Below is the IEE Report Checklist for Batching Plant Proponents. Read
the questions carefully before answering the space provide. Uses additional
sheets if necessary and indicate this in the appropriate space.
Misleading or erroneous answers are basic for legal actions and/or
ECC.
A. GENERAL INFORMATION
PROJECT LOCATION:
Municipality: Gigaquit
Corner Gen. Maxilom St. & Osmena St., Cebu City, 6000
Telephone: __________________
Fax: _______________________
Email: _____________________
1
B. PROJECT DESCRIPTION
2. a. Capitalization:
Authorized
0
00
0.
00
0,
00
5,
P
2. b. Project Cost:
2. b. 1 Site Development:
00
00
50
0.
0,
2. b. 2 Crashing Plant:
00
00
40
0.
0,
2. b. 3 Building Structures:
00
00
50
0.
0,
4. Project Site: (attach location and vicinity maps and photographs of front, left,
right, and rear views of the project site as ANNEX 2.)
4. a. Land
√ Industrial Residential
2
5. Description of Project Phases
5. a. 3. Facilities Requirements:
5. a. 3. 2 Power Supply
5. b. Operation Phase:
10
ay
ns
/d
to
5. b. 1. Product Capacity/day:
0
3
5. b. 2. Raw materials
5. b. 5. Manpower Requirements
4
No. of Personnel Position
1 Plant Manager
1 Plant Engineers
1 Accountant
1 Stock Clerk/ Checker
3 Laborers/ Workers
4 Drivers
1 Auto Mechanic
1 Security Guard
(Use additional sheet, if necessary.)
5. b. 6. Waste Generated
1. Physical Environment
5
√ Flat or Level (0-3) Level of Undulating (3-8)
_____________________N/A__________________________________.
Saline/sally
2. Ecosystem Description
6
___________________________________________________________
____________________________________________________.
3. Socio-Economic Environment
3.c. Are there health facilities (e.g., clinic, etc.) within the project site? _NO
3.d. Are there required benefits under the Labor Code and other regulation
to be enjoyed by the staff? _____YES__________ if yes, please
enumerate:
1.) SSS Benefits
2.) Pag-ibig Benefits
3.) Philhealth
4.) Yearly Service Incentives provided under the Labor Code of the Phil.
3.f. Are the cultural norms/morals and lifestyle of the local inhabitants to be
affected by the project? _NO_
Please elaborate. ____________________________________________
______________________________.
√
3.g Are there any opposition on the project? No Yes (Attach
document to support the answer as ANNEX 6.)
D. PROJECT IMPACTS
7
Components/ Describe your
Parameters ANSWERS Describe Mitigation/Enhancement
YES NO the impacts measure
Is there land Removal of
clearing √ grass. N/A
8
agencies.
9
Is there air Smoke from standby Provide proper
pollution sources √ generator. maintenance to all
equipment to be operating equipment.
installed?
Are
hazardous/toxic
wastes to be √ N/A N/A
improved in the
environment?
Is there any
pollution complaint √ N/A N/A
from the near by
residents?
Is there an
increase in crime / √ N/A N/A
security concern in
the area?
Others, please
specify.
10
Is there an Economic progress within Uplifting of the living
increase in land √ the area does not increase standard of local
value? the land value. community does not
increase land value.
Is there project
structured affected
or obstruct the √ N/A N/A
view from adjacent
areas?
Is there and
increase in crime/ √ N/A N/A
security concern in
the area?
(Use additional sheet if necessary)
11
the community access road.
Is there any It will generate Local residents will be
increase in the √ employment. priority.
availability of
employment?
Is there an Hired Key employees Only Key employees shall
increase of √ outside the area will be come from other places.
population mobilized in the project.
from
migration?
Is there an Economic progress within Uplifting of the living
increase in √ the area does not increase standard of local
land value? the land value. community does not
increase land value.
Is there
project
structured √ N/A N/A
affected or
obstructs the
view from
adjacent
areas?
Is there an
increase in √ N/A N/A
noise level in
the area?
(Use another sheet if necessary)
12
13
Attach photo, panoramic view of project site and its immediate vicinity
14
Attach photo, front view of the project site
15
Attach photo, front view of the project site
16
Attach photo, panoramic view of project site and its immediate vicinity
17
Attach sketch plan/lay-out of project site
18
Attach drawing/plan of air pollution source and control installation (with dimensions and
description)
19
Attach drawing/plan of air pollution source and control installation (with dimensions and
description)
20
ATTACHMENTS
PERMITS/CLEARANCES ATTACHED?
Demolition Permit N/A
Electrical Permit Attached
Sanitary Permit Attached
Building Permit Attached
Water Rights Permit (NWRB) N/A
PERMITS/CLEARANCES ATTACHED?
Barangay Clearance Attached
DTI/SEC Registration Attached
Safety & Fire Permit Attached
Business/Mayors Permit Attached
PERMITS/CLEARANCES ATTACHED?
Transfer Certificate of Title/Tax Declaration Attached
Colored Photo of the site (different perspective) Attached
Project Vicinity Map/Sketch Attached
Project Lay-out Plan Attached
WTP Plan N/A
PERMITS/CLEARANCES ATTACHED?
Map delineation of primary & secondary impact areas N/A
Endorsement from the LGU (Barangay Certificate) Attached
Construction schedule in chart form Attached
PROPONENT’S COMMITMENTS
21
3. Construct maintenance and properly operate an adequate and appropriate √
treatment facility for your liquid wastes?
10. Pay environmental tax or fee should this be deemed necessary by the √
appropriate authority to maintain an environmental-friendly area?
22
SWORN STATEMENT OF ACCOUNTABILITY OF THE PROPONENT
This is to certify that all the information and commitments in this Initial
Environmental Examination Report of AYL Trading for the Crashing Plant Project are
accurate and complete to the best of our knowledge, and that an objective and thorough
assessment of the Project was taken in accordance with the dictates of professional and
reasonable judgment. Should I learn from any information, which would make this Initial
Environmental Examination Report of AYL Trading inaccurate, I shall immediately bring
the said information to the attention of DENR-EMB.
I hereby bind myself to answer any penalty that may be imposed arising from any
misrepresentation or failure to state material information in this Initial Environmental
Examination Report of AYL Trading.
ALFREDO YU LUA
PROPONENT
Proprietor
AYL TRADING
23
ACCOUNTABILITY STATEMENT
This is to certify that all the information and commitments in the Initial
Environmental Examination (IEE) Report are true, accurate and complete. Should I learn
if any information which would make the IEE inaccurate, I shall bring the said
information the attention of the DENR-EMB Regional Office.
I hereby bind myself for any penalties that may be imposed arising from and
misrepresentations or failure to state material information in the IEE.
ALFREDO YU LUA
Proponent
Proprietor
January 27, 2009
ACKNOWLEDGMENT
WITNESS my hand and seal on the place and date above written.
NOTARY PUBLIC
Doc. No. ____________
Page No. ____________
Book No. ___________
Series of ____________
24