On rainy days, water will penetrate Talk with the Contractor; Tap
School Building / 95% Completed, with electrical installation inside the classroom since the Municipal LGU Official for
MLGU
Classrooms and ventilation plastering of the outside walls are no yet assistance by submtting a Letter -
finished, Cracks are evident on the wall Request
Proper scheduling to
SHS Immersion accommodate Immersion Program
Needs to be finalized Time Schedule, Distance, Risk PTA, MLGU
Program and encourage students to be
ensured
Prepared by:
Attested by:
2-CL/1 STOREY Engr. Ronnie Mahinay August 14, 2015 November 15, 2015 95% COMPLETED
Prepared by:
Attested by:
CLEOFE M. VILLANUEVA
SHS School Coordinator MICHAEL ANGELO S. MAGALSO
School Head/TIC