China Harbour Engineering Co.L.L.C. INSPECTION AND TESTING PLAN (ITP): ……………………………….
Contractor: Date:
Contract No. & Location:
Description of Activity:
Legend for acceptance criteria: *AR = Approval *H = Hold Point *M = Monitoring *S = Surveillance *A = Actual Inspection *T/C = Test Certificate Reqd.
REF. INSPECTION BY
ACTIVITY ACCEPTANCE VERIFYING
No.
ACTIVITY DOCUMENT
CRITERIA
Frequency
DOCUMENT
CONTRACTOR’S CONSULTANT INDEPENDENT
(CLAUSE) QC TESTING LAB
1 Blinding level verification Before process
2 Footings setting out and Before process
Level check
3 Reinforcement inspection After process
complete
4 Form work inspection After process
complete
5 Cast in Place Concrete Initial and every ASTM94/C
shipment 94M
Contractor: (Name, Signature & Date) Consultant: Approved By (Name, Signature & Date)