You are on page 1of 22

C

RAY- It envisages a “Slum Free India" with inclusive and equitable cities in which every citizen has access to basic
civic infrastructure and social amenities and decent shelter

Jawaharlal Nehru National Urban Renewal Mission (JnNURM)- a programme meant to improve the quality of life and
infrastructure in the cities. To be replaced by Atal Mission for Rejuvenation and Urban Transformation.
Atal Mission for Rejuvenation and Urban Transformation (AMRUT)- To enable better living and drive economic
growth stressing on the need for people centric urban planning and development.

INDIRA AWAS YOJNA- Food, shelter and cloth are the basic human needs and to have these is the right
of every individual. The Ministry of Rural Development in India looks after the rural development and
takes care of the rural needs. Indira Awaas Yojana (IAY) is one of the many programmes of the
Ministry of Rural Development.

To begin with family living below poverty line used to get Rs 45,000 to construct a house in plain area
and Rs 48,500 to construct house in hilly and difficult area. The financial assistance has been
increased to Rs 70,000 and Rs 75,000 w.e.f. 1st April 2013. IAY beneficiaries can also avail loan of up
to Rs 20,000 to construct a house at an annual interest of 4%.IAY funds can also be allocated to up
grade kuccha houses

PMGSY- Pradhan mantra gram sadak yojna


A gutta (Latin pl. guttae, "drops") is a small water-repelling, cone-shaped projection used in the architrave of the
Doric order in classical architecture. At the top of the architrave blocks, a row of six guttae below the narrow
projection of the taenia (fillet) and cymatium formed an element called a regula.
A

C
munsell color diagram

Lx/Ly<2 one way slab

Lx/Ly>=2 two way slab


fla salb to the left

waffle slab
C- bcs other towns r not as per neighborhood concept

2.5*10=25 for 10 cars

An urban heat island (UHI) is a city or metropolitan area that is significantly warmer than its surrounding rural
areas due to human activities.
C – symmetrical and stable regular shape

B- refer notes

A- Indian planning history notes

D- have to remember

D- vicats plunger. A needle drops on a paste. Depending on amount of penetration, conclusions are drawn.
D- Prevents skidding

Gusst plate wall plate fish plate- rail line

C
B- Knowledge based

C- Building disesase notes

A- Knowledge based

Psychrometric chart section - Knowledge based

B- The name gives the hint. Also refer material towards top of paper.

column free internal structure. Floor slabs suspended inside to outside


A-Knowledge based

B
MARKS TO ALL

The Vierendeel truss/girder is characterized by having only vertical members between the top and bottom
chords and is a statically indeterminate structure. Hence, bending, shear and axial capacity of these
members contribute to the resistance to external loads. The use of this girder enables the footbridge to
span larger distances and present an attractive outlook. However, it suffers from the drawback that the
distribution of stresses is more complicated than normal truss structures
salvacao

stcb delhi

MARKS TO ALL
C

A please refer gestalt theory wiki


C

A- Please review
B

rond point

A bosque (/ˈboʊskɛ/ BOHS-ke) is a gallery forest found along the riparian flood plains of stream and river banks
in the southwestern United States. It derives its name from the Spanish word for woodlands.
D

B
A

B
MARKS TO ALL

A
48-C IT FORCE SHOULD BE MORE TOWARDS THE SIDE AWAY FROM CENTRE. CANNOT BE LESSER THAN HALF WAY BCS
OTHER SIDE IS HEAVIER. CANNOT BE 3W ALSO. THUS REACTION FORCE BETWEEN 1.5 AND 3. HENCE SF ALSO BETWEEN
1.5 AND 3

49-A

VISUALLY DIVIDE BEAM INTO PARTS. AT 1.75 SHOULD BE AT L/16 POINT. NOTHING TO CLACULATE IN THIS SUM. OPTION
B AND D ELIMINATED IMMEDIATELY.
50-B 51- A

PLOT AREA- 500 FAR= 2 BUA= 1000 8 FLOORS 125SQM/FLOOR THUS 25% COVERAGE EASY!

ROOF IS 200SQM AS PER CURRENT BLDNG. RAINS 5CM OR 0.05M

0.05*200=10CUM

300 SQM SITE. 0.05*300 = 15 CUM RAIN

OUT OF 15 SOME WILL BE RUNOFF

10 PAVED ROAD. MEANS 30 SQM IS PAVED, 270 UNPAVED. CALCULATE RUNOFF AND SUBTRACT.

USE FORMULA- A=Sa

R=0.16V/A

52-B 53-C
REFER PREVIOUS PAPERS FOR SOLUTIONS ON NET AND GROSS DENSITY. VERY EASY SIMPLE UNITATRY METHOD SUMS

54- A 55-B

You might also like