You are on page 1of 2

Work-Processing Sheet for the Workshop

Work-Processing Sheet : Prepared by:


Date: 2017 - 05 - 04
Art. No. Article Drawing:
A0001 individual part 1 A0001

Hz. No. Original part


Rd. ISO 10060-26 x 215 – S235JR
Process Cost group Description Aids/ Set- Time
Step NC-Prg. up per
no. Measuring time unit
Instruments Min
Tools
10 Preparation Reading Drawing, Clarifying
Problem
20 Checking available
machine, tool and
measuring instruments
30 Checking Measures of Raw Vernier
part 210 mm caliper 0.05
mm
40 Turning Place workpiece on chuck Chuck key
mechine no
50 Cutting the surface of the Right flat
workpiece tool
60 Drill workpiece using drill Drill center
center
70 Install workpiece using center of tail
center of tail stock stock
80 Cutting workpiece until Right flat
diameter 22.5 mm , long to tool
93.5 mm
90 Cutting until diameter Finishing
diameter 22mm, long to tool
93.5 mm with finishing tool
100