Tech Talk

Garment industry over the years has adopted various key performance measures from
different industries and invented some of their own. In the third part of the article series,
Mausmi Ambastha, a budding entrepreneur providing IT solutions for the apparel industry,
Director and Founder of intelloCut, with years of experience as a consultant and a former
faculty at NIFT, discusses a collection of performance metrics being used in the industry,
for enhancing both the operational and financial performance of a business. Some of
these measures may not be part of scientific analysis or give a holistic picture but they do
serve the purpose for which they have been designed and are being successfully used.

Performance Measurement Tools – 3


Cutting and Production Planning
In the third part of the article series on Simple Performance Measurement Tools, the author discusses performance measures
from cutting, planning and human resource related areas.Cutting is considered to be the most important operation in apparel
manufacturing because firstly, it handles the costliest material resource – the fabric. Secondly, the spreading and cutting process
is irreversible; the concept of repair or alteration does not work here. Further, and most importantly, due to over-emphasis
on measuring sewing department performance, there is a sheer neglect of measuring the spreading, cutting and planning
performance. This results in building up inefficiencies, leading to erosion of cost advantages.

Cutting used in textile industry. As per the marker to total available fabric.
PhD thesis, “A Study of Productivity Marker efficiency is calculated for
The performance metrics in this
and Financial Efficiency of Textile one marker at a time and cannot
department are mostly focussed on
Industry of India”, submitted by be generalised for the entire order.
fabric, the most expensive resource.
Zala, Virambhai S to the Saurashtra This metric is mostly automatically
Material Productivity: This is an University in 2010, the average calculated by CAD machines.
indicator of the output or value material productivity of Textile
generated per unit of material used. Industry is 4.07. This study was done Area of marker
Marker used for garments
on financial data of seven prominent =
efficiency Total area of marker
Output (value or unit
Material or value added) textile companies of India.
productivity = Value of raw Area of marker used for garment:
material used Example: Factory XYZ bought 4200
metres of fabric at the cost of Rs. 46 The CAD system calculates the area
This is a fundamental re-examination per metre for order A1. They produced of all the patterns placed on the
of how, when and why materials 2000 garments and sold them at the marker.
are used. This measure shows cost of Rs. 300 each. Total area of marker: This is simple
how effectively material is used
Therefore, Material Productivity is multiplication of length X width.
through the system. Any material
(2000X300) / (4200X46) = 3.10. Marker efficiency above 80% to 85%
left in the fabric store is also a
waste as it will be disposed of at Therefore, order A1 generated Rs.3.1 is considered good. However, this
a much cheaper rate.This is not a for every Rs.1 of material used. value can vary depending on the
very common metric in garment Marker Efficiency: This is the pattern shapes (say bias skirts) and
industry but has been extensively ratio of fabric actually used on the restrictions on pattern placements

384UJUDIWorld l SEPTEMBER 2012


CMYK

Tech Talk

“Both the aspects of cutting and spreading handle the most


costly raw material – the fabric, and their operations are also
irreversible in nature. Still due to overemphasis on the sewing
floor, there is sheer neglect in measuring various critical
aspects of both the spreading and cutting departments. The
measures discussed would surely serve as a stepping stone
for an apparel manufacturer.” – Mausmi Ambastha

