RINGKASAN SEBUT HARGA

NO.SEBUT HARGA : PPj/RT/JB/69/2019

CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4, PRESINT 9, W


PUTRAJAYA SECARA RUNDINGAN TERUS

SECT. DESCRIPTION FROM PAGE

1 PRELIMINARIES BQ 1.2

2 HOUSEKEEPING & PEST CONTROL BQ 2.4

3 MECHANICAL SERVICES AND SYSTEM BQ 3.3

4 ELECTRICAL SERVICES AND SYSTEM BQ 4.3

MAINTENANCE OF CIVIL AND STRUCTURAL


5 BQ 5.3
COMPONENTS

6 LANDSCAPING WORKS BQ 6.2

7 PROVISIONAL SUM BQ 7.2

JUMLAH KESELURUHAN DIBAWA KE BORANG SEBUT HARGA

RINGGIT MALAYSIA : ……………………………………………………………………………………


………………………………………………………………………………………………………………
Bertarikh……………………………………….haribulan…………………………………………….20
Tempoh siap kerja: 2 (DUA) Bulan 18 (LAPAN BELAS) Hari

…………………………………………………………………… …………………………………………
Tandatangan Penyebut harga Tandatangan Saksi

RS 1
Nama Penuh :……………………………………………… Nama Penuh :…………………………
No.K/P :………………………………………… No.K/P :………………………
Atas Sifat :……………………………………………… Pekerjaan ;……………………
yang berkuatkuasa dengan sempurnanya Alamat :……………………
untuk menandatangani Sebut harga ini.

……………………………………………………………………….
Meterai dan Cop Penyebut harga
Alamat :…………………………………………………………………………..
………………………………………………………………………….
………………………………………………………………………….

No.Telefon :………………………………………………………………………….

RS 1
RINGKASAN SEBUT HARGA
O.SEBUT HARGA : PPj/RT/JB/69/2019

AAN APARTMENT FASA 3 DAN 4, PRESINT 9, WILAYAH PERSEKUTUAN


RAJAYA SECARA RUNDINGAN TERUS

TOTAL AMOUNT (RM)

………………..

………………..

………………..

………………..

………………..

………………..

60,000.00

………………..

…………………………………………………………………………………………
………………………………………………………………………………………………
haribulan…………………………………………….2019
18 (LAPAN BELAS) Hari

…………………………………………………………

RS 1
Nama Penuh :……………………………………………
No.K/P :………………………………………..
Pekerjaan ;………………………..………………
Alamat :………………………………………

RS 1
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

SECTION 1 : PRELIMINARIES
This section is to be read in conjunction with
bill of quantities, drawings, specifications
and other section contained in these
documents which shall be construed as
being complementary to one another.

A START UP PROCEDURE
Upon receipt of Letter of Acceptance, the
contractor shall provide the following
insurances and documentation :-

1 Fee/Premium for Perfomance Maintenance Sum -


Bond

B PERSONNEL
Provide management staff for 24 hours on
call as follows;

2 Competent LV Chargemen cum Facility monthly 2.5 ………………..


Manager (resident) at least A4 and three (3)
years experience (certified by Suruhanjaya
Tenaga Malaysia)

- One (1) person


3 Technicians at least three (3) years monthly 2.5 ………………..
experience for Certificate holder from
Polytechnic/IKM/ILP
- Six (6) persons
4 Handyman monthly 2.5 ………………..
- Three (3) persons
C Office Maintenance Rental to Unit Utiliti, monthly 2.5 ………………..
Bahagian Pengurusan Hartanah (BPH)

D Preparation of six (6) nos. Contract nos 6 ………………..


Documents (hard cover binding) include
duty stamping

BQ 1.5
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

CARRIED TO COLLECTION PAGE BQ 1.2

BQ 1.6
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

COLLECTION PAGE

Page BQ 1.1

TOTAL CARRIED TO SUMMARY OF SEBUTHARGA

BQ 1.7
DAN 4 PRESINT 9 WILAYAH
GAN TERUS

AMOUNT (RM)

…………………………..

