The purpose of completing this investigation is to identify all of the essential and contributing factors so
that action can be taken to prevent them.
Date 25-06-2022
Complaint No. 01
HMEL Mail :
Dear team,
Attached email for reference. Kindly prepare a report & discuss with me.
Regards,
Regards,
Peeyush Singh
TYPE OF COMPLAINT:
Wrong loading
Wet material
Less Loading
Excess Loading
Contamination/Foreign Material
Under Weight
Overweight
Poor Sealing
Dust/Dirt on Bags
Any, other (Mention) _______ __
DETAILS OF INVESTIGATION
(Includes all investigation details)
TYPE OF
DETAILS OF INVESTIGATION
INVESTIGATION
INVESTIGATION
DETAILS 1. Lot no. 2P22K0138 Grade:M12RR1 bagged in bagging line PP01. & PP3
points by
Improper Sealing Temperature REPONO We check the sealing
sealing and Miss-alignment temperature and alignment of
of welding bar. welding bar welding bar
alignment found ok.
Not - Heating Element We remove the heating element
Working of REPONO from the device and check the
sealing dark burning spots are found on
element or the sealing element.
coil Burning spot are remove with
the fine emery paper then take
trial by sealing the empty bags
sealing quality was good.
Improper Corner sealing device Repono As we have investigated the top
corner alignment and and bottom sealing device, we
sealing heating elements. have checked the corner sealing
device also by remove the
heating elements in all PP
bagging lines.
Burning spots are found on
element we have clean the
elements and re-insert the and
take the trial for the same in
bagging line PP01 and PP02.
We have found the faulty corner
sealing element which was seal
the half corner only, we have
replaced the sealing element
and take the trial which working
well.