You are on page 1of 12

Project: ETAP Page: 1

Location: 16.0.0C Date: 09-21-2019

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: SE01 Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 0 5 6

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 1 0 0 4 0 0 5

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 60.00 Hz

Unit System: Metric

Project Filename: SE01

Output Filename: C:\Users\ELMER\Desktop\PRACTICAS ETAP\FLUJO C1.lfr


Project: ETAP Page: 2

Location: 16.0.0C Date: 09-21-2019

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: SE01 Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: ETAP Page: 3

Location: 16.0.0C Date: 09-21-2019

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: SE01 Config.: Normal

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. kW kvar kW kvar kW kvar kW kvar

Bus1 34.500 1 100.0 0.0

Bus2 0.480 1 100.0 0.0 192.9 105.9

Bus4 0.480 1 100.0 0.0 192.9 105.9

CCM1 0.480 1 100.0 0.0

PAC 34.500 1 102.0 0.0

TGD 0.480 1 100.0 0.0

Total Number of Buses: 6 385.764 211.879 0.000 0.000 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation kvar Limits

ID kV Type Sub-sys % Mag. Angle kW kvar % PF Max Min

PAC 34.500 Swing 1 102.0 0.0

0.000 0.000
Project: ETAP Page: 4

Location: 16.0.0C Date: 09-21-2019

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: SE01 Config.: Normal

Line/Cable Input Data

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

Cable1 0.6MCUN1 400 100.0 0.0 1 75 0.114549 0.095285 0.0005174

Cable2 0.6MCUN1 400 100.0 0.0 1 75 0.114549 0.095285 0.0005174

CableBUS 0.6NCUS1 120 35.0 0.0 1 75 0.187363 0.117278

ACOMETIDA MT 158 500.0 0.0 1 75 0.231000 0.332147 0.0000052

Line / Cable resistances are listed at the specified temperatures.


Project: ETAP Page: 5

Location: 16.0.0C Date: 09-21-2019

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: SE01 Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase kVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 3-Phase 2000.0 34.500 0.480 6.25 6.00 0 0 0 0 0 6.2500 Dyn 0.000


Project: ETAP Page: 6

Location: 16.0.0C Date: 09-21-2019

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: SE01 Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus1 TGD 51.37 308.25 312.50

Cable1 Cable CCM1 Bus2 497.18 413.56 646.70 0.0000119

Cable2 Cable CCM1 Bus4 497.18 413.56 646.70 0.0000119

CableBUS Cable TGD CCM1 284.62 178.16 335.78

ACOMETIDA MT Line PAC Bus1 0.97 1.40 1.70 0.0030666


Project: ETAP Page: 7

Location: 16.0.0C Date: 09-21-2019

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: SE01 Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. kW kvar kW kvar ID kW kvar Amp %PF %Tap

Bus1 34.500 101.993 0.0 0 0 0 0 PAC -397.508 -225.782 7.5 87.0

TGD 397.508 225.782 7.5 87.0

Bus2 0.480 98.190 -0.8 0 0 192.9 105.9 CCM1 -192.882 -105.939 269.6 87.6

Bus4 0.480 98.190 -0.8 0 0 192.9 105.9 CCM1 -192.882 -105.939 269.6 87.6

CCM1 0.480 99.614 -0.7 0 0 0 0 Bus2 195.379 108.005 269.6 87.5

Bus4 195.379 108.005 269.6 87.5

TGD -390.758 -216.010 539.1 87.5

* PAC 34.500 102.000 0.0 397.5 222.6 0 0 Bus1 397.528 222.620 7.5 87.3

TGD 0.480 101.116 -0.6 0 0 0 0 CCM1 396.476 219.589 539.1 87.5

Bus1 -396.476 -219.589 539.1 87.5


* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: ETAP Page: 8

Location: 16.0.0C Date: 09-21-2019

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: SE01 Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp kW kvar kW kvar kW kvar kW kvar kVA % PF Amp Loading

Bus1 34.500 457.155 87.0 7.5

Bus2 0.480 192.882 105.939 220.060 87.6 269.6

Bus4 0.480 192.882 105.939 220.060 87.6 269.6

CCM1 0.480 446.489 87.5 539.1

PAC 34.500 455.618 87.3 7.5

TGD 0.480 453.225 87.5 539.1

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: ETAP Page: 9

Location: 16.0.0C Date: 09-21-2019

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: SE01 Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (kVA) kVA % kVA %

Cable1 Cable 364.80 269.57 73.90

Cable2 Cable 364.80 269.57 73.90

T1 Transformer 1477.0 457.2 31.0 453.2 30.7

* Indicates a branch with operating load exceeding the branch capability.


Project: ETAP Page: 10

Location: 16.0.0C Date: 09-21-2019

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: SE01 Config.: Normal

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID kW kvar kW kvar kW kvar From To in Vmag

ACOMETIDA MT -397.5 -225.8 397.5 222.6 0.0 -3.2 102.0 102.0 0.01

T1 397.5 225.8 -396.5 -219.6 1.0 6.2 102.0 101.1 0.88

Cable1 -192.9 -105.9 195.4 108.0 2.5 2.1 98.2 99.6 1.42

Cable2 -192.9 -105.9 195.4 108.0 2.5 2.1 98.2 99.6 1.42

CableBUS -390.8 -216.0 396.5 219.6 5.7 3.6 99.6 101.1 1.50

11.8 10.7
Project: ETAP Page: 11

Location: 16.0.0C Date: 09-21-2019

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: SE01 Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

PAC Bus Over Voltage 34.500 kV 35.190 102.0 3-Phase


Project: ETAP Page: 12

Location: 16.0.0C Date: 09-21-2019

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: SE01 Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

kW kvar kVA % PF

Source (Swing Buses): 397.5 222.6 455.6 87.25 Lagging

Source (Non-Swing Buses): 0.0 0.0 0.0

Total Demand: 397.5 222.6 455.6 87.25 Lagging

Total Motor Load: 385.8 211.9 440.1 87.65 Lagging

Total Static Load: 0.0 0.0 0.0

Total Constant I Load: 0.0 0.0 0.0

Total Generic Load: 0.0 0.0 0.0

Apparent Losses: 11.8 10.7

System Mismatch: 0.0 0.0

Number of Iterations: 3