…………………………..

…………………………..

…………………………..

…………………………..

…………………………..

BQ 1.8
DAN 4 PRESINT 9 WILAYAH
GAN TERUS

AMOUNT (RM)

…………………………..

BQ 1.9
DAN 4 PRESINT 9 WILAYAH
GAN TERUS

AMOUNT (RM)

…………………………..
#REF!

…………………………..

BQ 1.10
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

WORK
REF DESCRIPTION UNIT QTY
FREQ.

SECTION 2 : HOUSEKEEPING & PEST CONTROL


SERVICES

Fasa 3 & 4, Presint 9


Cleaning Services
(Please refer to Specification for Housekeeping and Pest
Control Services , Vol 1/2 Part 3 Section A)
A Common Area & Public Restroom Daily Monthly 2.5
To provide workers, materials, consumables, tools,
equipments and machineries to carry out cleaning activities.
The scope of cleaning shall cover public area, stairwell, lifts,
multi-level & open car park, passageway, covered way,
signages, exterior cleaning, multi-purpose hall, surau,
children's playground equipment, refuse centre (as and when
required) , refuse bin and internal, external perimeter drains
and public restroom.

No. of workers: 3 persons


Working hours : 8.00 am - 6.00 pm daily
Monday - Friday
Saturday & Sunday / Public Holiday : 8.00 am - 2.00 pm

Fasa 3, Presint 9
B Specific Services
To provide workers, materials, consumables, tools,
equipments and machineries to carry out cleaning
activities. The scope of cleaning shall cover main lobby,
stairwell, and corridor for all blocks as prescribed
below :

Block 3A Daily Monthly 2.5


No. of workers: 2 persons
Working hours : 8.00 am - 6.00 pm daily
Monday - Friday
Saturday & Sunday / Public Holiday : 8.00 am - 2.00 pm

Block 3B Daily Monthly 2.5

BQ 2.11
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

WORK
REF DESCRIPTION UNIT QTY
FREQ.

No. of workers: 2 persons


Working hours : 8.00 am - 6.00 pm daily
Monday - Friday
Saturday & Sunday / Public Holiday : 8.00 am - 2.00 pm
Block 3C Daily Monthly 2.5
No. of workers: 2 persons
Working hours : 8.00 am - 6.00 pm daily
Monday - Friday
Saturday & Sunday / Public Holiday : 8.00 am - 2.00 pm

CARRIED TO COLLECTION PAGE BQ 2.5

BQ 2.12
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

WORK
REF DESCRIPTION UNIT QTY
FREQ.

(Section 2 : Continued)
Fasa 4, Presint 9
B Specific Services
To provide workers, materials, consumables, tools,
equipments and machineries to carry out cleaning activities.
The scope of cleaning shall cover main lobby, stairwell, and
corridor for all blocks as prescribed below :

Block 4A Daily Monthly 2.5


No. of workers: 2 persons
Working hours : 8.00 am - 6.00 pm daily
Monday - Friday
Saturday & Sunday / Public Holiday : 8.00 am - 2.00 pm

Block 4B Daily Monthly 2.5


No. of workers: 2 persons
Working hours : 8.00 am - 6.00 pm daily
Monday - Friday
Saturday & Sunday / Public Holiday : 8.00 am - 2.00 pm

Block 4C Daily Monthly 2.5


No. of workers: 2 persons
Working hours : 8.00 am - 6.00 pm daily
Monday - Friday
Saturday & Sunday / Public Holiday : 8.00 am - 2.00 pm

Block 4D Daily Monthly 2.5


No. of workers: 2 persons
Working hours : 8.00 am - 6.00 pm daily
Monday - Friday
Saturday & Sunday / Public Holiday : 8.00 am - 2.00 pm

Block 4E Daily Monthly 2.5


No. of workers: 2 persons

BQ 2.13
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

WORK
REF DESCRIPTION UNIT QTY
FREQ.

