You are on page 1of 6

S.C. No. / W.O. No.

/
JPO No. Project Name Amendment No. Description Amount Accomplishment Date Billed
NTP No.

Balcony, Hallway and Stair Railings of


19-001 Mulberry Place 18-4258-09-02 2,941,494.00
Building C (DUI) and Building D (Marceline)

19-002 All Ladies Dormitory T&B Countertop Framing 8,900.00 100% 17-Jun-19
19-003 The Orabella 19-4259-10-00 Fire Exit Steel Stair Railings 763,200.00
19-004 Calathea Place W.O. No.2913 Airwell Framing at Site Development 401,425.00
19-005 FCO Residence Various Metal Works 237,730.00 100% 21-May-19
19-006 Bristle Ridge W.O. No.2979 Steel Lattice at Gazebo 18,300.00 100% 04-Mar-19

19-007 Torre De Manila 18-4910-59-00 1 Additional Steel Railings for the Powerhouse 8,580.00 100% 18-Jun-19

19-008 Lumiere Residences 16-4980-23-01 1 Additional Stiffener for EWT of West Tower 29,496.00 100% 03-Apr-19

19-009 Lumiere Residences Additional Drop-Off Canopy


Laundry Cage Framing and Lighting
Brackets, Atrium Framing and Roofdeck Steel
19-010 Mulberry Place 19-4258-28-00 4,695,017.60
Gate of Building C (Dui) and Building D
(Marcelline)

Steel Countertop and Lavatory Framing at


19-011 Calathea Place W.O. No.2873 Pool Shower Room (Site Devt.) and 40,500.00 100% 18-Jun-19
Basement Common Toilets
Fire Exit Stair Railings for Tower Celeste
19-012 Prisma Residences 19-4222-10-00 679,200.00
(B6-PH)

19-013 Lumiere Residences 16-4980-08-00 1 Additional Beam Separator for North Tower 340,860.00

Owner Supplied Materials for Additional


19-014 Verdon Parc W.O. No.2947 81,225.00 100% 04-Mar-19
Beam and Corbel (Elevator Shaft) at Bldg. 2

19-015 Calathea Place W.O. No.2998 Canopy Brackets at Bldg. A and B 50,690.00 100% 31-Jul-19
19-016 Lumiere Residences Additional
Fire Exit Stair Railings for the Shared Podium
19-017 Kai Garden Residences 19-4244-10-00 of Buildings Sugi, Icho and Hinoki and for 854,400.00
the Residential Levels of Building Sugi

19-018 Infina Towers 19-4246-10-00 Fire Exit Stair Railings for the South Tower 685,860.00

19-019 Cedar Crest Steel Grilles 15,685.00 100% 27-Mar-19


Main Entrance Canopy Support for Tower A
19-020 Prisma Residences NTP 205,000.00
(Astra)
Canopy Roof Framing including Main
19-021 Mulberry Place 19-4258-24-00 Entrance Canopy at Building C (Dui) and 1,848,965.00
Building D (Marcelline)
Balcony, Sky Patio, Breezeway and Hallway
19-022 Prisma Residences 19-4222-10-01 11,563,344.00
Railings for Tower A (Astra)

Steel Framing for Concrete Encasement at the


19-023 Calathea Place 19-4226-61-00 Basement Level of Buildings A (Zebrina), B 2,294,200.00
(Leonia), C (Lavender) & D (Marantina)

