25 6119998708 Cum 5.00
### 27-Jul-19 Block-C 2nd slab pour-6 PRISM RMC M-25 6119998710 Cum 2.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998721 Cum 6.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998722 Cum 6.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998723 Cum 7.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998724 Cum 7.00
### 27-Jul-19 Block-A Podium columns@GF PRISM RMC M-40 6119998715 Cum 4.00
### 27-Jul-19 Block-B Columns Concrete PRISM RMC M-40 6119998715 Cum 2.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998727 Cum 7.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998729 Cum 7.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998730 Cum 6.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998731 Cum 6.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998732 Cum 7.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-40 6119998728 Cum 5.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998733 Cum 7.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998734 Cum 7.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998735 Cum 4.00
### 28-Jul-19 Block-A 2nd slab pour-6 PRISM RMC M-25 6119998736 Cum 3.00
### 28-Jul-19 Block-C Columns flat5@GF PRISM RMC M-40 6119998737 Cum 4.00
### 28-Jul-19 Block-C Columns flat5@GF PRISM RMC M-40 6119998741 Cum 3.50
### 29-Jul-19 Block-C 2nd slab pour-7 PRISM RMC M-40 6119998750 Cum 4.00
### 29-Jul-19 Block-C 2nd slab pour-7 PRISM RMC M-25 6119998751 Cum 7.00
### 29-Jul-19 Block-C 2nd slab pour-7 PRISM RMC M-25 6119998752 Cum 6.00
### 29-Jul-19 Block-C 2nd slab pour-7 PRISM RMC M-25 6119998755 Cum 7.00
### 29-Jul-19 Block-C 2nd slab pour-7 PRISM RMC M-40 6119998757 Cum 6.00
### 29-Jul-19 Block-C 2nd slab pour-7 PRISM RMC M-25 6119998759 Cum 7.00
### 29-Jul-19 Block-C 2nd slab pour-7 PRISM RMC M-25 6119998763 Cum 7.00
### 29-Jul-19 Block-C 2nd slab pour-7 PRISM RMC M-25 6119998764 Cum 7.00
### 29-Jul-19 Block-B Columns Concrete PRISM RMC M-40 6119998765 Cum 1.50
### 29-Jul-19 Block-A Columns Concrete PRISM RMC M-40 6119998765 Cum 1.50
### 29-Jul-19 Block-C 2nd slab pour-7 PRISM RMC M-25 6119998767 Cum 7.00
### 29-Jul-19 Block-C 2nd slab pour-7 PRISM RMC M-25 6119998768 Cum 5.00
### 29-Jul-19 Block-B Podium columns ACC Con RMC M-40 NS3R36190100296Cum 3.00
### 30-Jul-19 Block-C Columns flat4@GF PRISM RMC M-40 6119998789 Cum 5.00
### 30-Jul-19 Block-A 2nd slab pour-7 PRISM RMC M-40 6119998798 Cum 7.00
### 30-Jul-19 Block-A Columns$staircase-1 PRISM RMC M-40 6119998800 Cum 4.00
### 30-Jul-19 Block-A 2nd slab pour-7 PRISM RMC M-25 6119998801 Cum 7.00
### 30-Jul-19 Block-A 2nd slab pour-7 PRISM RMC M-25 6119998802 Cum 6.00
### 30-Jul-19 Block-A 2nd slab pour-7 PRISM RMC M-25 6119998803 Cum 6.00
### 30-Jul-19 Block-B Lif wall$staircase-1 ACC Con RMC M-40 NS3R36190100300Cum 4.00
### 30-Jul-19 Block-A 2nd slab pour-7 PRISM RMC M-25 6119998804 Cum 7.00
### 30-Jul-19 Block-A 2nd slab pour-7 PRISM RMC M-40 6119998805 Cum 6.00
### 30-Jul-19 Block-B Lif wall ACC Con RMC M-40 NS3R36190100301Cum 4.00
### 30-Jul-19 Block-A 2nd slab pour-7 PRISM RMC M-25 6119998807 Cum 6.00
### 31-Jul-19 Block-A 2nd slab pour-7 PRISM RMC M-25 6119998808 Cum 7.00
### 31-Jul-19 Block-A 2nd slab pour-7 PRISM RMC M-40 6119998809 Cum 6.00
### 31-Jul-19 Block-A 2nd slab pour-7 PRISM RMC M-25 6119998812 Cum 7.00
### 31-Jul-19 Block-B Lif wall$columns ACC Con RMC M-40 NS3R36190100302Cum 3.00
### 31-Jul-19 Block-A 2nd slab pour-7 PRISM RMC M-25 6119998814 Cum 2.00
### 31-Jul-19 Block-C Lif wall@GF RDC Con RMC M-40 3HY19BP1/3044 Cum 5.00
### 31-Jul-19 Block-B Grade Slab PCC Pq-Pk ACC Con RMC M-10 NS3R36190100305Cum 7.00
### 31-Jul-19 Block-C Lif wall@GF PRISM RMC M-40 6119998845 Cum 5.00
### 1-Aug-19 Block-B Columns Concrete PRISM RMC M-40 6119998862 Cum 3.00
### 1-Aug-19 Block-A Lif wall@GF ACC Con RMC M-40 NS3R36190100309Cum 3.00
### 1-Aug-19 Block-A Lif wall@GF ACC Con RMC M-40 NS3R36190100309Cum 3.00
### 1-Aug-19 Block-A Lif wall@GF ACC Con RMC M-40 NS3R36190100309Cum 3.50
### 3-Aug-19 Block-B R/W B6-B12 23RMT 2nd lif PRISM RMC M-40 6119998905 Cum 3.50
### 3-Aug-19 Block-B R/W B6-B12 23RMT 2nd lif PRISM RMC M-40 6119998906 Cum 3.50
### 3-Aug-19 Block-B R/W B6-B12 23RMT 2nd lif PRISM RMC M-40 6119998907 Cum 3.00
### 5-Aug-19 Block-B R/W West side Bn-Bh/X98-X980 Aparna RMC M-40 1204006098 Cum 3.00
### 5-Aug-19 Block-B R/W West side Bn-Bh/X98-X980 Aparna RMC M-40 1204006105 Cum 3.50
### 5-Aug-19 Block-C Columns flat3@GF,Staircase2 columns PRISM RMC M-40 6119998944 Cum 3.50
### 5-Aug-19 Block-C Columns flat3@GF,Staircase2 columns PRISM RMC M-40 6119998945 Cum 3.50
### 5-Aug-19 Block-A Staircase 1 GF Aparna RMC M-40 1204006107 Cum 3.00
### 6-Aug-19 Block-C Columns flat2@GF PRISM RMC M-40 6119998968 Cum 4.00
### 6-Aug-19 Block-A Columns flat8@GF PRISM RMC M-40 6119998976 Cum 4.00
### 6-Aug-19 Block-A Columns flat8@GF PRISM RMC M-40 6119998977 Cum 2.00
### 6-Aug-19 Block-A Columns Concrete PRISM RMC M-40 6119998977 Cum 1.00