Working hours : 8.00 am - 6.00 pm daily

Monday - Friday
Saturday & Sunday / Public Holiday : 8.00 am - 2.00 pm

Block 4F Daily Monthly 2.5


No. of workers: 2 persons
Working hours : 8.00 am - 6.00 pm daily
Monday - Friday
Saturday & Sunday / Public Holiday : 8.00 am - 2.00 pm

CARRIED TO COLLECTION PAGE BQ 2.5

BQ 2.14
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

WORK
REF DESCRIPTION UNIT QTY
FREQ.

(Section 2 : Continued)

Fasa 3 dan 4, Presint 9

C Pest Control Services

1 To carry out monthly pest control treatment within the


building area which include pavement, drain, rubbish
bin, refuse chamber, utiliti rooms, landscape furnitures,
Monthly nos. 2.5
vacant houses and etc. The scope area as follows;

i.Residual treatment, baiting and monthly inspection for:

# Control of ants, cockroaches, borers, bees, hornets


and flies at building and structure area
# Control of subterranean termites at all of the
structures.
ii. Mosquito control including sump with larvacide and
fogging
iii. Rats inspection and treatment to all of the above
mentioned structures.

D Sanitary Bins

To Supply Sanitary Bins to all ladies toilet


To service bins at all ladies toilets nos 8

CARRIED TO COLLECTION PAGE BQ 2.5

BQ 2.15
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

WORK
REF DESCRIPTION UNIT QTY
FREQ.

COLLECTION PAGE

Page BQ 2.1

Page BQ 2.2

Page BQ 2.3

BQ 2.16
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

WORK
REF DESCRIPTION UNIT QTY
FREQ.

TOTAL CARRIED TO SUMMARY OF SEBUTHARGA

BQ 2.17
ESINT 9 WILAYAH PERSEKUTUAN
S

AMOUNT
RATE (RM)
(RM)

…………… ……………..

0.00

…………… ……………..

…………… ……………..

BQ 2.18
ESINT 9 WILAYAH PERSEKUTUAN
S

AMOUNT
RATE (RM)
(RM)

…………… ……………..

……………..

BQ 2.19
ESINT 9 WILAYAH PERSEKUTUAN
S

AMOUNT
RATE (RM)
(RM)

0.00

…………… ……………..

…………… ……………..

…………… ……………..

…………… ……………..

…………… ……………..

BQ 2.20
ESINT 9 WILAYAH PERSEKUTUAN
S

AMOUNT
RATE (RM)
(RM)

…………… ……………..

…………….

BQ 2.21
ESINT 9 WILAYAH PERSEKUTUAN
S

AMOUNT
RATE (RM)
(RM)

0.00

…………… ……………..

…………… ……………..

……………..

BQ 2.22
ESINT 9 WILAYAH PERSEKUTUAN
S

AMOUNT
RATE (RM)
(RM)

……………..

…………….

……………..

BQ 2.23
ESINT 9 WILAYAH PERSEKUTUAN
S

AMOUNT
RATE (RM)
(RM)

……………..

BQ 2.24
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

SECTION 3: MECHANICAL SERVICES AND SYSTEM

All quantities are provisional and subject to


remeasurement at site.All the price include labor,
machineries, transportation and material.

Fasa 3 dan 4, Presint 9


A PREVENTIVE MAINTENANCE AND OPERATION
MECHANICAL SERVICES AND SYSTEM

1 Air Conditioning and Mechanical Ventilation


Systems At Lift Motor Rooms

1.1 To carry out monthly servicing of the air conditioning and monthly 2.5 ……………
ventilation system and replacement for spares (when
required) and consumable at every lift motor room. (The
scope include general and chemical cleaning on fan coil
unit and condenser, filter, drain pan, blower, control
panel, vibration check and top up gas.)

