Field Work No. 6 Differential Leveling With Turning Points (Double-Rodded)
Field Work No. 6 Differential Leveling With Turning Points (Double-Rodded)
SUBMITTED BY:
SN:
DATE OF FIELDWORK:
DATE OF SUBMISSION:
SUBMITTED TO:
GRADE
PROFESSOR: ENGR. BIENVENIDO CERVANTES
FINAL DATA SHEET
POINT 1
H.I. = 201.40m
ELEVATION = 199.6m
CONCLUSION
With the aid of a Precise level, we were able determine the elevation
of a specific path easily. By using the leveling rod and precise level
instrument, we were able to record the back sight and the foresight from a
specific point inside the range of every 10 meters and we moved the
precise level every back sight and foresight recorded for every 10 meter
range.
RECOMMENDATION
The next group that would survey inside the Intramuros wall must ask
for a permit first at least from their professor and give it to the ones who are
guarding the wall for they may interrupt your field work constantly. And if
there are no permit given to you by the prof, get the permit at the main
office of the Intramuros.