TANGGAL TRIALMIX 01 Februari 2019

LOKASI TRIALMIX Batching Plant PT. Farika Beton KM19 Tol Jakarta‐Cikampek
3
KOMPOSISI FIBER 6,0 kg/m

a. JOB MIX FORMULA
Class A1 SCC  Class A1 slump  Sumber 
Klasifikasi Mutu Satuan
Flow 50+5 16+2 Material
Slump Cm Flow 50+5 16+2
Semen Kg/m3 495 499 Indocement
3
Air Ltr/m 128 183 PDAM
3
Aggergat Kasar l Kg/m 988 983 Kusumo
Aggregat Halus l Kg/m3 428 357 Bangka
Aggregat Halus ll Kg/m3 405 351 Rumpin
Additive I (BASF) Kg/m3 1,49 1,40 Pozzolith
3
Additive II (BASF) Kg/m 5,94 2,50 Glenium
Kuat Tekan MPa 40 40
Fiber Polypropylene Kg/m3 6,0 6,0 Barchip48

b. Workability Beton
Mutu Slump Rencana Jam Slump Tes Slump Aktual Suhu
50 + 5 16.10 Flow 78 x 74 cm -
Class A1 SCC 
18.10 Flow 70 x 68 cm -
50+5
19.10 Flow 60 x 57 cm -
16 + 2 15.05 16,5 cm -
Class A1 
Slump 16+2

c. Hasil Pengujian Beton


TANGGAL  TANGGAL 
NO MUTU UMUR LOAD (kN) MPa Rata‐Rata % Lokasi Uji
COR TES
1 Class A1 SCC 01-Feb 19-Feb 18 805,265 45,57
43,01 107,5% Puslit-
2 Class A1 SCC 01-Feb 19-Feb 18 724,468 40,46
bang-
3 Class A1 16+2 01-Feb 19-Feb 18 614,768 34,33 jatan
36,45 91,1%
4 Class A1 16+2 01-Feb 19-Feb 18 690,697 38,57
d. Hasil Pengujian Residual Beton

TANGGAL  TANGGAL  Spesifikasi  Spesifikasi 


NO MUTU UMUR f D 600 f
D
Lokasi Uji
COR TES 150
f D 600 f D 150

1 Class A1 SCC 01-Feb 19-Feb 18 3,10 1,98 3,50 2,60 Puslit-


bang-
4 Class A1 SCC 01-Feb 19-Feb 18 3,88 2,51 (28 hari) (28 hari) jatan
RATA-RATA 3,49 2,25
PROSENTASE (%) 99,7% 86,3%

TANGGAL  TANGGAL  D Spesifikasi  Spesifikasi 


NO MUTU UMUR f f D 150 Lokasi Uji
COR TES 600
f D 600 f D 150
1 Class A1 16+2 01-Feb 19-Feb 18 1,50 1,32 3,50 2,60 Puslit-
bang-
2 Class A1 16+2 01-Feb 19-Feb 18 2,87 2,19 (28 hari) (28 hari) jatan
RATA-RATA 2,19 1,76
PROSENTASE (%) 62,4% 67,5%

TANGGAL  TANGGAL  Spesifikasi  Spesifikasi 


NO MUTU UMUR f D 600 f
D
Lokasi Uji
COR TES 150
f D 600 f D 150
1 Class A1 SCC 01-Feb 01-Mar 28 3,65 2,75
2 Class A1 SCC 01-Feb 01-Mar 28 3,50 3,05 3,50 2,60 Puslit-
bang-
3 Class A1 SCC 01-Feb 01-Mar 28 3,40 3,15 jatan
4 Class A1 SCC 01-Feb 01-Mar 28 4,25 4,00 (28 hari) (28 hari)

RATA-RATA 3,70 3,24


PROSENTASE (%) 105,7% 124,5%

TANGGAL  TANGGAL  Spesifikasi  Spesifikasi 


NO MUTU UMUR f D 600 f
D
Lokasi Uji
COR TES 150
f D 600 f D 150
1 Class A1 16+2 01-Feb 01-Mar 28 2,10 1,90 3,50 2,60 Puslit-
bang-
2 Class A1 16+2 01-Feb 01-Mar 28 3,55 3,40 (28 hari) (28 hari) jatan
RATA-RATA 2,83 2,65
PROSENTASE (%) 80,7% 101,9%
LAMPIRAN DOKUMENTASI TRIALMIX DAN PENGUJIAN

Penuangan material fiber ke dalam pan mixer Pengukuran slump flow

Penuangan material fiber ke dalam pan mixer Pengukuran slump 

Job mix formula pada aplikasi batching plant Pembuatan benda uji
LAMPIRAN DOKUMENTASI TRIALMIX DAN PENGUJIAN

Uji residual di lab. Pusjatan, Bandung Uji residual di lab. Pusjatan, Bandung

Uji residual di lab. Pusjatan, Bandung Uji residual di lab. Pusjatan, Bandung

Uji residual di lab. Pusjatan, Bandung Uji kuat tekan di lab. Pusjatan, Bandung