2 Air Conditioning and Mechanical Ventilation Systems


at HT/ LV/ Transformer/ Genset Room Ventilation fan,
car park ventilation system and etc.

To check and clean Filter & condenser for ACSU monthly 2.5 ……………
inclusive of all motors, grilles, dampers and etc.

3 Domestic Cold Water Pump System, All Water Tanks


Maintenance & Service & Cleaning

BQ 3.25
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

a) To check, service, clean & make sure the Cold Water


Pump Control Panel/ Pressure Tank/ Gate Valve/ Piping
bracket/ pumpset running in good condition Inclusive
Water Tanks Accessories : Access manholes, Air Vent,
Water level Indicator, Internal Ladder & external Ladder.
b)
Exclusive Water Tanks Main Component : Top Panel,
Side Panel, Bottom Panel, Body Angle, Corner angle, Tie
Rod bracket, Side panel support, pole, pole support, tie
rod & roof support, Pumpset (if faulty), valve and etc.

3.1 Pump Room at all Blocks monthly 2.5 ……………

CARRIED TO COLLECTION PAGE BQ 3.3

BQ 3.26
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

(Section 3 : Continued)

4 Fire Fighting Pump System, All Water Tanks


Maintenance & Service & Cleaning
a) To check, service, clean & make sure the Cold Water
Pump Control Panel/ Pressure Tank/ Gate Valve/ Piping
bracket/ pumpset running in good condition Inclusive
Water Tanks Accessories : Access manholes, Air Vent,
Water level Indicator, Internal Ladder & external Ladder.
b)
Exclusive Water Tanks Main Component : Top Panel,
Side Panel, Bottom Panel, Body Angle, Corner angle, Tie
Rod bracket, Side panel support, pole, pole support, tie
rod & roof support, Pumpset (if faulty), valve and etc.

4.1 Pump Room at Blocks 3B & 4F monthly 2.5 ……………

5 Fire Alarm, Fire Monitoring and Fire Fighting


Systems
5.1 Main Fire Alarm Control Panels, Fire Alarm Control monthly 2.5 ……………
Panles & Pumping System (inclusive All Wet Riser/Hose
Reel Pump, Relays, Smoke Detectors, Heat detectors,
batteries, addressable sensors, zone/manager cards,
indicator lamps & to monitor fire fighting water tanks etc)

6 Monthly Comprehensive Maintenance for Lift System


By Sole agent/pricipal
Comprehensive maintenance for eighteen units Fuji HD
Lift at
6.1 Lift at Block 3A - 2 nos monthly 2.5 ……………

6.2 Lift at Block 3B - 2 nos monthly 2.5 ……………

6.3 Lift at Block 3C - 2 nos monthly 2.5 ……………

6.4 Lift at Block 4A - 2 nos monthly 2.5 ……………

6.5 Lift at Block 4B - 2 nos monthly 2.5 ……………

BQ 3.27
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

6.6 Lift at Block 4C - 2 nos monthly 2.5 ……………

6.7 Lift at Block 4D - 2 nos monthly 2.5 ……………

6.8 Lift at Block 4E - 2 nos monthly 2.5 ……………

6.9 Lift at Block 4F - 2 nos monthly 2.5 ……………

CARRIED TO COLLECTION PAGE BQ 3.3

BQ 3.28
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

COLLECTION PAGE

Page BQ 3.1

Page BQ 3.2

BQ 3.29
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

TOTAL CARRIED TO SUMMARY OF SEBUTHARGA

BQ 3.30
ESINT 9 WILAYAH
S

AMOUNT
(RM)

……………..

……………..

BQ 3.31
ESINT 9 WILAYAH
S

AMOUNT
(RM)

……………..

…………….

BQ 3.32
ESINT 9 WILAYAH
S

AMOUNT
(RM)
0.00

……………..

……………..

……………..

……………..

……………..

……………..

……………..

BQ 3.33
ESINT 9 WILAYAH
S

AMOUNT
(RM)
……………..

……………..
……………..
……………..

