Capabilities
60-100 cu.m. per day capacity. Certifications for ISO 9001:2008 Quality Management
System (QMS) and ISO 14001:2004 Environmental Management System (EMS).
FMF SEPTAGE TREATMENT FACILITY IN BAY, LAGUNA
Hydroponics, Centrate
Fish pond/
Edible and Treatment
Aquaponics
Ornamental Bonsai and Tanks
Garden Suiseki stones (submerged)
Sludge
Composting Septage Receiving
Sludge Facility
Holding Tank
Sludge
Dewatering
Motorpool
Guardhouse
Certifications for ISO 9001:2008 Quality Management System (QMS) and ISO
14001:2004 Environmental Management System (EMS).
Features:
Fully Automated low manpower, overhead
Compact 800sqm ++
Modular/Expandable/Transportable 80m3/day +++
Non-clog Belt Screens double, Asianized
No Nuisance noise, pests, etc.
No Odor
Lower Energy and Chemical Use
Smaller Footprint, Lower O & M
Reuse
Fast and Easy Installation 2 weeks
“Franchised” Training & Operations Manuals
Profitable & Sustainable
Desludging Truck (Vacuum Tanker, 10 cm cap with 300m suction hose)
Septage Reception Facility (SRF)
Fully mechanized, sealed metal chute and conveyor system, equipped with series of
belt screens for removal of coarse solids to fine debris
Septage Reception Facility: Belt screens
NO OPENING OF
SCREENS
(No Odor)
NO RAKING
Sludge Holding Tank
Polymer Dosing
To promote coagulation and better separation of suspended solids
Sludge Dewatering Unit
Centrifuge Decanter
Separates the biosolids from the liquid portion or centrate
8 to 12m3/hour capacity
300-400 kg of dry solids/hr max. capacity
25-28% dryness is achieved
Centrate Treatment : Secondary Treatment
FRP tank equipped with a Membrane Filtration System and Ultra Violet Light which further
cleans and clarifies the treated effluent, resulting in an effluent quality fit as re-use water (for
gardening, washing of vacuum trucks) or for discharge into nature.
Treated Effluent for Re-use (Fishpond, Watering, etc.)
Conveyor from
sludge
dewatering unit
Organic wastes from screenings at reception and sludge biosolids from dewatering
undergo composting with a biocatalyst to convert to soil conditioner or organic fertilizer
End Products
LLDA
RESOLUTION
IMPOSING
PENALTIES OF
PHP 10,000 –
PHP
200,000/DAY
AND/OR
IMPRISONMENT
OF 2 – 6 YEARS
HOW TO IMPLEMENT A SEPTAGE MANAGEMENT PROGRAM (SMP)
• FEASIBILITY STUDIES
- USAID-PWRF updating
- Funding: DOH, DENR, DBP, DPWH, PRIVATE, IGF
- In-House or Outsource
• CITY/MUNICIPAL/PROVINCIAL ORDINANCES
- Mandatory desludging
- Penalty provisions for non-compliance
- WD and/or Private Sector as possible implementors
- MOA between LGU and WD on Implementation
- MOA between LGUs on Clustering
• MODALITY
- Supply, Install, Commissioning & Process Proving
- Joint Venture between WD and Private Sector
- Service Contract
ORDINANCE (MANDATORY DESLUDGING)
ORDINANCE (PENALTY PROVISIONS)
ORDINANCE (PRIVATE SECTOR)
ORDINANCE IRR (MOA WD & LGU, LOT & ROW)
MOA BETWEEN LGUs
PROPOSED MEASURES
• DILG and Provincial Governments to issue Administrative
Orders to all LGUs to enact ordinances immediately
implementing the CWA and Septage Management Program
and have MOAs clustering smaller neighboring towns