Professional Documents
Culture Documents
Certified Certified
a Retention Money @ 5%
-
b
Income tax ( TDS ) @ 1% -
5 Total Deduction (a+b )
- -
6 Net value due to contractor
- -
7a Less: paid till date
7b
With held
Contractor Passed by
Hindustan Infratech
ecial repairing of Trang building at Colaba.
me of Contractor : IMRAN.S KHAN
Running Bill No.01
Certified date :- 10/12/2016
Month Ending :July 2016
Amount ( Rs. )
This bill
Certified
Approved by
Hindustan Infratech
Hindustan Infratech
Project: Special repairing of Trang building at Colaba.
Name of Contractor : IMRAN.S KHAN
Running Bill No.01
Total Rs 0.00
Hindustan Infratech
Project: Special Repairs to tarang building at Colaba
Name of Contractor : IMRAN.S KHAN
Emaran Advance Payments
Total 0.00
Hindustan Infratech
Project: Special repairing of Trang building at Colaba.
Name of Contractor : IMRAN.S KHAN
Running Bill No.01
Measurement of Tiles flooring in reception area
Sr No Description Unit Nos L B H
1 Reception area flooring Sqrm 1 10.8 10.8
2 Pssage side Sqrm 1 7.2 5.4
3 Stair side Sqrm 1 3.6 0.6
Reception and canteen partion wall side Sqrm 1 4.2 1.2
Less column Sqrm -6 0.43 0.43
Sqrm
Grand Total Sqrm
Previously Paid Sqrm
This Bill Total Sqrm
Qty
116.64
38.88
2.16
5.04
-1.11
161.61
161.61
0
161.61