You are on page 1of 10

ASPHALT EMULSION

A Basic
Asphalt
Emulsion
Manual

Manual Series No. 19


Third Edition

ASPHALT INSTITUTE
The Asphalt Institute and the Asphalt Emulsion
Manufacturers Association can accept no responsibility for
the inappropriate use of this manual. Engineering judgment
and experience must be used to properly utilize the princi-
ples and guidelines contained in this manual, taking into
account available equipment, local materials and conditions.

All reasonable care has been taken in the preparation of this


manual; however, the Asphalt Institute and the Asphalt
Emulsion Manufacturers Association can accept no responsi-
bility for the consequences of any inaccuracies it may con-
tain.

Photographs and drawings of equipment used in this publi-


cation are for illustration only and do not imply the prefer-
ential endorsement of any particular make or model by the
Asphalt Institute or the Asphalt Emulsion Manufacturers
Association.

LIBRARY OF CONGRESS
CATALOG CARD NUMBER:
86-72240

Printed in the USA


FOREWORD
The primary purpose of this manual is to impart a basic under-
standing of asphalt emulsions to those who work with the product.
Further, it is intended to be useful in choosing the emulsion that best
fits a project’s specific conditions. And it should be most helpful in
evaluating pavement systems for construction and maintenance.
The manual is not written in such detail that one can use it to pro-
duce asphalt emulsions. Neither is it directed toward the specific fea-
tures of one manufacturer’s products. Rather, it explains the general
characteristics of asphalt emulsions and their uses. In times past, lack
of information of this type may to some extent have prevented realiza-
tion of the full potential of emulsions.
A thorough study of the manual should enable one to recommend
where, when and how emulsions should be used. It also should aid in
the solving of problems that may arise on projects in which emulsions
are used.
The Asphalt Institute and the Asphalt Emulsion Manufacturers
Association have jointly published the third edition of “A Basic Asphalt
Emulsion Manual.” This publication was revised under the guidance of
Mr. John E. Huffman, P.E., of Brown and Brown, Inc., Salina, Kansas,

ASPHALT INSTITUTE
Research Park Drive
P.O. Box 14052
Lexington, Kentucky 40512-4052
(606) 288-4960
Fax (606) 288-4999

ASPHALT EMULSION
MANUFACTURERS ASSOCIATION
#3 Church Circle, Suite 250
Annapolis, Maryland 21401
(410) 267-0023
Fax (410) 267-7546

iii
CONTENTS
Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v
List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . x
List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .xi

Chapter 1: Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

History of Asphalt Emulsion . . . . . . . . . . . . . . . . . . . . . . . . . . . 1


Future of Asphalt Emulsion . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

Chapter 2: The Chemistry of Asphalt Emulsions . . . . . . . . . . . 5


Composition of Asphalt Emulsions . . . . . . . . . . . . . . . . . . . . . . . 5
Asphalt Emulsion Classification . . . . . . . . . . . . . . . . . . . . . . . . . 5
Variables Affecting Quality and Performance . . . . . . . . . . . . . . . . 7
Emulsion Ingredients . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Asphalt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Emulsifying Agents . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Producing the Emulsion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Emulsifying Equipment . . . . . . . . . . . . . . . . . . . . . . 10
The Emulsifying Process . . . . . . . . . . . . . . . . . . . . . . 11
Breaking and Curing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Breaking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Curing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Factors Affecting Breaking and Curing . . . . . . . . . . . . 13

Chapter 3: Storing, Handling and Sampling . . . . . . . . . . . . . . 15


Storing Asphalt Emulsions . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Handling Emulsified Asphalts . . . . . . . . . . . . . . . . . . . . . . . . . 16
Sampling Asphalt Emulsions . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Sampling Precautions . . . . . . . . . . . . . . . . . . . . . . . 20
Safety Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Protection and Preservation of Samples . . . . . . . . . . 20

v
Chapter 4: Testing Asphalt Emulsion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Asphalt Emulsion Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Particle Charge Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Emulsion Viscosity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Demulsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Identification Test for Cationic Rapid Setting Emulsion . . . . . . . . . . . . 23
Identification of Cationic Slow-Set Emulsions . . . . . . . . . . . . . . . . . . . 23
Settlement and Storage Stability Tests . . . . . . . . . . . . . . . . . . . . . . . . 24
Cement Mixing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Sieve Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Coating Ability and Water Resistance . . . . . . . . . . . . . . . . . . . . . . . . . 24
Field Coating Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Unit Weight of Asphalt Emulsion . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Residue and Oil Distillate by Distillation . . . . . . . . . . . . . . . . . . . . . . 25
Residue by Evaporation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Examination of Residue . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Additional Emulsion and Residue Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Breaking Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Vialit Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Zeta Potential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Elastic Recovery After Ductility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Force Ductility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Ring and Ball Softening Point . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Tensile Strength (Stress) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Torsional Recovery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Toughness and Tenacity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Chapter 5: Selecting the Right Type and Grade . . . . . . . . . . . . . . . . . 31

