You are on page 1of 22

` PROPOSED SETUP FOR CHIEF ENGINEER (CIVIL) WATER RES

UNDER GENERAL MANAGER (HYDRO PLANN


Pre-Feasibility Study of Hydropower Projects

Office Setup of Chief Engineer (Civil)


Water Resources Projects
Nomenclature of the
Employee Name
post
Chief Engineer
Dy Director / TO
Steno- G-I/ APS Javed Iqbal Bhatti
Muhammad Din
Naib Qasid
Siddique Masih
Total :

Pre-Feasibility Section

Nomenclature of the
Name Of Empolyee
post

Director (Civil) Dy Director (Civil)


Ijaz Ahmed Bhatti
Water Resource Projects Muhammad Kashif Sheikh
Nomenclature of the Jawwad Farhat Siddiqui
Name Of Empolyee No of Post Jr. Engineer (Civil)
post Muhammad Anwar
The post may be downgraded as
ARO (Economics) as the Pay of
Director (Civil) Muhammad Azam 1 R.O (Hydrology)
Miss Shela Ijaz ARO is being
charged.

Steno- G-I/ APS Muhammad Naseem 1 H. D/Man Arshad Wahab


Naib Qasid M. Ashraf D. Man Autocad Imtiaz Ahmed
1
Imtiaz Ahmed Zain-ul-Abedin
Total : 3 Steno- G-II Syed Aqeel Raza
Tracer (GT Sheets) Hameed Khan
Naimut ullah
Jr.Clerk/Com Typist Shahid Mehmood
Naib Qasid Muhammad Usman
Admn Section
Imran Rasheed
Nomenclature of the Qadir Bukhsh
Name Of Empolyee No of Post
post Common Service
Astt. Director (Admin) Muhammad Ashraf 1 SDO (CS) Masood Ahmad
Sr. Superintendent Mian Azhar Iqbal 1 Sub Engineer Muhammad Bilal Gill
Miss Atiqa Prveen Telephone Operator M. Usman Jameel
Assistant 2
Muhammad Arshad Naib Qasid Muhammad Akthar
Senior Clerk Muhammad Idrees 1 Chowkidar Ghulam Muhammad
Naveed Abbas Imran Khan
Jr.Clerk Asif Ali 3 Sanitary Worker Muhammad Zaman
Jalal Arif Anderyas
Naib Qasid M.Jamil (Dak Runner) Total:
2
Fazal Bari
Total : 10

Accounts Section

Nomenclature of the
Name Of Empolyee No of Post
post
B&AO Vacant 1
AB&AO Muhammad Aslam 1
Account Asst/Cashier M. Adeel Khan 2
Yasir Ashfaque
Jr.Clarck M Bilal Zulfiqar 1
Naib Qasid Muhammad Ashiq 1
Total : 6

Summary

Year Posts
2015-16 104
2016-17 95
2017-18 81

Note:
1. The post of CE-II may be re-designated as Chief
Engineer (Civil) Water Resource Projects.

2. The post of AD (Admin) is proposed to be shifted


from Admin Section of GM (HP) to CE Water Resource
Projects.

3. Driver for each fit and road worthy vehicle.


EER (CIVIL) WATER RESOURCES PROJECTS
NAGER (HYDRO PLANNING)
dy of Hydropower Projects

tup of Chief Engineer (Civil)