(say for stripes and plaids). This is Marked fabric consumption = 585/300 Fabric Utilization: This is the
an important indicator to decide on = 1.95 metres. This value does not ratio of fabric used on garments
the quality of marker or whether by include wastages such as end loss or to fabric available to be used. This
changing the position of the patterns end bits. metric tells us the fabric utilization
the CAD operator is improving on the Achieved Consumption: This is the status of the entire order. Fabric
marker or not. actual consumption achieved per generally costs 60% to 70% of the
It is often observed that 80% of garment after the whole production cost of the garment. Strict controls
the garments are cut by 20% of the should ensure that every inch of
process is completed. This requires
markers. Therefore, effort should the fabric is used properly and is
extensive calculation but the result
be expended to improve marker accounted for.
gives a realistic image of loss of
efficiency of these 20% markers material in the system. Fabric Fabric used on garments
utilization = Total fabric available
which can result in significant amount
Total fabric
of savings. Achieved bought for the style Total fabric available = Fabric
consumption = Total garments shipped
One should note that the marker allocated or bought for the order.
efficiency only states the quality The above formula will show final Fabric used on garment = This can be
of marker, there is still room achieved consumption. The losses calculated in following ways.
for material wastage in a lay in on material incurred by the whole
a. By weight
terms of end loss, width loss and factory in terms of dead stock, end
mismanaged end-bits. bits and cutting room losses, part i. Weigh one garment of each
change and rejection in sewing, size ( garment should be
Marked Consumption: Consumption
rejection in finishing as well as weighed before sewing)
of a garment calculated as per
the markers made by the CAD unshipped garments are included in ii. Multiply weight with number
department. In order to calculate this calculation. of garments cut in each size
this metric the following steps have to If user wants to measure only cutting iii. Divide total weight by GSM and
be followed: room achieved consumption then fabric width to get total metres
Ÿ Make a cut order plan stating the formula should be slightly used in garments.
markers and no. of plies for altered. Total fabric issued to cutting b. By Length
each lay. divided by total cut garments issued
i. Multiply Marker length with its
to sewing department will show
Ÿ Make all the markers. Marker efficiency and number
the achieved consumption of
Ÿ Calculate total length of fabric of plies laid in the marker.
cutting room.
being used on the lays. ii. The above calculation is done
Example: For the previous example
Ÿ Divide this value by total for each marker in the order
640 metres of fabric was finally
garments to be produced. and then sum of all gives the
bought(9.4% more than that required)
total metres used in garments.
Example: out of which 630 metres was issued to
cutting department. The cutting room The above will give fabric utilization
Cut Order Plan
records show cutting of 315 garments. for the order. The formula can be
Markers S M extended to calculate overall fabric
The factory finally shipped 290
Lay 1= 100 plies S-1, M-1 100 100 utilization for the factory in a month.
garments. 25 garments were rejected
Lay 2= 50 plies M-2 100 in the process. Example: As per the previous example
100 pcs. of S & 200 pcs. of M
Achieved consumption (factory Total Fabric available = 640 metres
Marker lengths: S-1, M-1 = 3.8 metres, level) = 640/290 = 2.21metres (11.8% The fabric weight is 110 GSM and
M-2= 4.1 metres wasted) the fabric width is 1.07 metres. The
Total fabric needed= 3.8X100 + 4.1 X 50 Achieved consumption (cutting room) markers as mentioned in previous
= 585 metres = 630/315 = 2 metres (2.5% wasted) examples are shown below:

SEPTEMBER 2012 l 4UJUDIWorld 39


CMYK

Tech Talk

Efficiency of a cut order plan is defined by the number of


plies and lays it suggests. An inefficient cut order plan
results in 4-6 cm end loss per ply, lower marker efficiency,
more labour time in cutting, besides substantial amount of
fabric wastage

Markers Marker Marker S M Least Total order quantity should be taken from cutting room
length efficiency possible = Maximum pieces
plies allowed in a marker
daily records.
Lay 1= S-1, M-1 3.8 85% 100 100
100 plies metres Many factories collect this
Lay 2= M-2 4.1 80% 100 Least Total order quantity information as monthly average as
50 plies metres possible = (Maximum pieces in
lays a marker X Maximum well as a percentage for individual
Fabric used in the garment: plies in a lay orders. This gives a general
performance level of the company.
a. By weight It should be noted that it is always
There may be various reasons for
i. Weight of size “S” garment possible to achieve the above least
an ambiguous result and further
=187.1 gms , size “M” garment = possible numbers if the orders are
investigation may be required.
193 gms properly planned. There may be
slight variation of 1% in case of Example: As per previous example,
ii. Total weight of order
multiple colour orders. For some the factory XYZ had an order of 300
= (100 X 187.1) + (200 X 193)
specialized cases like placement pieces. The cutting room records show
= 57310 gms
prints, this formula may not give the cutting of 315 garments but only 290
iii. Total metres used on garments garments were finally shipped.
achievable solution.
= 57310 / (110 X 1.07)
The factory can compare actual with Cut to ship ratio = 290/315 = 92% (8%
= 487 metres
least possible solutions and check garments were lost/rejected in the
b. By Length process)
if their cutting room managers are
i. Marker 1 = 3.8 X 0.85 X 100 following the above systems and Labour Cost per minute: This
= 323 metres, using the available fabric in best is a very important metric while
Marker 2 = 4.1 X 0.80 X 50 possible way. calculating the price of a garment.
= 164 metres It helps to quickly calculate the
ii. 323 + 164 = 487 metres Production Planning labour cost that will be incurred in
It is defined as “The technique production of the given garment.
Both the formulas achieved the same
result. The factory can use either of of foreseeing or picturing ahead Total cost
the methods for calculation. Fabric every step along series of separate Cost per = incurred on labour
minute Total available working
utilization = 487 / 640 = 76.10% . operations; each step to be taken in minutes X No. of labour
the right place, of the right degree and
Cut order plan: A cut order plan is This can be calculated over a month
at the right time, and each operation
effective if it uses least number of or a year to give an accurate value to
to be done at maximum efficiency.”
plies and least number of lays while cost per minute.
– In“Production Management and
cutting an order. An ineffective cut
Productivity” by Dayal. R. et al. To calculate labour cost of a new
order plan can result in following
Cut to Ship Ratio:This shows the order, its standard minute is
losses:
percentage of garments shipped out calculated and then multiplied to
a. Additional 4 cm to 6 cm end loss cost per minute and efficiency to get
on every increased ply of total number of garments cut for
the order. It shows a bird’s eyeview the actual labour cost that will be
b. Smaller markers may have lower incurred during its production.
of the entire system. A number close
marker efficiencies.
to 98% will be considered very well. Example: Factory XYZ has 400
c. Higher number of plies and lays This means only 2% of garments are direct sewing operators and helpers.
result in more labour time in rejected or lost in the system. The cost to company for these 400
laying and cutting operators is Rs. 32,00,000 per month.
Cut to Total pieces shipped
d. Higher number of plies and lays ship ratio = The company works for 8 hours per
Total pieces cut
may result in higher end bits and day for 24 days in a month. Therefore,
fabric wastages. Total pieces shipped: This should be total working minutes per operator
It is possible to calculate least taken from final packing list. = 11,520 minutes per month.
number of possible plies and least Total pieces cut: This should be all Cost per minute = 32,00,000 /
number of possible lays for an order. the garments cut for this order. This ( 11,520 X 400) = Rs. 0.69 per minute

