CRESCENT DEVELOPMENT
PROJECT
CONCRETE WORK
№
Physical Check for A1 W2 W1 M-R1
1 AAC Block Work Approved Shop Applicable Drawing Work Inspection Request
Joints size, Vertical
Drawing and horizontal
Criteria
During Mix
Inspection Report –
IM&T Calibration Design Approval.
Survey Equipment International / National General
2 Procedure Cal. Certificate TC R1 R1 R1
Calibration Standard & Calibration Agency
Review with
Certificate
Frequency Wise
Min 5℃
7 Ambient Check to Weather (Use heating, covering Work Inspection Request
5.3.1.6 of ACI 301 A1 A2 W2 M
Temperature Condition means to maintain
required temperature)
Physical Check for
Size, Surface
8 Approved Work Inspection Request
Formwork Cleanliness, Form
Applicable Drawing A W2 W1 W2
Installation Drawing Support, Embedded
1
Items & Box
Anchor etc.
Formwork Removal Concrete Review and Verify a) Vertical Forms
Pouring of Curing Status with Normal
9 Plan for Condition: Work Inspection Request A W2 W1 M-R1
Based on Pouring
Critical After 48hours 1
Date/Time and
Structure Compressive b) Horizontal Forms
Strength Verify for with Suspended
Critical Structure Condition: After
7-Days and
Verified
70% Design Comp.
Strength
Physical Check for
10 Rebar Size,
Reinforcement Approved Cleanliness Work Inspection Request
Applicable Drawing A W2 W1 W1
Rebar Installation Drawing Dimension, Overlap
Length and Spacer 1
Fasten & Distance
Document review of
Approved drawing
Manufacture Data (MAR)-Material Approval
11 Form Oil & Manufacturer Applicable Drawing AR W2 AR M-R1
Sheet and/or Sample Request for Construction
data sheet
check, if required
DATE OF DATE OF
Masonry Bloks / Hörgü Blokları N/A YES NO Masonry Bloks / Hörgü Blokları N/A YES NO
INSPECTION INSPECTION
1.Cleaned the entire floor before starting the line-out of masonry? 10.Has all the Vertical joints been 1/3?
Hörgü işinə başlamazdan əvvəl bütün mərtəbəni təmizlədinizmi? Bütün Şaquli birləşmələr 1/3 olub??
6. Dimensions of reinforcement to be used in beams ø12 f for wall? 16. Has the entire floor been cleaned after the work?
Kirişlərdə istifadə olunacaq armaturun ölçüləri ø12 divar üçün? İşdən sonra bütün döşəmə təmizlənibmi?
7. The clamps must be spaced f10 200mm apart? Qısqaclar bir-birindən f10 200
mm məsafədə yerləşdirilməlidir?
ÖLÇME / SURVEY
AD & SOYAD / NAME & SURNAME Mirza Guliyev
Road AND Construction İMZA / SIGNATURE
TARİX / DATE
AD & SOYAD / NAME & SURNAME
PASHA CONSTRUCTION İMZA / SIGNATURE
TARİX / DATE
8 . Maddə Elektrik, Mexanik qrupları tərəfindən yoxlanılmalıdır. Qalanları tikinti qrupu tərəfindən yoxlanılmalıdır. Clause 8 is to be checked by Electrical and Mechanical teams respectively. Remaining ones are to be checked by Construction Team.