ter Resources Projects
No of Post

1
1
1
1
1
5

re-Feasibility Section

No of Post

2 Geotech.Section Lahore

Nomenclature of the
2 Name Of Empolyee No of Post
post

1 Sr.Eng (Civil) Abdul Manan Shaikh 1

1 Ghulam Abbas Bhatti


Jr. Engineer (Civil) 2
Ubaid Ullah
1
Muhammad Shahbaz Gull
1 Sub Engineer. Basit Mahmood 3
2 Amjad Nisar
Assistant Mr. Naeem 1
1 Sr. Clerk Amir Sharif 1
3 Jr. Clerk/Typist Muhammad Awais 1
Driller-A Mian M Saleem Akhtar 1
Jangraiz Khan
Driller-B 2
Muhammad Imran
1 Amer islam
Jr. Store keeper 1
1 Hafiz Arshad Ali
1 Muhammad Ali
1 Fitter-II Muhammad Javed 3
1 Ghaus Muhammad
Imtiaz Hussain
1 Mehboob Hussain Naqvi
Surveyor Naveed Ahmed 5
20 Ghulam Mustafa
Adnan Ali
Fitter -III / Well Borer Waseem Bari 1
Rab Nawaz
Fitter Cooly 2
Muhammad Shafi
M. Bilal Iqbal
Naib Qasid 2
Khalid Mehmood
M.Ramzan (Sargodha Store)
Waqar Ali (Sargodha Store)
Chowkidar Rab Nawaz (Lawrencpr Store) 5
M. Farid (Lawrancepur Store)
Gul Zaib (Lawrancepur Store)
Total : 31
Geology Section

Nomenclature of the
Name Of Empolyee No of Post
post

Sr. Hydrogeologist Shamoun Arslan Javaid 1

Sr. Geologist Mudassar Iqbal 1


Jr. Hydrogeologist Asad Abbas Zaidi
1
Jr. Geologist Asif Ali Bhatti 1
Sarfaraz Hussain
Naib Qasid 2
Mubashir Ali Shah
Total 6
`
Chief Engineer - II (Hyd
Feasibility Study and Detailed Engineering

Office Setup Chief Engineer-ll


Nomenclature of the
Empolyee Name No of Post
post
Chief Engineer - II Aijaz Ahmed Pitafi 1
APS/Steno G-l Javed Akhtar 1 Directo
Qasid Muhammad Rafi 1 Water Resou
Total : 3 Nomenclature of the
post
Addl:Chief Eng
Steno- G-I/ APS
Technical Review Section
Naib Qasid
Nomenclature of the Total
Name Of Empolyee No of Post
post
Dy. Dir (Civil) Saqib Jahangir 2
Vacant
ADE/Jr. Engr (Civil) M Tajammal Khan 1
Sub Engr (Civil). CT Tanveer Ashraf Malik 1 Pre-Feasib
Assistant M Usman Sohail 1
Nomenclature of the
DraftsMan Sibtain Akhtar 1 post

PPC Oper Hafiz Saleem Ullah 1 Dy Director (Civil)


Naib Qasid Muhammad Amin 2
Muhammad Sajid Jr. Engineer (Civil)
Total : 9

R.O (Hydrology)

Steno G-II
Feasibility Study Section
H. D/Man
Nomenclature of the D. Man Autocad
Name Of Empolyee No of Post
post
Director (Civil) Nazakat Hussain 1 Tracer (GT Sheets)
Dy. Director Anees-ur-Rehman 3 Jr.Clerk/Com Typist
Shahzad yousif Naib Qasid
M Imran Frooq
Sr. Geophysicist Khurram Abbas 1
Jr. Geophysicist Sahib Khan 1 Common Service
Jr. Engineer (Civil) M. Junaid Ghauri 3 SDO (CS)
Vacant Sub Engin eer
Vacant Naib Qasid
AutoCAD D/Man Azeem Akhtar 2 Chowkidar
Mazhar Ali Jaffari Chowkidar
APS Muhammad Naseem 1 Sanitary Worker
Steno G-II Vacant 1 Total:
Sr. Clerk Muhammad Idress 1
Jr. Ck/Comp Typist Ashfaq Ahmed 1
Naib Qasid Muhammad Younas 3
Mushtaq Ali
Geotech.Se
Tafseer Ahmed
Total : 18 Nomenclature of the
post
Dy Dir/Sr.Eng (Civil)
Sr. Hydrogeologist
Sr. Geophyscist
Chief Engineer/PD WMSC
Sr. Geologist
Nomenclature of the Jr. Hydrogeologist
Name Of Empolyee No of Post
post Jr. Engineer (Civil)
RO (Hydraulics) Iftikhar Ahmed Virk 3
Ibrar Ahmed Sheikh Jr. Geologist
Khalid Mahmood
ARO (Hydraulics) Sana Ullah 2 Sub Engineer.
Vacant
ARO (SWH) Vacant 1 Assistant
Accts Asstt Muhammad Ahmad 1 Sr. Clerk
Sub Engineer Sulman vicky 1 Jr. Clerk/Typist
Research Asstt Vacant 1 Driller-A
Silt Observer Abdul Razzaq 1 Driller-B
Naib Qasid Hafiz Muhammad Kamran 1
Total : 11 Jr. Store keeper

