You are on page 1of 22

Laporan Kegiatan

MT. Asike I & MV. Vision Global


Di Jetty KIAS & Siam Maspion Gresik
19 – 26 September 2019

Levy Alfian/Elect. Superintendent


1. INSTALL VESSEL TRACKING SYSTEM MT.ASIKE I
Pemasangan unit, penarikan kabel, pengetesan unit dan pengaktifan Marine Vessel
Tracking OrbComm.

Dokumentasi:

Display marine Tracking System.


Now still red means inactive
Blinking 12 times means
system is working

Lokasi Pemasangan Unit Vessel Tracking


Di Top Deck

Sambungan Kabel 24VDC Power Suply


2. PERBAIKAN INSULATION FAULT MT.ASIKE I
Pengecekan dan perbaikan insulation fault pada panel transformator 440/220VAC.

Dokumentasi:

Batas Maksimum

Batas Normal

Insulation fault. Indikator Indikator Resistance Pada Breaker Transformator


resistance naik . Panel Transformator 440/220 VAC

Resistansi sudah Resistance Monitor berwarna


normal hijau berarti Normal
3. PERBAIKANN SPEED LOG EMLOG LT201 MT.ASIKE I
Pengecekan dan perbaikan kerusakan Master Unit Speed Log.

Dokumentasi:

X V

Error Master Unit Indikator Fail Master Unit Sudah berfungsi


terus menyala normal

Connection terminal Master Unit Speed Log


4. PENGECEKAN CCTV & WIFI MT.ASIKE I
Pengecekan trouble CCTV yang offline/ tidak aktif.

Dokumentasi:
CCTV Port

LED Aktif Ketika ada pergerakan LED Mati ketika tidak ada

CCTV Starboard

LED Aktif Ketika Ada Pergerakan LED Mati ketika tidak ada pergerakan

Wifi Kapal
5. PENGECEKAN THERMOCONTROLLER ASIKE I
Pengecekan installasi dan setting Thermo Controller Autonics untuk Heater MFO SERV.

Dokumentasi:

Panel Heater Setting set point 110’Celcius


6. PENGECEKAN RADAR JRC JMA-7252-6 MT.ASIKE I
Pengecekan dan function test Radar JRC diketahui magnetron sudah lemah.

Dokumentasi

Gain Echo sudah lemah Karena


Magnetron sudah hamper habis
masa lifetime

Function Self Test Indikasi Normal

Tipe Magnetron M1437(A)


7. PENGECEKAN RADAR FURUNO MT.ASIKE I
Pengecekan dan function test Radar JRC.

Dokumentasi:

Semua indicator sesuai. Menunjukkan


system berfungsi normal

TX Time tidak di-reset saat


pergantian magnetron sebelumnya

GPS Interface

Gyro Interface kosong

AIS Interface
8. PENGECEKAN ALARM ENGINE ROOM
Pengecekan dan analisa kerusakan alarm unit engine room.

Dokumentasi:

Function Test Alarm

Terminal Koneksi

Bell Alarm 24VDC


Mengalami keruskaan
9. PENGECEKAN/SURVEY PIPE STEAM LINE & BALLAST TANK NO.2 MT.ASIKE I

Dokumentasi:
Ballast Tank No.2

Steam Pipe Line


10. SURVEY DECK AKOMODASI MT. ASIKE I
Survey space di deck akomodasi, sekitar funnel dan steering gear room.

Dokumentasi:
DOKUMEN ROOM

SALON ROOM
FUNNEL

STEERING GEAR
11. INSTALL VESSEL TRACKING SYSTEM MV.VISION GLOBAL
Pemasangan unit Vessel Tracking Orbcomm.

Dokumentasi:

Display Mitsui Marine Tracking System


LED Blinking 12 Tmes For
First Turning ON.

Batery For Power 24VDC


12. PERBAIKAN RADIO SSB SRG-1150DN MV.VISION GLOBAL
Pengecekan dan perbaikan kerusakan Exciter Radio SSB.

Dokumentasi:

Kerusakan Exciter Error

Setelah Perbaikan semua


Indikator Good

Proses Perbaikan Test Tx/Rx


13. PERBAIKAN BNWAS MV.VISION GLOBAL
Pengecekan, pengetesan dan analisa kerusakan Alarm BNWAS.

Dokumentasi:

Proses Pengecekan Baru


sampai Off. Deck

Proses Analisa Kerusakan


14. PERBAIKAN WEATHER FAX MV.VISION GLOBAL
Pengecekan dan analisa kerusakan Weather Fax MV.Vision Global.

Dokumentasi:
Power ON hanya indicator LED yang
menyala. Tapi LCD Mati.

Proses Perbaikan Butuh Part Batery 3,6 V Li.


15. PENGECEKAN/SURVEY DERRICK WIRE ROPE CONDITION MV.VISION GLOBAL
Cek kondisi wire yang damaged dan tanpa kekurangan Grease di semua derrick kapal.

Dokumentasi:
16. PENGECEKAN RADAR MV.VISION GLOBAL
Self test system radar MV.Vision Global dengan hasil Good.

Dokumentasi:

Transmitt Test Radar

Function Test Radar