TOTAL QUANTITY Cum 1366.50 2124.40 1789.50 32.00 1674.00


6986.40 M10 221 169.12 51.88
M20 660 637.55 22.45
M25 228 220 8
M40 51.5 56.314 -4.814

-48.6
PROJECT : 7 ACRES
Client : Frontline Builders
STEEL INWARD REGISTER
Sl.no Date Invoice NumbeMake of steel Units

1 12-Dec-18 75 AF Star Fe550 Kgs


2 6-Feb-19 288 AF Star Fe550 Kgs
3 4-Feb-19 099 AF Star Fe550 Kgs
4 25-Feb-19 SIT-5700 JSW NEO Steel Kgs
5 16-Mar-19 132 AF Star Fe550 Kgs
6 23-Mar-19 137 AF Star Fe550 Kgs
7 23-Mar-19 343 AF Star Fe550 Kgs
8 26-Mar-19 SIT-6433 JSW NEO Steel Kgs
9 7-May-19 SIT-684-19-20 JSW NEO Steel Kgs
10 8-May-19 SIT-705-19-20 JSW NEO Steel Kgs
11 21-May-19 10 AF Star Fe550 Kgs
12 21-May-19 11 AF Star Fe550 Kgs
13 5-Jun-19 SIT-1271-1920 JSW NEO Steel Kgs
14 6-Jun-19 43 AF Star Fe550 Kgs
15 6-Jun-19 12 AF Star Fe550 Kgs
16 22-Jun-19 58 AF Star Fe550 Kgs
17 24-Jun-19 SIT-1679-1920 JSW NEO Steel Kgs
18 2-Jul-19 63 AF Star Fe550 Kgs
19 4-Jul-19 SIT-1938-1920 JSW NEO Steel Kgs
20 4-Jul-19 SIT-1939-1920 JSW NEO Steel Kgs
21 4-Jul-19 68 AF Star Fe550 Kgs
22 7-Jul-19 19 AF Star Fe550 Kgs
22 7-Jul-19 AF Star Fe550 Kgs
23 31-Jul-19 30 AF Star Fe550 Kgs

