Checklist of tools, equipment, supplies and materials, and facilities


Name of Assessment Center SOUTHEASTERN MINDANAO INSTITUTE OF TECHNOLOGY (SMIT), INC.
Qualification MASONRY NC II
Item Specificatio Quantity Quantity Difference Inspectors Quantity Quantity onsite
n Required on Site Remarks onsite during
during Compliance
Compliance Audit
(1) (3) (4) (5) (6) Audit Year 2
(2) Year 1 (7)
(7)
LIST OF EQUIPMENT
PROJECT 1: LAY BRICKS/ BLOCKS FOR STRUCTURE AND PLASTERING
Skid loader
(optional)
Dumper
(optional)
Material hoist
(optional)
Pallet (optional)
Wheel borrow
(optional)
Buggy
(optional)
One-bagger
mixer (optional)
Two-bagger
mixer (optional)
Scaffoldings 1 set 1 set
LIST OF TOOLS
PROJECT 1: LAY BRICKS/ BLOCKS FOR STRUCTURE AND PLASTERING
1220 x
Mixing board 1 pc. 1 pc.
2440
Shovel 1 pc. 1 pc.
Pail 1 pc. 1 pc.
Screen wire 2-3 mm
1/2 meter 1/2 meter
mesh mesh
Mortar box 450 x 450 1 pc. 1 pc.
Mortar bucket 1 pc. 1 pc.
Safety helmet 1 pc. 1 pc.
Safety shoes 1 pair 1 pair
Working gloves 1 pair 1 pair
Working clothes 1 set 1 set
Dust mask 1 pc. 1 pc.
Body harness 1 pc. 1 pc.
Steel
square/carpent 1 pc. 1 pc.
er's square
Steel float 1 pc. 1 pc.
Push-pull rule 5m 1 pc. 1 pc.
Mason's
1 pc. 1 pc.
hammer
Plumb bob 1 pc. 1 pc.
Marking tools 1 pc. 1 pc.
Hand saw 1 pc. 1 pc.
Bar bender 1 pc. 1 pc.
Hack saw 1 pc. 1 pc.
300 ~ 400
Spirit level 1 pc. 1 pc.
long
Pointed trowel 1 pc. 1 pc.
Claw hammer 1 pc. 1 pc.
LIST OF MATERIALS
PROJECT 1: LAY BRICKS/ BLOCKS FOR STRUCTURE AND PLASTERING
Concrete hollow 150 x 200
10 pcs. 10 pcs.
blocks (CHB) x 400
Concrete hollow 200 x 200
35 pcs. 35 pcs.
blocks x 400
Cement Portland 6 bags 6 bags
Sand SI 1/2 cu. m 1/2 cu. m
Water
Rebar
10 mm ф 1 length 1 length
(reinforcing bar)
Reinforcing bar 12 mm ф 1 length 1 length
Concrete / C.W. 25mm
1/2 kilo 1/2 kilo
nails long
10 x 1220
Plywood 1 sheet 1 sheet
x 2440
50 x 50 x
Rough lumber 2 pcs. 2 pcs.
3000
Tie rod 1 pc. 1 pc.
Tie wire GA 16 1 kilo 1 kilo
Form oil 1 gal. 1 gal.
Wooden float 1 pc. 1 pc.
Reflected
working 1 set 1 set 1 set
drawing / plan
Nylon
string/nylon 6m 1 roll 1 roll
cord
10mm ф x
3000
Leveling hose 1 pc. 1 pc.
plastic
tube
25 x 75 x
Screed 1000 1 pc. 1 pc.
aluminum
Foam / paper 1 bunch
old
newspape
r
16 x 16 x
Plastering guide 2 pcs. 2 pcs.
1000
LIST OF TOOLS
PROJECT 2: INSTALL PRE-CAST BALLUSTER AND HANDRAILS
Push-pull rule 5m 1 pc. 1 pc.
Steel square 1 pc. 1 pc.
Leveling tool 1 pc. 1 pc.
Plumb bob 1 pc. 1 pc.
Mason's
1 pc. 1 pc.
hammer
Marking tools 1 pc. 1 pc.
390 ~ 400
Pointed trowel 1 pc. 1 pc.
long
Wooden trowel 1 pc. 1 pc.
Mortar box 450 x 450 1 pc. 1 pc.
Hack saw 1 pc. 1 pc.
Steel float 1 pc. 1 pc.
Rebars 10mm ф 2 length 2 length
Safety shoes 1 pair 1 pair
Safety gloves 1 pair 1 pair
Safety helmet 1 pc. 1 pc.
Working clothes 1 set 1 set
Gravel 3/4 grind 1/2 cu. m 1/2 cu. m
LIST OF MATERIALS
PROJECT 2: INSTALL PRE-CAST BALLUSTER AND HANDRAILS
Reflected
working plans 1 set 1 set
and drawings
Nylon string 6m 1 roll 1 roll
Chalk line 1 pc. 1 pc.
Concrete nails 25mm 1/2 kilo 1/2 kilo
Pre-cast 100 x 100
10 pcs. 10 pcs.
baluster x 600
50 x 50 x
Lumber (rough) 3 pcs. 3 pcs.
3000
G.I wire #12 1 kilo 1 kilo
Cement 2 bags 2 bags
100 x
Form plywood 1220 x 1 sheet 1 sheet
2440
Water
Sand S1 1/2 cu. m 1/2 cu. m

NOTE:Columns 1-4 to be filled out by the Assessment Center; Columns 5-6 to be filled out by