Defect : FITMENT PROBLEM ANALYSIS RESULT : Where Vendor Sub-Vendor Vendor Name : AFFY INDIA PVT LTD
Reported By : MR. PURSHOTTAM Nos Reported : DGM (SQIG)
Repeat (In 1yr) 1'st Time Sub-Vendor :
Date of Occurance : 13.01.2019 Model :
Part Name : BLUE NUT Part No : 83119M75JOO Root Cause FITMENT PROBLEM Prepared By Verified By Approved By
Batch Code :
(4M) SHSHANK ABHISHEK AKSHAY
PROD MGR ASST. MGR QA MGR
2 IMMEDIATE ACTION 6
Id Mark on
As per Investigation, we found that due to tool life PROCESS FLOW : NG Process Sketch / Photo
Parts Checked at Date OK NG Batch Code Remarks compeletion, part got struck in mould and double shot
ok part Reciept of raw material Final Inspection
occurred. Due to which slider pin broked.One NG part got
On Line skipped & mixed with OK parts during retroactive
inspection.
Trim India Store Storage Packing
Parts in SPD
VI Final
Deflashing/
Inspection
Cutting
FVPA
7 Suspected Quantity (Indicate OK for 3 days before and after the Defective Batch Code)
Actual Defect Sketch/Photo
3 Sl No Part No / Date Remarks
Batch code
Qty Produced
Dispatch/Receipt from
Sub-vendor
In-house processing/
Final inspection qty.
13 VERIFICATION / CHECK POINTS (Implementation of Countermeasures in Process & Documentation
8 STUDY OF CAUSE & SIMULATION TEST 10 COUNTERMEASURES
with Date)
Sl No Process Test Result DECESION Sl No Countermeasure Date Sl No Checkpoints / Standardization at Vendor End Date Remarks
Machine parameter is verified from the 1st part TRAINING PROVIDED TO OPERATOR AND
2 Machine Parameter OK 2 14.01.2019
approval sheet & found ok as per control plan INSSPECTOR FOR RETROACTIVE INSPECTIO
1st part approval was made but dispose of QUALITY ALERT PROVIDED TO VISUAL
3 1st Part & Last Part approval OK 3 14.01.2019
rejected qty ( Power failure & other Interval ) INSPECTION AND ON MACHINE
11 Horizontal Deployment
9 5 WHY ANALYSIS 14
Step 1 2 3 4 5 Sl No CHECK POINTS & STANDARDIZATION Date Remarks
Tool life over due to which
Mould running in auto
part got strucked in mould
Slider pin broken during condition, shot got struck in
Occurrence Fitment problem at customer end. Fitment hole is blocked and double shot occurred
production. mould and double shot
leading to breakage of
occurred.
slider pin.
PDI QC PERSON VERIFIED
MATERIAL CHECKED DURING RETROACTIVE THE LOT AS PER SAMPLING
NG PARTS GOT SKIPPED & MIXED WITH OK PARTS
Flow INSPECTION UNDER 4M CHANGE. 11 NG PARTS
DURING RETROACTIVE INSPECTION
BASIS LEADING TO THE
FOUND AS PER RECORD. PROBLEM THAT PART GOT
SKIPPED FROM PDI STAGE