Fitter-II
Admn Section Fitter -III / Well Borer

Nomenclature of the Fitter Cooly


Name Of Empolyee No of Post
post

A.D (Admn) Muhammad Ashraf 1 Naib Qasid


Sr.Supdt Toqueer Hussain 1
Assistant Muhammad Israeel Imran 1
Steno Gr-ll Asghar Ali 1
Sr.Clerk Saadat Hussain 1 Chowkidar
Jr.Clerk Muhammad Islam 1
Naib Qasid Suleman Mehmood 2
Shah Muhammad (Dak Runer)
Chowkidar M.Tahir 2
M.Waqas Sanitary Worker
Haroon Masood Total :
Sanitary Worker Ijaz Gill 1
Total 11

Accounts Section
Nomenclature of the
Name Of Empolyee No of Post
post
B&AO Shahid Mehmood 1
AB&AO Wasi ur Rehman 1
Account Asst/Cashier Khalid Mahmood
2
Muhammad Riaz
Jr.Clarck Fayyaz Ahmed 1
Naib Qasid Kamran Moeen Gul 1
Total : 6
ngineer - II (Hydro Planning)
ailed Engineering Design of Hydropower Projects

Director (Civil)
Water Resource Projects
Name Of Empolyee No of Post

Muhammad Azam 1
Javed Iqbal Bhatti 1
Muhammad Din 1
Total 3

Pre-Feasibility Section Admin Section

Nomenclature of the
Name Of Empolyee No of Post Name Of Empolyee No of Post
post

Ijaz Ahmed Bhatti 2 Sr. Superintendent Mian Azhar Iqbal 1


Muhammad Kashif Sheikh Ass. Head Clerk Miss Atiqa Prveen 1
Jawad Farhat Siddiqui 3 Senior Clerk M.Amir Sharif 1
Muhammad Anwar Jr.Clarck Naveed Abbas 2
Saqib Habib Jalal Arif
Pay of Miss Shela Ijaz 1 Naib Qasid M.Jamil (Dak Runer) 2
ARO is being Charge Fazal Bari
Vacant 1 Total : 7
Arshad Wahab 1
Imtiaz Ahmed 2
Zain-ul-Abedin
Hammed Khan 1
Accounts Section
Shahid Mehmood 1
Muhammad Usman 3 Nomenclature of the
Name Of Empolyee No of Post
Imran Rasheed post
Qadir Bukhsh B&AO Vacant 1
AB&AO Muhammad Aslam 1
Masood Ahmad 1 Account Asst/Cashier Najam ul Din 2
Muhammad Bilal Gill 1 Yasir Ashfique
Muhammad Akthar 1 Jr.Clarck M Bilal Zulfiqar 1
Ghulam Muhammad 1 Naib Qasid Muhammad Ashiq 1
Muhammad Imran 1 Total 6
Muhammad Zaman 1
Total: 21

