Final list of materials / tools for 271/k model town

Tools for site


Tools Unit Quantity
Hand trolley No's 1
Empty drum No's 1
Siri/korri No's 1

Tools For Worker / Site


Tools Unit Quantity
Meter tape 100 Feet 1
water level 50 feet 1
chapti 8 feet 1
chapti 7 feet 2
chapti 6 feet 2
chapti 4 feet 2

Material Required From Client


Material Unit Quantity
Bricks (dumper) Load 1
Tiles No's 9300
Soil (matti) Load 2
Sand (chanab) Cft 900
Polythene sheet Sqft 2505
Bitchuman Kg 200
Drum melting for bitumen 1
Wood for fire Kg 160
Kerosene oil Liter 100 aprox.
narial brush No's 2
empty small gallon No's 2