LAMINATION PROCESS
Pre-processing
Processes involved in preparing the glass before actual processing
procedure to ensure quality of processing.
Storage
Sealed packs must be used within 6 months from the date of receipt,
while unsealed packs should be used within 2 months. When it comes
to unloading, fiche number/tag number has to be noted at crate level.
The coating surface should be away from the operator, placed on racks.
The crates must be opened with care. Tag number and photos must be
recorded in case of any defects or breakages.
Storage Condition
Cutting
Precautions should be taken to keep the table clean. Oil should be
based on the recommendation ACECUT 5503. Templates should not
touch the coated side.
Cork pads
Paper interlayer
Fork pads
Corrugated cardboard strips
Grinding
There are two types of grinding : Rough Grinding and Crystal Edging. It
is essential to keep the glass fully wet during the whole grinding
process. Wash the glass within 30 seconds of rising. Manual grinding
involves 100-120 grid belts for getting the raised section on the edges
of the glass. The belt should run in downward direction to minimize the
grit deposited on the surface. If the grinding is not done properly, then,
the temperature in the furnace....?
Washing