Survey Division Faisalabad


Nomenclature of the
Geotech.Section Lahore post
Name Of Empolyee No of Post

Dy Dir/Sr.Eng (Civil) Vacant 1


Name Of Empolyee No of Post
Jr. Engineer Ubadullah 1
Abdul Manan Shaikh 1 AB&O - 1
Muhammad Tahir Jawad 1 Account Assistant Muhammad Toheed 1
Zahid Raza 1 Sub Engineer (Civil) Basit Mahmood 1
Mudassar Iqbal 1 Assistant Muhammad Arshad 1
Asad Abbas Zaidi 1 Steno G-II Vacant 1
Ghulam Abbas Bhatti 2 Jr. Clerk Shoukat Hayat 1
Ubaid Ullah Memon Surveyor Imtiaz Hussain 6
Mehboob Hussain
Asif Ali Bhatti 2
Naqvi
Sidra Azam Naveed Ahmed
Muhammad Shahbaz Gu 2 Ghulam Mustafa
Sultan Mehmood
Amjad Nisar
( D.O.R.13.10.17)
Karim Shah 1 Adnan Ali
Abdul Rauf 1 Naib Qasid Muhammad Ashraf 2
Muhammad Awais 1 Imtiaz Ahmed
Mian Muhammad
1 Chowkidar Muhammad Amin 2
Saleem Akhtar
Jangraiz Khan 2 Naseer Ahmad
Muhammad Imran Sanitary Worker Ashraf Masih 1
Amer islam 2 Total 19
Hafiz Arshad Ali
M Ayub ( D.O.R.30.9.17 3
Muhammad Javed
Ghaus Muhammad
Waseem Bari 1
Rab Nawaz 2

Muhammad Shafi
Balil Iqbal 4
Khalid Mehmood
Sarfar Hussain
Muhammad Ali
M.Ramzan (Sargodha St 5
Waqar Ali (Sargodha Store)
Rab Nawaz (Lawrancepur Store
M. Farid (Lawrancepur Store)
Gul Zaib (Lawrancepur Store)
Ilyas Masih 1
Total : 35
General Manager (Planning) Water

Management of Planning (Water) Organization

Admn. Section Technical Section Accounts Section


Combined Combined
Combined
Sanction of Sanction of
Proposed (-) Surrendered/ Sanction of Proposed (-) Surrendered/ Proposed (-) Surrendered/
Positions GM(P)W & Positions Positions GM(P)W &
2015-16 (+) Additional GM(P)W & CE-II 2015-16 (+) Additional 2015-16 (+) Additional
CE-II CE-II
2014-15
2014-15 2014-15

DD(Admn) 0 1 1 General Manager 1 1 0 Sr. B&AO 1 1 0


AD (Admn) 2 1 -1 Director (Technical) 1 1 0 B&AO 3 2 -1
Sr. Supdt. (Admn) 2 2 0 Dy. Dir (Technical) 1 1 0 AB&AO 5 4 -1
Steno G-II 1 1 0 ADE/JE. (Civil) 0 1 1 Supdt. (B) 1 1 0
Sr. Clerk 4 4 0 APS/ Steno 1 2 0 Steno-II 2 1 -1
Jr. Clerk/ typist 8 7 -1 Steno-II 1 1 0 Asst. (B) 1 1 0
Assistant 4 4 0 Assistant 0 1 1 Acct. Asst. 12 10 -2
PPC Operator 2 2 0 Librarian 1 1 0 Cashier 3 1 -2
Naib Qasid 5 5 0 Jr. Clerk/Typist 3 3 0 Jr. Clerk/Typist 4 4 0
Qasid/Naib Qasid 1 3 2 Naib Qasid 5 5 0
Total 10 15 4
Notes: Total 37 30 -7
- One (01) post of Jr. Engr from D-I section transferred to Director (Tech) Notes:
-One (01) B&AO surrendered
- Director (Tech)
O/O CE-II shifted/attached with GM(P)W
- One (01) Naib Qasid transferred from D-I -One (01) No. AB&AO surrendered
Total 28 27 -1 - Two (02) NO. Jr. Clerks detached from Admn Section CE-II and attached
with Technical Section GM.
Notes: - One post of Assistant transfered from CE-II Division (Dadu) -Two (02) No.
-01 No. Sr. Geologist from Dir. F&G recommended for redesignation as
DD(Admn) Acct.Asst. surrendered