……………..

BQ 3.34
ESINT 9 WILAYAH
S

AMOUNT
(RM)

#REF!

…………….

……………..

BQ 3.35
ESINT 9 WILAYAH
S

AMOUNT
(RM)

…………….

BQ 3.36
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

SECTION 4 : ELECTRICAL SERVICES AND SYSTEM

All quantities are provisional and subject to


remeasurement at site.All the price include labor,
machineries, transportation and material. All the
quantities including vacant houses as instructed by
Perbadanan Putrajaya

Fasa 3 dan 4, Presint 9


A COMPREHENSIVE MAINTENANCE AND OPERATION
OF ELECTRICAL SERVICES AND SYSTEM

1 MAIN SWITCH BOARD AND LOW VOLTAGE SYSTEM

1.1 To make sure all the electrical room including month 2.5 ……………
HT/LV/MSB Room and feeder pillar in good condition
(inlude cabling, final circuit wiring)

1.1.1 To provide one set monthly maintenance report complete month 2.5 ……………
with colour photograph.

2 GENERATOR SET
i. Brand : Perkins
400 KVA : 1 nos
ii. Brand : Perkins:
700 KVA : 1 nos

2.1 To make sure all the genset equipment including panel, month 2.5 ……………
charger, battery, lubrication system, cooling system, air
system, diesel tank, alternator in good condition (include
cabling, final circuit wiring)

3 Smart Master Antenna Television (SMATV)

3.1 To appoint competent person to check and reset nos 1 ……………


frequency of the system to ensure in good condition and
functional condition. (Frequency : Quarterly)

PAGE BQ 4.37
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

CARRIED TO COLLECTION PAGE BQ 4.4

PAGE BQ 4.38
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

(Section 4: Continued)

4 Earthing and Lightning Protection System


4.1 To provide monthly report for the relevant works as per nos 2.5 ……………
specification (Refer Part 3 - Section A)

Fasa 3 dan 4, Presint 9


5 Competent Electrical Engineer Visit
5.1 Regular once-a-month inspection of all electrical month 2.5 ……………
systems (including LV Room, HR Room, Genset Room
and etc) by Competent Electrical Engineer

B CORRECTIVE MAINTENANCE OF ELECTRICAL


SERVICES AND SYSTEM

2 Repair/Replacement Works

2.1 Lighting

2.1.1 Lampu Tube 18W nos 150 ……………


2.1.2 Lampu Tube 36W nos 150 ……………
2.1.3 Starter nos 300 ……………
42.70
2.2 Ventilation
2.2.1 Ceiling Fan nos 80 ……………

2.2.2 Exhaust Fan nos 80 ……………

2.3 Others 1,000.00


2.3.1 MCB 20 Amp nos 80 ……………
2.3.2 MCB 6 Amp nos 80 ……………
2.3.2 Soket 13Amp nos 80 ……………
2.3.3 Switchplate 3 - Gang nos 80 ……………
2.3.4 Water Heater Socket nos 80 ……………
2.3.5 Trouble shoot nos 20 ……………

PAGE BQ 4.39
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

CARRIED TO COLLECTION PAGE BQ 4.4

PAGE BQ 4.40
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

COLLECTION PAGE

Page BQ 4.1

Page BQ 4.2

PAGE BQ 4.41
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILA
PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

TOTAL CARRIED TO SUMMARY OF SEBUTHARGA

PAGE BQ 4.42
ESINT 9 WILAYAH
S

AMOUNT (RM)

……………..

……………..

……………..

……………..

PAGE BQ 4.43
ESINT 9 WILAYAH
S

AMOUNT (RM)

……………..

PAGE BQ 4.44
ESINT 9 WILAYAH
S

AMOUNT (RM)

……………..

……………..

0.00

0.00
0.00

0.00

……………..
……………..
……………..

……………..

……………..

……………..
……………..
……………..
……………..
……………..
……………..

PAGE BQ 4.45
ESINT 9 WILAYAH
S

AMOUNT (RM)

………………

PAGE BQ 4.46
ESINT 9 WILAYAH
S

AMOUNT (RM)

……………..

………………

PAGE BQ 4.47
ESINT 9 WILAYAH
S

AMOUNT (RM)

……………..

PAGE BQ 4.48
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY

SECTION 5 : MAINTENANCE OF CIVIL AND


STRUCTURAL COMPONENTS

Fasa 3 dan 4, Presint 9


A PLUMBING AND SANITARY SYSTEM

All quantities are provisional and subject to remeasurement


at site.All the price include labor, machineries, transportation
and material. All the quantities including vacant houses as
instructed by Perbadanan Putrajaya

1 Sewerage Lines, Manholes And Drainage


1.1 To provide report for monthly servicing of gutter, sewerlines month 2.5
and mainhole including :-
- inspection of sewerlines, mainhole and drainage.
- inspection of rainwater gutter include clean from any
blockage.
- inspection of perimeter drain.

2 Replace damaged toilet fitting including supply of materials


and all other related works as listed:
a) WC Flushing System nos. 150
b) Waste trap nos. 150
c) Flexible Hose nos. 150
d) Replace bottle trap (kitchen/toilet) nos. 150
e) Service mangkuk tandas nos. 150
f) Toilet Seat Cover nos. 150
g) Stopcock nos. 150
h) Service floor trap nos. 150
i) Wall tap nos. 150
j) Angle Valve nos. 150
k) Sink Tap nos. 150
l) Shower Set nos. 150
m) Endcap nos. 150

1.3 Replace damaged 13mm chrome plated swan neck pillar tap nos. 200
with ABS handle

B CIVIL & STRUCTURE


CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY

All quantities are provisional and subject to remeasurement


at site.All the price include labor, machineries, transportation
and material. All the quantities including vacant houses as
instructed by Perbadanan Putrajaya

1.1 Floor

Replace damaged floor finishes including supply of materials


and all other related works as listed: (homogenues tile or
equivalent to current specification)
a) Tiles m2 100

CARRIED TO COLLECTION PAGE BQ 5.2


CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY

(Section 5 : Continued)

1.2 Door

Replace damaged door locks set including supply of


materials and other related works as listed :

a) Grille Lockset nos. 80


b) Window Hinges nos. 80
c) Window Handle Lock nos. 80
d) Lockset 70mm Thumbturn & Key Profile Cylinder nos. 80
e) Deadbolt lockset nos. 80
f) Latch nos. 80
g) Door Closer nos. 80
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY

TOTAL CARRIED TO SUMMARY OF SEBUTHARGA


CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY

COLLECTION PAGE

Page BQ 5.1
Page BQ 5.2
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY

TOTAL CARRIED TO SUMMARY OF SEBUTHARGA


SINT 9 WILAYAH PERSEKUTUAN

RATE (RM) AMOUNT (RM)

…………… …………….

…………… …………….
…………… …………….
…………… …………….
…………… …………….
…………… …………….
…………… …………….
…………… …………….
…………… …………….
…………… …………….
…………… …………….
…………… …………….
…………… …………….
…………… …………….

…………… …………….
SINT 9 WILAYAH PERSEKUTUAN

RATE (RM) AMOUNT (RM)

…………… …………….

………………
SINT 9 WILAYAH PERSEKUTUAN

RATE (RM) AMOUNT (RM)

…………… …………….
…………… …………….
…………… …………….
…………… …………….
…………… …………….
…………… …………….
…………… …………….
SINT 9 WILAYAH PERSEKUTUAN

RATE (RM) AMOUNT (RM)

…………….
SINT 9 WILAYAH PERSEKUTUAN

RATE (RM) AMOUNT (RM)

…………….
…………….
SINT 9 WILAYAH PERSEKUTUAN

RATE (RM) AMOUNT (RM)

……………..
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYA
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION FQY UNIT QTY

SECTION 6 : LANDSCAPING WORKS

Fasa 3 dan 4, Presint 9


A To provide sufficient manpower, equipment,
chemicals and transportation to carry out watering to
all plants (2 times daily), cleaning and upkeeping of
garden waste and dispose from site and to ensure the
landscape area free from landscape debris, fallen
trees, twick , dried leaves, etc.: -

-Minimum numbers of 5 workers (8.00 am - 6.00 pm) Daily Monthly 2.5


daily

B Light Shearing / Trimming

To provide sufficient tools and equipments to carry out


shearing and light pruning:
a) Trees (272 nos) Monthly nos. 2.5

b) Palms (53 nos) Monthly nos. 2.5

c) Turf (600m²) Monthly nos. 2.5

C Grass Cutting
To provide sufficient manpower, tools, transportation Twice nos. 5
and equipments to carry out heavy grass cutting monthly
works (within the perimeter of the kuarters)

Ground cover (600 m2)


CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYA
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION FQY UNIT QTY

CARRIED TO COLLECTION PAGE BQ 6.2


CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYA
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION FQY UNIT QTY

COLLECTION PAGE

Page BQ 6.1
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYA
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION FQY UNIT QTY

TOTAL CARRIED TO SUMMARY OF SEBUTHARGA


ESINT 9 WILAYAH PERSEKUTUAN
S

RATE (RM) AMOUNT (RM)

…………. ………………

…………. ………………

…………. ………………

…………. ………………

…………. ………………

110.00 0.00

330.00 0.00
ESINT 9 WILAYAH PERSEKUTUAN
S

RATE (RM) AMOUNT (RM)

248,184.00
……………..
ESINT 9 WILAYAH PERSEKUTUAN
S

RATE (RM) AMOUNT (RM)

……………..
ESINT 9 WILAYAH PERSEKUTUAN
S

RATE (RM) AMOUNT (RM)

……………..
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH PE
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

SECTION 7 : PROVISIONAL SUM


Provisional sum provided in the Bills
of quantities (if any) shall be
expensed as directed by the P.R.'s
representative and deducted whole or
in part if not required.

Replacement of defective MEP parts and


repair works:

- any mechanical fault and to carry out Provisional Sum -


repair or replacement any damages on
mechanical system i.e bearing, motor
coil, leakage, shaft, check valve, float
valve, gate valve and etc.

- to trace any electrical fault and to carry


out repair or replacement of any
damages on electrical system and faulty
cabling i.e air condition, internal
domestic cabling, underground cabling,
lighting pole, DB, SSB, MCCB
components, capacitor, relays, timer and
etc.

Civil & Structure Works:


- any damages on civil and structure, i.e
children playground equiptment,
rainwater downpipe, grills, step railing,
drain covers, road surface, wall and etc

BQ 7.69
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH PE
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

CARRIED TO COLLECTION PAGE BQ 7.2

BQ 7.70
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH PE
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

COLLECTION PAGE

Page BQ 7.1

BQ 7.71
CADANGAN KERJA PENYELENGGARAAN APARTMENT FASA 3 DAN 4 PRESINT 9 WILAYAH PE
PUTRAJAYA SECARA RUNDINGAN TERUS

REF DESCRIPTION UNIT QTY RATE (RM)

TOTAL CARRIED TO SUMMARY OF SEBUTHARGA

BQ 7.72
ESINT 9 WILAYAH PERSEKUTUAN
S

AMOUNT (RM)

30,000.00

30,000.00

BQ 7.73
ESINT 9 WILAYAH PERSEKUTUAN
S

AMOUNT (RM)

60,000.00

BQ 7.74
ESINT 9 WILAYAH PERSEKUTUAN
S

AMOUNT (RM)

60,000.00

BQ 7.75
ESINT 9 WILAYAH PERSEKUTUAN
S

AMOUNT (RM)

60,000.00

BQ 7.76
Total Provisional Sum