AREA STATEMENT - INTERNAL PAINTING A1 TOWER S.N. ITEM NO. L B H AREA UNIT 1 Finishing wall with Acrylic Smooth Paint AT FIRST FLOOR CORRIDOR AREA STAIR SIDE WALL - (Y-13-Y-24)/X-12 1 12.88 2.850 36.71 DEDUCTION D3 2 1.20 2.100 -5.04 STAIR CASE ENTRY /EXIT OPENING 1 1.500 2.100 -3.15 RAILING 1 2.820 2.100 -5.92 SIDE WALL FLAT ENTRY 2 0.490 2.850 2.79
LIFT SIDE WALL - (Y-13-Y-24)/X-15 1 12.88 2.875 37.03
DEDUCTION FIRE DUCT 2 0.75 1.750 2.100 -5.51 IV DUCT 2 0.750 1.170 -1.76 CEILING COORIDOR AREA 1 12.880 3.650 47.01 CEILING NEAR FLAT ENTRY AREA 1 1.630 0.490 0.80 CEILING NEAR FLAT ENTRY AREA 1 2.435 0.490 1.19 STAIR CASE FRONT INTERNAL WALL 1 17.860 2.850 50.90 CEILING LANDING 2 3.230 1.500 9.69 CEILING WAIST SLAB 2 3.020 1.500 9.06 DEDUCTION STAIR CASE ENTRY /EXIT OPENING 1 1.500 2.100 -3.15 RAILING 1 1.500 2.850 -4.28 STAIR CASE LIFT SIDE INTERNAL WALL 1 15.700 2.850 44.75 CEILING LANDING 2 2.650 1.250 6.63 CEILING WAIST SLAB 2 2.500 1.250 6.25 DEDUCTION STAIR CASE ENTRY /EXIT OPENING 1 1.500 2.100 -3.15 RAILING 1 2.650 2.100 -5.57 Total 165.19 SQM G.Total 165.19 SQM DETAIL OF MEASUREMENT(B1 TOWER ) EVEREST ENCLAVE,SEC-18 ,GROUP HOUSING VRINDAVAN SCHEME,LUCKNOW
Vascon Engineers Ltd
AREA STATEMENT - INTERNAL PAINTING B1 TOWER S.N. ITEM NO. L B H AREA UNIT 1 Finishing wall with Acrylic Smooth Paint AT FIRST FLOOR CORRIDOR AREA STAIR SIDE WALL - (C-9-Y-20)/A-13 1 12.87 2.850 36.68 DEDUCTION D3 2 1.20 2.100 -5.04 STAIR CASE ENTRY /EXIT OPENING 1 1.500 2.100 -3.15 RAILING 1 2.820 2.100 -5.92 SIDE WALL FLAT ENTRY 2 0.490 2.850 2.79
LIFT SIDE WALL - (C-9-Y-20)/A-11 1 12.87 2.875 37.00