Project : VISUAL INSPECTION RECORD ( FORM QA-03 ) Report No. :
Remark : Visual Inspection ; As per Structural Welding Code AWS D1.1 : 2010 Table 6.1 Visual inspection acceptance criteria, Figure 5.4 Acceptable and unacceptable weld profiles.
Date :
McDONALD STEEL BUILDING PRODUCTS LTD
Shanta Western Tower, (Level- 11) 186, BirUttam Mir Shawkat Ali Sarak, Tejgaon IA, Dhaka-1208, Bangladesh
E-mail: mcdnld@mcdonaldbd.com
Project : FIT-UP INSPECTION RECORD ( FORM QA-02 ) Report No. :
Structure : Page of
Dimension
Result
Point Measured A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Deviation
Rej.
Tolerance
Name :
Date :
McDONALD STEEL BUILDING PRODUCTS LTD
Shanta Western Tower, (Level- 11) 186, BirUttam Mir Shawkat Ali Sarak, Tejgaon IA, Dhaka-1208, Bangladesh
E-mail: mcdnld@mcdonaldbd.com
Project : DIMENSION INSPECTION RECORD ( FORM QA-04 ) Report No. :
Structure : Page of
Dimension
Result
Point Measured A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Deviation
Rej.
Tolerance
Name :
Date :
McDONALD STEEL BUILDING PRODUCTS LTD
Shanta Western Tower, (Level- 11) 186, BirUttam Mir Shawkat Ali Sarak, Tejgaon IA, Dhaka-1208, Bangladesh
E-mail: mcdnld@mcdonaldbd.com
QUALITY CONTROL
CLIENT :
PIECE MARK :
SPECIFIED
TOTAL Microns
MEASURED POINT
OF COAT 1 2 3 4 5 6 7 8 DFT.
Date Applied b
Date Tested d
/ / % R.H.
Date Applied b
Date Tested d
/ /
Date Applied b
Date Tested d
/ /
DATE:
TD
adesh
ESS (MIN.)
Microns
Microns
Microns
Microns
AVERAGE
DFT.
MICRON
MICRON
MICRON
McDONALD STEEL BUILDING PRODUCTS LTD
Shanta Western Tower, (Level- 11) 186, BirUttam Mir Shawkat Ali Sarak, Tejgaon IA, Dhaka-1208, Bangladesh
E-mail: mcdnld@mcdonaldbd.com
( FORM QA - 005 )
CLIENT :
MATERIAL : THICKNESS :
ABBREVIATIONS ….. IL : Indication Level RL : Reference Level AF : Attenuation Factor IR : Indication Rating
NAME :
DATE :
CTS LTD
Dhaka-1208, Bangladesh
Page No.
DATE OF TEST :
OTHER
JUDGEMET REMARK
IR : Indication Rating
APPROVED BY :
McDONALD STEEL BUILDING PRODUCT
Shanta Western Tower, (Level- 11) 186, BirUttam Mir Shawkat Ali Sarak, Tejgaon IA, Dhaka
E-mail: mcdnld@mcdonaldbd.com
QUALITY CONTROL
CLIENT :
PROJECT :
AFTER HYDROTEST
PENETRANT :
REMOVER :
DEVELOPER :
INSPECTED BY : QC ENGINEER
SIGNED :
NAME :
DATE :
ILDING PRODUCTS LTD
Shawkat Ali Sarak, Tejgaon IA, Dhaka-1208, Bangladesh
@mcdonaldbd.com
OL
G REPORT
6)
DATE OF TEST :
AFTER PWHT
OTHER
BRUSHING OTHER
TIME : OTHER :
INE/SPOOL NO.
ACCEPTANCE CRITERIA :
JUDGEMENT REMARK
REJECT
PENDING ( SEE RELATED REPORT )
CLIENT :
WITNESS REVIEWED
McDONALD STEEL BUILDING PRODUCTS LTD
Shanta Western Tower, (Level- 11) 186, BirUttam Mir Shawkat Ali Sarak, Tejgaon IA, Dhaka-1208, Bang
E-mail: mcdnld@mcdonaldbd.com
QUALITY CONTROL
( FORM QA - 007 )
RECORD NO.
CLIENT :
TYPE OF DEFECTS
WELD NO. FILM NO. CLASS
NO. SIZE OF DEFECT
ABBREVIATIONS B : SLAG INCLUSIONS INSPECTED BY :
l: mcdnld@mcdonaldbd.com
QUALITY CONTROL
( FORM QA - 007 )
PAGE :
DATE OF TEST :
TYPE OF PENETRAMETER
AUTO -
MANUAL /
C/S
MM
ACCEPT REJECT
GRAND
McDONALD STEEL BUILDING PRODUCTS LTD
Shanta Western Tower, (Level- 11) 186, BirUttam Mir Shawkat Ali Sarak, Tejgaon IA, Dhaka-1208, Banglade
E-mail: mcdnld@mcdonaldbd.com
FINAL INSPECTION RECORD ( FORM QA-09 , )
Report No. :
Project :
Page of
Structure :
1 Appearance of product.
Date :
UCTS LTD
A, Dhaka-1208, Bangladesh
Inspected
By Date
Verify by
McDONALD STEEL BUILDING PRODUCTS LTD
Shanta Western Tower, (Level- 11) 186, BirUttam Mir Shawkat Ali Sarak, Tejgaon IA, Dhaka-1208, Bangladesh
E-mail: mcdnld@mcdonaldbd.com
PRE - SHIPMENT INSPECTION RECORD
( FORM QA-11)
CLIENT
PROJECT NAME
NAME OF COMPONENT
INSPECTION ITEMS
E-mail: mcdnld@mcdonaldbd.com
QUALITY CONTROL
( FORM QA - 10 )
CUSTOMER :
PROJECT NAME :
NAME OF COMPONENT :
INSPECTION ITEMS :
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -