Sl No.

Activity No Activity/Description Remarks

1 A Site Work
2 a Site cleaning
3 i Removing Trees
4 ii General excavation
5 iii Leveling
6 b Bore well digging
7 i Bore
8 ii Bore Well vendors
9 c Temporary Shed construction
10 i Barrication/ Temporary compound wall
11 ii Office & Store room
12 iii Sump
13 iv Labour shed
14 B Excavation
15 i Marking
16 ii Mass excavation
17 C Structure work
18 a Foundation
19 i Layout footing/ Survey marking
20 ii Soil digging for footing
21 iii Dressing
22 iv PCC
23 v Survey marking
24 vi Reinforcement work
25 vii Inspection/Checking
26 viii Form work
27 ix Inspection/Checking
28 x Concrete pouring
29 xi Post concrete checking
30 x Curing
31 xi Waterproofing
32 b Pedestal/ Retaining wall
33 i Survey marking
34 ii Reinforcement work
35 iii Inspection/Checking
36 iv Form work
37 v Inspection/Checking
38 vi Concrete pouring
39 vii Post concrete checking
40 viii Curing
41 ix Waterproofing
42 c Grade slab
43 i Soil filling
44 ii Dressing
45 iii PCC
46 iv Anti termite coat
47 v Reinforcement work
48 vi Inspection/Checking
49 vii Form work
50 viii Inspection/Checking
51 ix Concrete pouring
52 x Post concrete checking
53 xi Curing
54 d Column/Wall upto podium lvl
55 i Survey marking
56 ii Reinforcement work
57 iii Inspection/Checking
58 iv Form work
59 v Inspection/Checking
Sl No. Activity No Activity/Description Remarks
60 vi Concrete pouring
61 vii Post concrete checking
62 viii Curing
63 e Podium Beam & Slab
64 i Form work
65 ii Inspection/Checking
66 iii Reinforcement work
67 iv Inspection/Checking
68 v Electrical conduit fixing - slab lvl
69 vi Inspection/Checking
70 vii Concrete pouring
71 viii Post concrete checking
72 ix Curing
73 x Waterproofing
74 f Column/Wall all lvl
75 i Survey marking
76 ii Reinforcement work
77 iii Inspection/Checking
78 iv Form work
79 v Inspection/Checking
80 vi Concrete pouring
81 vii Post concrete checking
82 viii Curing
83 g Beam & Slab all lvl
84 i Form work
85 ii Inspection/Checking
86 iii Reinforcement work
87 iv Inspection/Checking
88 v Electrical conduit fixing - slab lvl
89 vi Inspection/Checking
90 vii Concrete pouring
91 viii Post concrete checking
92 ix Curing
93 h SWT, Fire Raw Treated water tanks & STP
94 i Layout/ Survey marking
95 ii Soil digging for footing
96 iii Dressing
97 iv PCC
98 v Survey marking
99 vi Reinforcement work
100 vii Inspection/Checking
101 viii Form work
102 ix Inspection/Checking
103 x Concrete pouring
104 xi Post concrete checking
105 xii Curing
106 xiii Waterproofing
107 i OHT, Fire Raw Treated water tanks & LMR
108 i Survey marking
109 ii Reinforcement work
110 iii Inspection/Checking
111 iv Form work
112 v Inspection/Checking
113 vi Concrete pouring
114 vii Post concrete checking
115 viii Curing
116 ix Waterproofing
117 C Masonry work all lvl
118 i Floor cleaning
119 ii Layout marking
Sl No. Activity No Activity/Description Remarks
120 iii Inspection/Checking
121 iv Brick/Block masonry
122 v Bed concrete (only 4" thick wall)
123 vi Lintel fixing
124 vii Brick/Block masonry packing & finishing
125 viii Inspection/Checking
126 ix Curing
127 D Internal Plastering all lvl
128 a Ceiling plastering
129 i Scaffolding errection
130 ii Grinding/ Cleaning
131 iii Hacking
132 iv Button marking
133 v Inspection/Checking
134 vi Plastering
135 vii Lime rendring
136 viii Inspection/Checking
137 ix Curing
138 b Wall plastering
139 i Hacking
140 ii Button marking
141 iii Inspection/Checking
142 iv Electrical conduit fixing - wall conduit
143 v Inspection/Checking
144 vi Mesh fixing
145 vii Scaffolding errection