Spiral Staircase and Steel Framing of Double


19-024 All Ladies Dormitory 273,000.00 100% 03-Apr-19
Deck Bed
19-025 Fairlane Residences 19-FLN-10-00 Fire Exit Stair Railings for the Tower 926,256.00
19-026 DMCI Head Office W.O. No.3507 Steel Service Gate at DHCC Head Office 108,000.00 100% 18-Jun-19
Elevator Beam Separator for Tower B -
19-027 Prisma Residences 19-4222-08-00 1,500,000.00
Celeste (GF-RD)
Steel Lattice at Buildings Lauderdaleand
19-028 Oak Harbor Residences 19-4247-60-00 625,910.00
Westport
Metal Brackets for Mezzanine Fixed
19-029 Lumiere Residences 19-4980-57-00 277,225.00 100% 31-Jul-19
Windows at Function Hall of North Tower
Model Unit Balcony Railing, Main Entrance
Canopy Framing and Stair Railings of Main,
19-030 Davao Office 19-PC036-09-00 288,205.00
Ground Floor to B1, Fire Exit and PWD
Ramp
Fire Exit Stair Railing Works for Building 1
19-031 The Atherton 19-4257-10-00 283,128.00
(Oak)
Additional Lighting Brackets and Relocation
19-032 Alea Residences 17-4219-28-00 1 of Meter Lounts at Laundry Cage for Building 34,220.00 100% 31-Jul-19
Surya
Balcony, Hallway and Stair Railings for
19-033 Verdon Parc 19-4243-10-00 6,330,199.80
Building 4 (Maurin)
Balcony, Hallway, Open Lounge Lobby &
19-034 Fairway Terraces 16-4232-10-01 1 48,428.56 100% 31-Jul-19
Sky Patio Railings
Balcony and Hallway Railings for the South
19-035 Infina Towers 19-4246-10-01 10,699,416.00
Tower
19-036 Calathea Place W.O. No.2491 Transformer Room Gate 34,480.00 100% 31-Jul-19
Elevator Beam Separator for Tower C - Kiran
19-037 Prisma Residences 19-4222-08-01 1,397,000.00
(GF-RD) using W6 x 9 I-Beam

Main Entrance Canopy Framing (Additional


19-038 Oak Harbor Residences 18-4247-27-00 1 Cost for cutting of I-beam W10x39, 2 sets) 150,000.00
Lauderdale & Westport, Aston

19-039 Little Red Riding Hood Saw Horse Table Legs (1set) 5,080.00
19-040 Ivorywood 19-4216-52-00 Additional Steel Fence 1,877,950.00
Stair Railing to Machine Room, Skylight
19-041 Verdon Parc 19-4243-32-00 Framing and Parapet Railings at Roofdeck of 594,206.12
Building 3 (Trevans)
19-042 The Birchwood W.O. No.3439 Buho Framing 78,450.00
19-043 Ivorywood W.O. No.2723 Secondary Gate 57,209.00
19-044 Maple Place W.O. No.2453 Version No.02 Steel Posts 285,485.00 100% 05-Aug-19
19-045 Verawood Residences W.O. No.0155 Access Steel gate at Roofdeck 330,500.00
19-046 Bristle Ridge W.O. No.4123 Service Room Gate at Link Bridge 26,000.00

19-047 Fairlane Residences W.O. No.4420 Cyclone Wire Fence for the Modular Barracks 340,000.00

Balcony and Hallway Railings for Building


19-048 Kai Garden Residences 19-4244-10-01 10,045,108.40
Sugi
Elevator Beam Separator using W6 x 9 for
19-049 The Atherton 19-4257-08-00 245,700.00
Bldg. Helecia Ground Floor to Roofdeck
Additional Base Plate for the Steel Walkway
19-050 Lumiere Residences 18-4980-62-00 1 40,000.00
going to North Tower

Elevator Beam Separator for the Basement to


Roofdeck Levels of Buildings Hacana and
19-051 Satori Residences 19-SAT-08-00 748,800.00
Lana, and Basement to Ground Floor Levels
of Buildings Rahu and Yasu

Elevator Beam Separator using w6 x 9 for the


19-052 Cameron Residences 19-CAR-08-00 2,421,900.00
Tower
Additional Railings at Ground Floor and Site
19-053 Sheridan Towers 16-4930-10-00 2 69,667.00
Dev't of North Tower
Countertop Framing at Roof Deck and
19-054 Sheridan Towers 17-4930-21-00 1 21,106.00
Ground Floor