404UJUDIWorld l SEPTEMBER 2012


CMYK

Tech Talk

If the factory makes standard product, capacity can be


expressed in terms of number of pieces. However, if there is
a huge variation in the products produced, then the unit of
measure should ideally be number of minutes produced. This
is summation of each garment produced multiplied by its
standard minute value

Plan Performance Index: This potential output which ‘could’ be of waiting time before or after
shows the percentage of variation produced with it, if capacity was actual manufacturing and
between the planned work and the fully used. throughput time.
actual work done. There has been a huge demand to
Produced garments or
Capacity = Produced minutes reduce lead times for quicker reach
Plan Achieved production utilization X 100
performance = X 100 Capacity in terms
index Planned production of garments or minutes of the product to the market.

This helps in evaluating how efficient Overtime Percentage: The


If the factory makes standard
product, capacity can be percentage of overtime being
is your factory plan in order to meet
expressed in terms of number used over total working time. As
your delivery dates. The ideal value
of pieces. However, if there is a overtime costs considerable amount
is 100% but a 97% hit rate should be
huge variation in the products of money to the company, a tight
considered good.
produced, then the unit of control should be kept on overtime
This is just a representative figure percentage.
measure should ideally be number
and further investigation is required of minutes produced. This is Total overtime minutes
to investigate the results. Overtime, Overtime = X 100
summation of each garment Total working minutes
work outsourcing, vendor delay, produced multiplied by its
quality can affect this index value This can be calculated over days,
standard minute value. Capacity
and the result may need further weeks or months, representing the
should also be expressed in
overtime being used in the factory.
investigation. For example a 100% number of minutes.
Planning department can improve
PPI may have been achieved by As stated in an article in Economic their plan in future and keep a
doing a lot of overtime which is not Times, Richa Industries garment check on their plan based on these
the expected result. division runs with a capacity overtime trends.
On-time Delivery: This represents utilization of 88%.
OTIF: OTIF (On Time In Full),
the percentage of deliveries that Example: Factory XYZ has 400 or DIFOT (Delivered In Full On
a factory is able to make on-time operators and they work at 65%
Time), is one of the fundamental
without any delays or extensions. efficiency. The factory runs 24 days in
measurements for logistics
a month, 8 hours each day.
On-time = On-time delivery performance. It measures, weather
X 100
delivery Total deliveries The factory made 2, 00,000 pieces of the Supply Chain was able to deliver
12 minutes each in the last month. or not -
An on-time delivery means that the
products are delivered exactly on Produced minutes = 2, 00,000 X 12 Ÿ The expected product
the date the exporter has promised = 24,00,000 minutes (reference and quality)
to the customer. A before time Capacity = 400 X 0.65 X 24 X 480 Ÿ In the quantity ordered (with
delivery is equally bad as a late = 29,95,200 minutes the tolerance defined by the
delivery as it needs the buyer to Capacity utilization = customer)
spend on warehouse space and 24,00,000/29,95,200 = 80% Ÿ At the place agreed
money. This simple indicator is a Ÿ At the time expected by the
Lead Time: The lead time is the
very important factor in most customer
time period between the
buyers' books to evaluate their Number of deliveries OTIF
placement of an order and the OTIF =
Total number of deliveries
X 100
factory performances.
shipment of the completed
Capacity Utilization: Extent or level order to the customer. A short To reach a good OTIF level, all the
to which the productive capacity of manufacturing lead time is a functions of the supply chain (among
a factory is being used in generation competitive advantage; many which orders taking, procurement,
of goods. Therefore, it refers to the customers want the delivery of suppliers, warehouses, transport...)
relationship between actual output their products as soon as have to work at their best level. OTIF
that ‘is’ produced with the installed possible following the placement of allows seeing at a glance; how the
equipment and manpower, and the the order. Lead time consists company delivers its customers.

SEPTEMBER 2012 l 4UJUDIWorld 41