General Emulsion Uses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31


Rapid-Setting Emulsions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Medium-Setting Emulsions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Slow-Setting Emulsions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Quick-Setting and Micro-Surfacing Emulsions . . . . . . . . . . . . . . . . . . . 33
Guidelines for Successful Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

vi CONTENTS
Chapter 6: Surface Treatments . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Uses of Surface Treatments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Surface Treatment Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Asphalt Emulsion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Aggregate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Types of Treatments and Seals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Single Surface Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Multiple Surface Treatments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Cape Seal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Sandwich Seal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Sand Seal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Slurry Seal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Micro-Surfacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
Seal Coat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
Fog Seal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
Surface Treatment Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
The Asphalt Distributor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
Aggregate Spreader . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Rollers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Power Broom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Trucks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Sequence of Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Checking Application Rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Single Treatment Safeguards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Streaking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Bleeding (Flushing) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Loss of Cover Aggregate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64

CONTENTS vii
Chapter 7: Aggregate Mixes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Asphalt Emulsion Mixtures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Mixture Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Aggregates 66
Additives 67
Production of Emulsion Aggregate Mixtures . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
Mixed-in-Place Production . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Rotary/Reclaimer Mixing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
Travel Plants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Blade Mixing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Spreading and Compacting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
Emulsion Plant Mix (Cold) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
Mixing Plants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
Laydown and Compaction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
Seal Coat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
Emulsion Plant Mix (Warm and Hot) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Mixing Plants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Mixing and Temperatures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Construction Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Maintenance Mixtures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
Immediate Use Maintenance Mixes . . . . . . . . . . . . . . . . . . . . . . . . . . 78
Stockpile Maintenance Mixes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
Maintenance Mixes Using RAP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80

Chapter 8: Miscellaneous Applications . . . . . . . . . . . . . . . . . . . . . . 81


Tack Coat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
Mulch Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
Asphalt Emulsion Spray Mulch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
Asphalt Emulsion Mulch Tie-Down . . . . . . . . . . . . . . . . . . . . . . . . . . 83
Crack Sealing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Prime Coat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
Dust Palliative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
Repair of Potholes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88

viii CONTENTS
Chapter 9: Asphalt Pavement Recycling . . . . . . . . . . . . . . . . . . . . . . 91
Types of Recycling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Candidates for Recycling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
Advantages 93
Cold Recycling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
94
Plant Mixed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94
Mixed In-Place . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96

Chapter 10: Mix Design Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . 99


Full-Depth Reclamation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
Dense-Graded Aggregate Mix Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99
Aggregates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99
Asphalt Emulsions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99
Determination of Trial Emulsion Content . . . . . . . . . . . . . . . . . . . . . 100
Coating and Adhesion Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
Preparation of Test Specimens . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101
Testing of Compacted Specimens . . . . . . . . . . . . . . . . . . . . . . . . . . 102
Open-Graded Aggregate Mix Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104
Preparation of Mixtures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104
Testing Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104
Optimum Emulsion Content Determination . . . . . . . . . . . . . . . . . . . 105

Appendix A: Glossary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107


Final Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105
Aggregate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107
Asphalt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107
Asphalt Emulsion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 108
Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 108

Appendix B: Miscellaneous Tables . . . . . . . . . . . . . . . . . . . . . . . . . 111


Types of Asphalt Surface Treatments and Mixes . . . . . . . . . . . . . . . . . . . . . . . 109
Table B-1: Temperatures-Volume Corrections for Asphalt Emulsion . . . . . . . . . . 111
Table B-2: Quantities at Depths in Cylindrical Tanks in a Horizontal Position . . . 112