- One (01) No. AD(Admn) surrendered. Dy Dir. Coord & Liaison, GB -One (01) No. Cashier detached and added in
- One Steno G-II surrendered from CE-II, adjusted against existing
vaccancy the strength of Drilling Division
Sanctioned Proposed (-) Surrendered/ (+) -One (01) No. Cashier detached and added in the strength of Survey
Positions
2014-15 2015-16 Additional Division, Peshawar
Dy. Director 1 1 0
Jr. Engineer (Civil) 1 1 0
Sub Engineer 1 1 0
AB&AO 1 1 0
Asst/Head Clerk 1 1 0
Surveyor 1 1 0
Cashier 1 1 0
Jr. Clerk/Typist 1 1 0
Naib Qasid 2 2 0
Chowkidar 2 2 0
Total 12 12 0
Chief Engineer - I (Planning) Water

Feasibility Study and Detailed Engineering Design Alongwith Approvals of PC-I's and supervision of E &M
for Planning of Hydropower Projects

Director -I Director -II Director (E &M


Sanctioned Proposed (-) Surrendered/ (+) Sanctioned Proposed (-) Surrendered/ (+) Sanctioned
Director-I Positions Positions
2014-15 2015-16 Additional 2014-15 2015-16 Additional 2014-15

Director (Civil) 1 1 0 Director (Civil) 1 1 0 Director (E &M) 1


Dy. Dir (Civil) 5 4 -1 Dy. Director (Civil) 3 3 0 Dy. Dir (Mech) 1
Jr. Economist/RO 1 1 0 Dy. Dir.(Env) 1 1 0 Dy. Dir(Elec) 1
ADE (Civil) 8 4 -4 Dy. Dir. (Hyd) 1 1 0 ADE(Elec) 2
Steno G-I/APS 1 1 0 RO (Hyd) 2 1 -1 ADE((Mech) 2
Steno G-II 1 0 -1 ADE(Civil) 4 4 0 Asst. Comp. Prg. 1
CHD 1 1 0 ARO (Eco) 1 1 0 Steno G-I/ APS 1
Draftsman 1 1 0 ARO(Stats/Hyd) 1 1 0 Steno G-II 1
Tracer 2 2 0 Steno G-I/APS 1 0 -1 Asst. 1
Sr. Clerk 1 1 0 Steno G-II 1 1 0 Draftsman 2
Naib Qasid 7 5 -2 Research Asst. 2 - -2 Tracer 1
Tracer 1 1 0 Naib Qasid 6
Sr. Clerk 1 1 0 Total 20
Head Draftsman 1 1 0 Note:
Naib Qasid 3 5 0 - One Naib Qasid Detached from Dir (E&M) and a
Total 29 21 -8 Total 24 22 -4
Notes:
- 01 ADE(Civil) and One(01) No. Naib Qasid detached from D-I and Added in the Notes:
strength of Director (Tech) - One No. Naib Qasid Shifted from Dir(E &M) and Dir-I, each
- Two (02) No. ADE - Two post of research asstt surrendered.
(Civil) surrendered during annual review of staff 2015-16. - One post of RO (Hydrology) and Steno G-II surrendered
-One Naib Qasid Detached from D-I
and Attached with D-II
- One No. ADE(Civil) detached from D-I and Shifted to Chief-I