146 viii Plastering
147 ix Lime rendring
148 x Inspection/Checking
149 xi Curing
150 E External Plastering all lvl
151 a Duct/Shaft plastering
152 i Hacking
153 ii Button marking
154 iii Inspection/Checking
155 iv Scaffolding errection
156 v Plastering
157 vi Inspection/Checking
158 vii Curing
159 b Wall plastering
160 i Scaffolding errection
161 ii Hacking
162 iii Button marking
163 iv Inspection/Checking
164 v Mesh fixing
165 vi Plastering 1st coat
166 vii Inspection/Checking
167 viii Plastering 2nd coat
168 ix Inspection/Checking
169 x Curing
170 G Wood work all lvl
171 i Frame fixing
172 ii Inspection/Checking
173 iii Shutter & hardware fixing
174 iv Inspection/Checking
175 v Polishing
176 vi Painting
177 H Railing work all lvl
178 i Marking
179 ii Fixing
Sl No. Activity No Activity/Description Remarks
180 iii Inspection/Checking
181 iv Bed concrete
182 v Painting
183 I Waterproofing - Toilet, Balcony & Planter
184 i Surface preparation
185 ii Bore packing
186 iii Coving & SBR
187 iv Inspection/Checking
188 v Brushpond coating
189 vi Inspection/Checking
190 vii Screed concrete & wall plastering
191 J Flooring work
192 i Floor cleaning
193 ii Mortar bed/Adhesive apply
194 iii Floor tile fixing
195 iv Grouting
196 v Inspection/Checking
197 vi Skirting fixing
198 vii Packing
199 viii Cleaning
200 K Dadoing/Clading
201 i Rough plastering
202 ii Bonding mortar/Adhesive apply
203 iii Wall tile/Granite fixing
204 iv Grouting
205 v Inspection/Checking
206 vi Cleaning
207 L Window/ UPVC Glass work
208 i Frame fixing
209 ii Inspection/Checking
210 iii Shutter & hardware fixing
211 iv Inspection/Checking
212 M Painting work
213 a Internal painting
214 i Scaffolding errection
215 ii Surface preparation
216 iii 1st coat putty
217 iv 2nd coat putty
218 v Polishing
219 vi Inspection/Checking
220 vii 1st coat paint
221 viii 2nd coat paint
222 ix Inspection/Checking
223 x Cleaning
224 b External painting
225 i Scaffolding errection
226 ii Surface preparation
227 iii 1st coat primer
228 vi Inspection/Checking
229 vii 1st coat paint(for normal finish)/ spray textured coat(fortexture paint)
230 viii 2nd coat paint(for normal finish)/ spray textured coat(fortexture paint)
231 ix Inspection/Checking
232 x 1st coat textured top coat
233 xi 2nd coat textured top coat
234 xii Inspection/Checking
235 N Water supply and Sanitary works
236 a Internal plumbing & Sanitary work
237 i Core cutting
238 ii Internal line fixing
239 b External plumbing & Sanitary work
Sl No. Activity No Activity/Description Remarks
240 i Scaffolding errection
241 ii Duct line fixing
242 iv Ringmain fixing
243 c Testing
244 d CP & Sanitary fixtures fixing
245 e Pumps & SWH fixing & checking
246 O Electrical works
247 a Internal electrical works
248 i Wiring
249 ii Swich box fixing
250 iii Install Electrical service panel & Caple tray
251 iv Testing
252 b External electrical works (Light fittings)
253 i Conduiting
254 ii Wiring
255 iii Swich box fixing
256 iv Testing
257 c Lightning protection system
258 P Fire Protection System
259 a Internal works
260 i Core cutting
261 ii Marking
262 iii Internal line fixing
263 iv Nozzle & Sensor fixing
264 b External works
265 i Duct line fixing
266 ii Ringmain fixing
267 c Testing
268 d Fire escape staircase Doors & Duct Doors
269 Q Smart living features
270 R External development
271 a Landscaping
272 Patios
273 Porches
274 Sidewalks
275 Decks
276 Driveways
277 Grade & Seeds
278 b Swimming pool
279 c Play area
280 d Compound wall & main gate
281 R Club House work

You might also like