CONTENTS ix
List of Figures
Figure 2.1 Diagram of an Asphalt Emulsion Manufacturing Plant . . . . . . . . . . . . 10
Figure 2.2 Relative Sizes and Distribution of Asphalt Particles in an Emulsion . . 12
Figure 4.1 Particle Charge Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Figure 4.2 Saybolt Furol Viscosity Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Figure 4.3 Distillation Test for Asphalt Emulsion . . . . . . . . . . . . . . . . . . . . . . . 25
Figure 4.4 Float Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Figure 6.1 Flat Particles Are Covered When Enough Asphalt
Is Used to Hold Cubical Particles . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Figure 6.2 Slurry Seal Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
Figure 6.3 Flow Diagram of a Typical Slurry Seal Mixer . . . . . . . . . . . . . . . . . . 45
Figure 6.4 Continuous Laydown Micro-Surfacing Unit . . . . . . . . . . . . . . . . . . . 49
Figure 6.5 Asphalt Distributor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
Figure 6.6 Proper Nozzle Angle Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
Figure 6.7 Spray Bar Height Must Be Set Exactly for Proper Coverage . . . . . . . . 54
Figure 6.8 Tailgate Vane Spreader . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Figure 6.9 Hopper-Type Tailgate Spreader . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Figure 6.10 Truck-Attached Mechanical Spreader . . . . . . . . . . . . . . . . . . . . . . . . 57
Figure 6.11 Self-Propelled Mechanical Spreader . . . . . . . . . . . . . . . . . . . . . . . . 57
Figure 6.12 Pneumatic-Tired Roller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Figure 6.13 Power Sweeper . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Figure 6.14 Surface Treatment Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Figure 6.15 Longitudinal Streaking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Figure 6.16 Bleeding Asphalt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Figure 6.17 Loss of Cover Aggregate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Figure 7.1 Dimensions for Windrow Volume . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Figure 7.2 Road Reclaiming Machine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
Figure 7.3 Travel Plant, Hopper Type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Figure 7.4 Blade Mixing Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
Figure 7.5 Cold-Mix Continuous Plant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
Figure 7.6 Stockpiled Asphalt Emulsion-Rap Maintenance Mix . . . . . . . . . . . . . 79
Figure 8.1 Applying Tack Coat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
Figure 8.2 Using Asphalt Emulsion to Tie Down Mulch . . . . . . . . . . . . . . . . . . 83
Figure 8.3 Completed Section of Interstate Highway With Asphalt Emulsion Mulch
On Median Close-Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
Figure 8.4 Filling a Crack With Asphalt Emulsion . . . . . . . . . . . . . . . . . . . . . . 86
Figure 8.5 Spray-Injection Process – Tack Coat, Completed Patch . . . . . . . . . . . 88
Figure 9.1 Deteriorated Asphalt Pavement and Candidate for Recycling . . . . . . . 92
Figure 9.2 Loss of Curb Height/Reveal and Drainage Capacity . . . . . . . . . . . . . 94

x CONTENTS
List of Figures (Cont.)
Figure 9.3 Cold Planing/Milling Machine Removing Asphalt Pavement . . . . . . . . 95
Figure 9.4 Central/Stationary Plan With RAP Sizing Unit . . . . . . . . . . . . . . . . . . 95
Figure 9.5 Multiple Unit or “Train” for Cold In-Place Recycling . . . . . . . . . . . . . 96
Figure 9.6 Asphalt Pavement Reclaiming Machine Adding Asphalt Emulsion . . . 97
Figure 10.1 Selection of Optimum Emulsion Content –
Open-Graded Aggregate-Asphalt Emulsion Mixture . . . . . . . . . . . . . 105

List of Tables
Table 3.1 Storage Temperatures for Asphalt Emulsions . . . . . . . . . . . . . . . . . . 16
Table 3.2 Guide for Condition of Emptied Tanks Before Loading Asphalt Emulsions
17
Table 3.3 Possible Causes of Contamination of Asphalt Material or Samples
and Suggested Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Table 3.3a Haulers and Hauling Vehicles . . . . . . . . . . . . . . . . . . . 17
Table 3.3b Mixing Plant Storage Tank and Equipment . . . . . . . . . . 18
Table 3.3c Non-Representative or Contaminated Sample . . . . . . . . 18
Table 5.1 General Uses of Asphalt Emulsion . . . . . . . . . . . . . . . . . . . . . . . . . 32
Table 6.1 Asphalt Emulsion Surface Treatments and Seal Coats . . . . . . . . . . . . 38
Table 6.2 Suggested Distributor Spraying Temperatures
For Various Grades of Asphalt Emulsion . . . . . . . . . . . . . . . . . . .. . 39
Table 6.3 Quantities of Asphalt and Aggregate for Single Surface Treatments . . 41
Table 6.4 Quantities of Asphalt and Aggregate for Double Surface Treatment . . 42
Table 6.5 Quantities of Asphalt and Aggregate for Triple Surface Treatment .. . 42
Table 6.6 Quantities of Asphalt and Aggregate for Cape Seal . . . . . . . . . . . .. . 43
Table 6.7 Slurry Seal Aggregate Gradings . . . . . . . . . . . . . . . . . . . . . . . . . .. . 46
Table 6.8 Micro-Surfacing Aggregate Gradings . . . . . . . . . . . . . . . . . . . . . .. . 50
Table 7.1 Major Uses of Asphalt Emulsion Mixtures . . . . . . . . . . . . . . . . . .. . 65
Table 7.2 Aggregates for Dense-Graded Emulsion Mixtures . . . . . . . . . . . . .. . 67
Table 7.3 Aggregates for Open-Graded Emulsion Mixtures . . . . . . . . . . . . .. . 67
Table 7.4 Aggregates for Sand Emulsion Mixtures . . . . . . . . . . . . . . . . . . . .. . 68
Table 7.5 Aggregates Evaluation Procedures . . . . . . . . . . . . . . . . . . . . . . .. . 68
Table 9.1 Materials Evaluation Procedures –
Cold Recycling and Full-Depth Reclamation . . . . . . . . . . . . . . . . . . . 93

CONTENTS xi

You might also like