Drilling Division Survey Division, Peshawar Common Service S


Sanctioned
Sanction Proposed (-) Surrendered/ (+) Sanctioned Proposed (-) Surrendered/ (+)
Positions Positions Positions
2014-15 2015-16 Additional 2014-2015 2015-16 Additional
2014-15
XEN 1 1 0 XEN (T&M) 1 1 0 Jr. Engineer (Civil) 1
SDO 2 2 0 SDO 2 2 0 Sub Engineer (M/C) 2
Sub Engr. (Civil) 5 3 -2 Sub Engineer 4 2 -2 Sr. Storekeeper 1
Draftsman 1 1 0 Surveyor 16 12 -4 Jr. Clerk 1
Head Clerk 1 1 0 Draftsman 1 1 0 Electrician 1
Sr. Clerk 1 1 0 Head Clerk 1 1 0 Telephone Operator 2
Jr. Clerk/Typist 1 1 0 Senior Clerk 1 1 0 Naib Qasid 1
Steno G-II 1 0 -1 Junior Clerk/Typist 1 1 0 Chowkidar 4
Driller Gr-A 6 3 -3 Naib Qasid 3 5 2 Sanitory Worker 3
Driller Gr-B 4 3 -1 Asst. B&AO 1 1 0 Total 16
Fillter Gr.-I 2 2 0 Store Colley 1 1 0
Notes:
Fitter Gr. -II 3 3 0 Accts. Assistant 0 1 1 One post of Sub Engr. is surrendered from CE-II,
Fitter Gr-III 5 3 -2 existing vaccant post of Sub Engr. (Mechanical). O
surrendered.
Sr. Store Keeper 1 1 0
Jr. Store Keeper 1 0 -1 Total 32 29 -3
Naib Qasid 3 3 0 Notes:
Fitter Colley/Pump C 2 2 0 06 No. Surveyors and 02 No. N. Qasid detached from O/O P & I Peshawar and Added
in the strength of XEN T & M Division
Chowkidar 5 6 1 02 No. Surveyors Surrendered
Sanitary Worker 1 1 0 02 Sub Engrs. Surrenderd
AB &AO 1 1 0 02 N.Qasid added from CE-II Survey Divison
Accts. Assistant 0 1 1
Total 47 39 -8

Notes:
-One No. Post of Jr. Store keeper Surrendered.
- One Steno G-II Surrendered
- 03 No. Driller Grade A and 01 No. Driller Grade B Surrendered
- 02 no. Fitter Grade III Surrendered
- One Accts. Assistant/ Cashier added from CE-II
r - I (Planning) Water

ngwith Approvals of PC-I's and supervision of E &M Section


Hydropower Projects

Director (E &M) Technical Staff


Proposed (-) Surrendered/ (+) Proposed
Positions
2015-16 Additional 2015-16

1 0 Chief Engineer (Civil) 1


1 0 ADE (Civil) 1
1 0 Sr. Supdt. (W) 1
2 0 Sr. Clerk 1
2 0 APS 1
1 0 Naib Qasid 2
1 0
1 0
1 0
2 0
1 0
5 -1 Total
Note: 7
19 -1 one post of Jr. Engr (Civil) transferred
Note: from
- One Naib Qasid Detached from Dir (E&M) and attached with D-II D-I Section

Common Service Section

Proposed (-) Surrendered/ (+)


2015-16 Additional
1 0
2 0
1 0
1 0
1 0
2 0
1 0
4 0
3 0
16 0
Notes:
One post of Sub Engr. is surrendered from CE-II, incumbent will adjusted against
existing vaccant post of Sub Engr. (Mechanical). One AC Foreman is
surrendered.
Chief Engineer - II (Planning) Water

Site identification, Reconnaissance/ Pre-Feasibility Study of Hydropower Projects

Director Investigation Director Planning Director Geology


Existing Proposed (-) Surrendered/ Existing Proposed (-) Surrendered/ Existing Proposed (-) Surrendered/
Positions Positions Positions
2014-15 2015-16 (+) Additional 2014-15 2015-16 (+) Additional 2014-15 2015-16 (+) Additional