Total Quantity Received in Kgs


Total Quantity Received in MT
Tot. Quantity Receiv Dia Wise Steel in Kg's
8MM 10MM 12MM 16MM 20MM 25MM
37930.00 10010 9820 3050 4820 5170 5060
39970.00 0 0 0 12600 17090 10280
40280.00 13980 10750 14030 1520 0 0
31220.00 0 0 0 3880 19480 7860
37660.00 5630 14020 18010 0 0 0
30040.00 11290 18750
30030.00 1730 14010 5260 9030
45160.00 7490 23440 14230
30820.00 23100 7720
33700.00 11910 3880 17910
32190.00 8050 3100 7450 5300 8290
24950.00 24950
31310.00 3950 19410 7950
30100.00 24040 6060
29060.00 8000 4990 6020 10050
8040.00 8040
35110.00 7770 27340
35210.00 13210 9910 1010 2980 0 3000
31981.00 4141 19330 8510
11260.00 11260
36210.00 18250 4830 13130
40740.00 27720 13020
11210.00 7060 4150
44270.00 40270 4000

758451.00 145110 130590 76240 95451 190870 115090


758.45 145.11 130.59 76.24 95.45 190.87 115.09
Remarks
32MM
0
0 Way bill Nett & received qty difference is 290kgs
0
0
0

1541000
32050
1448566
1155177
1565500
1385745

1702835
5100 1499088
1490588
524829
1511314

5100
5.10
PROJECT : 7 ACRES
Client : Frontline Builders
CEMENT INWARD REGISTER
Sl.no Date Invoice NumbeCement Make Units

1 22-Dec-18 2655 Chettinad Cement PP Bags


2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Total Quantity Received Qty


Tot. Quantity ReceivRemarks

200.00

200.00
581 0.2 0.2 0.3
PROJECT : 7 ACRES
Client : Frontline Builders
SAND INWARD REGISTER
Sl.no Date Invoice NumbeSand Type Sand Dealer

1 14-Dec-18 6100508588 Robo Sand Prism Johnson


2 23-Dec-18 049 River Sand Veera Brahamam
3 26-Dec-18 6100508935 Robo Sand Prism Johnson
4 16-Apr-19 6100511431 Robo Sand Prism Johnson
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Total Quantity Received Qty


Units Tot. Quantity ReceivRemarks

MT 24.78
MT 26.65
MT 25.98 3060
MT 27.84 2100
3520
4500
2240

105.25
PROJECT : 7 ACRES
Client : Frontline Builders
METAL INWARD REGISTER
Sl.no Date Invoice NumbeMetal Dealer Size of MetaUnits

1 14-Dec-18 6100508587 Prism Johnson 20mm MT


2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Total Quantity Received Qty


Tot. Quantity ReceivRemarks

26.17

26.17
Cost
14/05/2019 LDPE Polythin Sheet kgs 987 63148.8 74515.58
Feather Bond Nos 2 5100 6018
PROJECT : 7 ACRES
Client : Frontline Builders
METAL INWARD REGISTER
Sl.no Date Invoice Numbe Dealer Size of BlocUnits

1 3-Jul-19 141 Sri Vigneshwar Bricks200x200x300Nos


2 10-Jul-19 114 Sri Vigneshwar Bricks200x200x300Nos
3 10-Jul-19 114 Sri Vigneshwar Bricks100x200x400Nos
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Total Quantity Received Qty


Tot. Quantity ReceivRemarks

591.00
600.00
50.00

1241.00