This document provides a list drawing of hydraulic structure project drawings for August 6th, 2019. It includes 7 drawings related to site preparation, ponds, overflow pond details, river and creek relocation plans and sections. The latest revision dates range from March to June 2019 and all drawings are marked as received for the advanced functional component and intermediate functional component stages.
This document provides a list drawing of hydraulic structure project drawings for August 6th, 2019. It includes 7 drawings related to site preparation, ponds, overflow pond details, river and creek relocation plans and sections. The latest revision dates range from March to June 2019 and all drawings are marked as received for the advanced functional component and intermediate functional component stages.
This document provides a list drawing of hydraulic structure project drawings for August 6th, 2019. It includes 7 drawings related to site preparation, ponds, overflow pond details, river and creek relocation plans and sections. The latest revision dates range from March to June 2019 and all drawings are marked as received for the advanced functional component and intermediate functional component stages.