ROCK FILL
REQUEST DATE: 10/2/2005
REQUEST # 898
STATION # 1+725-2+003
LAYER NO. & LOCATION: 1st Layer Ramp A
AVERAGE THICKNESS: 0.462 m
MAX. SIZE (2/3 LAY. THIC): 0.308 m
SETTLEMENT:
0.433% ALLOWABLE SET (MAX): 30
No. OF READING : 1 2 3 4 5 6 7 8 9 10
ROD READING : 1.84 1.875 1.608 1.654 1.426 1.436 1.347 1.306 1.340 1.270
No. OF READING : 11 12 13 14 15 16 17 18 19 20
ROD READING : 1.291 1.26 1.233 1.190 1.781 1.627 1.508 1.354 1.176 1.140
No. OF READING : 1 2 3 4 5 6 7 8 9 10
ROD READING : 1.84 1.875 1.610 1.655 1.427 1.437 1.348 1.307 1.341 1.271
No. OF READING : 11 12 13 14 15 16 17 18 19 20
ROD READING : 1.293 1.261 1.234 1.190 1.781 1.628 1.509 1.355 1.177 1.141
DISAPPROVED DATE:
REMARKS:
1
2
#16
"6
"8 "8
#20
#10
#30
#12
"3
#80
#40
"4
:
#230
#50
#100
#400
"21/2
#325
#200
#120
"11/2
"1/2
#8
"3/4
"3/8
"16
"32
"40
"79
"10
"12
"60
"14
"24
"1
#4
"2
100 100
115; 100
118; 100
112; 100
109; 100
106; 100
103; 100
100; 100
97; 100
94; 100
91; 100
85; 100
82; 100
73; 100
70; 100
67; 100
64; 100
61; 100
55; 100
52; 100
49; 100
46; 100
43; 100
37; 100
34; 100
31; 100
22; 100
19; 100
16; 100
13; 100
7; 100
4; 100
121; 100
88; 100
79; 100
76; 100
58; 100
40; 100
28; 100
25; 100
10; 100
1; 100
95 95
PERCENT PASSING
90 90
85 85
CU = D60 / D10 = 150 / 2.96 = 50.7
80
80
75 75
70
70
65
65
60
60
55
55
50
50
45
45
40 40
35
35
30
30
25
25
20
20
15
15
10 10
5 5
0 0
122
116
113
107
104
92
89
80
77
71
65
62
59
41
35
32
29
26
14
8
5
2
119
110
101
98
95
86
83
74
68
56
53
50
47
44
38
23
20
17
11
0 .0 0 1 0 .0 1 0 .1 1 10 1 00 1 00 0 10 00 0
360
254
SIEVE SIZE, MM
FINE MEDIUM COARSE FINE MEDIUM COARSE COARSE FINE MEDIUM ROCK
CLAY
SILT SAND GRAVEL COBBLE
M.E. ( Contractor ) M.E. ( Consultant ) R.E. ( Consultant )