Doc No.

STRUCTURAL CALCULATIONS (Proj No)-ST-DSR-0001 r1


(Project Name) .

HALFEN LIFTING ANCHORS .

Reference Docs: Halfen Catalogue - Precast Insert Systems

Consider Lifting of Whole PC Chamber 2.4m x 2m

Length (external) = 2.40


Width (external) = 2.00
Depth(external) = 2.575
Wall thickness = 0.25
Floor Thickness (Av) = 0.262
External volume = = 12.36 m3
Internal volume = = 6.59 m3
Concrete Volume = 5.77 m4
Chamber mass = 138.43 kN
Allow 2 anchors to carry load Load per anchor = 69.2154 kN

Assume angle of lifting rope = 30 degrees


Tension in anchor = 79.9 kN

Transportation Lifting Factor = 1.3 Or Site Erection Lifting Factor 1.5


Anchor Capacity Required = 104 kN Or Rough Site Transport Lifting F

Try Halfen Rd 52 anchor


SWL Capacity = 125 kN Rd 52
Minimum edge distance required = 138 mm 138
Edge distance available = 123 mm

Capacity utilisation = 0.83

This is sufficient to accommodate slight reduction in SWL due to reduced edge distance

Use 4 No. Halfen Rd52 PC8 52880L SS Wavy Tail (125kN SWL)

ALTERNATIVE SOCKETS
Use 4 No. Halfen Rd52 PC8 52880L SS Wavy Tail (125kN SWL)

Use 4 No. Halfen Rd42 PC8 42620L SS Wavy Tail (80kN SWL)

Use 4 No. Halfen Rd36 PC8 36570L SS Wavy Tail (63kN SWL)

Use 4 No. Halfen Rd30 PC8 30450 SS Wavy Tail (40kN SWL)

Use 4 No. Halfen Rd24 PC8 24350 SS Wavy Tail (25kN SWL)

Designed: (Name) Date: xx/xx/20xx


Checked: (Name) Sheet 1 of 2 .
Doc No.
STRUCTURAL CALCULATIONS (Proj No)-ST-DSR-0001 r1
(Project Name) .

Or Site Erection Lifting Factor 1.5


Or Rough Site Transport Lifting Factor 2.0

Rd42 Rd36 Rd30 Rd24


120 100 70 60 mm

Designed: (Name) Date: xx/xx/20xx