Director 1 1 0 Director 1 1 0 Director 1 1 0


Dy. Dir (Civil) 2 3 1 Dy. Director 3 3 0 Sr: Geologist 5 4 -1
Sr. Geologist 1 0 -1 Sr. Geophysicist 1 1 0 Jr: Geologist 4 7 3
Sr. Agronomist 1 1 0 ADE/JE. (Civil) 4 4 0 Steno- I / APS 1 1 0
AD/JE. (Civil) 4 4 0 Jr. Geophysicist 1 1 0 Steno- II 1 1 0
Jr. Geologist 3 0 -3 AutoCAD D/Man 2 2 0 Assistant 1 1 0
Jr. Economist 1 1 0 Steno G-II 3 2 -1 Head Draftsman 1 1 0
R.O (Hydrology) 1 1 0 Quantity Surveyor 1 1 0 Field Inspector 2 1 -1
R.O. (Soil) 1 1 0 Sr. Clerk 1 1 0 Naib Qasid 3 3 0
Steno- G-I/ APS 1 1 0 Jr. Clerk/ Comp. Oprtr 1 1 0
Steno G-II 4 3 -1 Naib Qasid 3 4 1
Sub Engineer 1 1 0 Total 21 21 0 Total 19 20 1
Head Draftsman 1 1 0 Notes (posts/incumbants surrendered/ reajdusted): Notes (posts/incumbants surrendered/ reajdusted):
D. Man Autocad 2 2 0 01 Steno G-II shifted to Tech Section CE-II 01 No. Sr. Geologist may be re designated as DD Admn under
Data Entry Operator 1 0 -1 GM(P)W
Tracer 1 1 0
Jr. Clerk 1 1 0
P.P.C.M.O 1 1 0

Naib Qasid 8 5 -3 Geotech. Division Survey Division, Faisalabad


Total 36 28 -8
Notes (posts/incumbants surrendered/ reajdusted): Existing Proposed (-) Surrendered/ Existing Proposed (-) Surrendered/
Positions Positions
01 Sr. & 03 Jr. Geologists are shifted to Director Geology 2014-15 2015-16 (+) Additional 2014-15 2015-16 (+) Additional
01 Steno G-II may be redesignated as Sr. Clerk and shifted to Director
Sr. Engineer/ XEN 2 1 -1 XEN 3 1 -2
Planning
02 N.Qasid shifted to XEN Geotech Section. Sr. Hydrogeologist 1 1 0 Jr. Engineer 3 2 -1
01 N. Qasid shifetd to Director Planning. Sr. Geophyscist 1 1 0 Sub Engineer 3 2 -1
Jr. Hydrogeologist 1 1 0 AB&AO 2 1 -1
Jr. Engineer. 3 2 -1 Accts. Asstt 3 1 -2
Sub Engineer. 3 2 -1 Steno G-II 3 1 -2
AB&AO 0 1 1 H. Clerk/Asstt 3 1 -2
Sr. Clerk 0 1 1 Sr. Clerk 1 1 0
Accts. Asstt/ Cashier 0 1 1 Jr. Clerk Accts 1 0 -1
H. Clerk/Asstt 0 1 1 Jr. Clerk 2 1 -1
Steno G-II 2 1 -1 Surveyor 17 8 -9
Jr. Clerk/Typist 2 2 0 Sanitary Worker 2 1 -1
Driller-A 2 2 0 Naib Qasid 6 2 -4
Driller-B 7 5 -2 Chowkidar 6 3 -3
Jr. Store keeper 1 1 0 Total 55 25 -30
Fitter-II 6 6 0 Notes (posts/incumbants surrendered/ reajdusted):
Fitter -III / Well Borer 3 2 -1 - 01 XEN is shifted to the office of Director Investigations
and 01 XEN to Director Planning
Fitter Cooly 5 3 -2 - 01 JE is shifted to Dir. Planning
Naib Qasid 4 4 0 - 01 AB&AO, Accts. Assistant/ Cashier, H. Clerk/ Assistant from PSR to
Geotech Division
Chowkidar 5 7 2 - 01 Steno G-II Surrendered. may be adjusted against vaccant
Sanitary Worker 1 2 1 post under Geotech Division.
- 01 Jr. Clerk shifted to Tech Section CE-II
Total 49 47 -2 - 01 H.clerk/ Assistant shifted to Director Tech. GM (P)
Notes (posts/incumbants surrendered/ reajdusted): - 02 N. Qasid shifted to Survey Division PSW (T&M)
- 01 Sr. Engr. and Jr. Engr Shifted to Dir. Planning - 02 Chowkidar shifted to Geotech Division, 01 Chowkidar shifted to tech
- 01 Sub Engr is shifted to Common Service Section under Dir. E&M Section CE-II
against the vaccant position of S. Engr (Mech) - 01 S. worker shifted to Geotech Section
- 01 Steno G-II may be redesignated as A.CAD Draftsman and shifted to
Director
Planning
er

