Root Cause Analysis Report

Project Title: -- JLN Metro stn Pink Line Date: 02/08/2019

Event Description
RO Membranes are not working

Timeline leading up to the Event


Sequence of Events:- Stn. JE report to Voltas staff, Voltas Engineer and RO technition Mr.Arvind yadav
check the plant

Investigative Team Procedure


Mr.Shailendra Singh( Site Eng.), checked after open the plant
Mr. Arvind Yadav checked after open the plant

Findings
2 membranes found damage in upper pressure tube
5 membranes of lower tube are not working ( >4 year old)

Identification of Root Cause


Membranes are not working due to over life >2.5 -3 years nad other 2 are broken due to pressure
hold at the time of operation of RO plant

Corrective Action
Descaling of lower tube is done
Descaling of other membranes are done and finaly there is no success

Sponsor Acceptance
Signature Sponsor Name & Title :- Date:-
Mr. Prem kumar( J.E.), 02/08/2019
JLN Metro station