y of Hydropower Projects

WAPDA Model Studies Cell Admn. & Works Section


Existing Proposed (-) Surrendered/ Existing Proposed (-) Surrendered/
Positions Positions
2014-15 2015-16 (+) Additional 2014-15 2015-16 (+) Additional
RO (Hydraulics) 3 3 0 AD (Admn) 1 0 -1
ARO (Hydraulics) 2 2 0 Sr. Supdt. (Admn) 1 1 0
ARO (SWH) 1 1 0 Sr. Supdt. (Works) 1 0 -1
Accts Asstt 1 1 0 Steno G-II 1 0 -1
Sub Engineer 1 1 0 Sr. Clerk 3 2 -1
Research Asstt 1 1 0 Jr. Clerk/ typist 3 3 0
Silt Observer 1 1 0 Assistant 1 1 0
Naib Qasid 1 1 0 Tele Operator 1 0 -1
Naib Qasid 4 3 -1
Chowkidar 2 0 -2
Sanitary Worker 2 0 -2
Total 11 11 0 Total 20 10 -10
Notes (posts/incumbants surrendered/ reajdusted):
- AD Admn Surrendered and incumbant may - 01 T. Operator shifted to Tech
be Section CE-II
adjusted against proposed post of DD - 01 N.Qasid shifted to Dir. Planning
(Admn) - 01 Chowkidar shifted to Tech. Section
under GM (P) W CE-II
- 01 SS (Works) shifted to Tech. Section CE-II - 02 S. Worker shited to Tech. Section
- 01 Steno G-II will be adjusted against an CE-II
existing vaccancy in admn section
- 01 Sr. Clerk shifted to Geotech Division
- 01 Jr. Clerk shifted to Tech Section, GM (P) W
- Proposed Admn. strength to be shifted under GM (P) W.

Technical Section
Existing Proposed (-) Surrendered/
Positions
2014-15 2015-16 (+) Additional
Chief Engineer (Civil) 1 1 0
Director 1 0 -1
Dy. Dir (Civil) 1 1 0
ADE/JE. (Civil) 1 1 0
Sr. Supdt. (Works) 0 1 1
Sub Engr/ CT 1 1 0
APS/ Steno 2 1 -1
Steno G-II 0 1 1
Assistant 1 1 0
DraftsMan 1 1 0
Telephone Operator 0 1 1
Jr. Clerk 0 1 1
Qasid 1 1 0
PPCO 1 0 -1
Naib Qasid 3 2 -1
Chowkidar 3 5 2
Sanitary Worker 1 3 2
Total 18 22 4
Notes (posts/incumbants surrendered/ reajdusted):
- Dir. Tech be shifted to Tech Section under GM (P) W
- 01 APS shifted to Tech Section under GM (P) W
- 01 Naib Qasid shifted to Director planning
Site identification, Reconnaissance/ Pre-Feasib
Study of Hydropower Projects
nnaissance/ Pre-Feasibility
opower Projects

You might also like