Hindustan Infratech

Project:Special Repairs to Jamuna building in residential


Summary RA1 IMRAN.S KHAN
Civil Work Certified date :- 10/12/2016
RA1 Month Ending :July 2016
Amount ( Rs. )

S. No. DESCRIPTION Upto date Previous

Certified Certified

TOTAL VALUE OF WORK


Bill of Quantities
a)
1 Total Amount of This Bill
5,309.38 -
2 Materials Recovery
-
3 Gross Value due to Contractor
5,309.38 -
4 Deduction

a Retention Money @ 5%
265
b
Income tax ( TDS ) @ 1% -
5 Total Deduction (a+b )
- -
6 Net value due to contractor
5,309.38 -
7a Less: paid till date

7b
With held

8 Net Payable Value due to Contractor


5,309.38

Contractor Passed by
Hindustan Infratech
al Repairs to Jamuna building in residential
Summary RA1 IMRAN.S KHAN
Certified date :- 10/12/2016
Month Ending :July 2016
Amount ( Rs. )

This bill

Certified

5,309.38

5,309.38

5,309.38

108,000.00

Approved by
Hindustan Infratech
Project:Special Repairs to Jamuna building in residential
Summary RA1 IMRAN.S KHAN

Sr No Description Unit Previous bill Qty This bill Qty Rate

1 Concrete chipping 86.98


2 Plaster 0.00 79.09 22
3 Plaster Chipping 696.47 5

Total Rs
Amount

86.98
1740.07
3482.331

5309.38
Hindustan Infratech
Project: Special repairing to Jamuna building in residential
Name of Contractor : IMRAN.S KHAN
Emaran Advance Payments

SR NO DATE VOUCHER NO/ PAYMENT DONE PAYMENT DONE


CHEQUE NO THRU CHEQUE NEFT THRU CASH/ VOUCHERS
1 21/04/2017 1 15000.00
2 21/04/2017 2 5000.00
3 28/04/2017 3 15000.00
4 4/5/2017 4 15000.00
5 4/5/2017 5 15000.00
6 8/5/2017 6 10000.00
7 8/5/2017 7 10000.00
8 13/05/2017 8 11000.00
9 14/05/2017 9 5000.00
10 20/05/2017 10 5000.00
11 20/05/2017 11 2000.00
Total 108000.00
Total 108000.00
Hindustan Infratech
Project: Special repairing to Jamuna building in residential
Name of Contractor : IMRAN.S KHAN
Running Bill No.01
Measurement of plaster chipping outer and inner side
Sr No Description Unit Nos L B H
1 Column no.1 Sqrm 2 0.45 23.65
Beam Sqrm 14 1.91 0.85
Column no.2 Sqrm 2 0.45 23.65
Beam Sqrm 14 2.33 0.85
Column no.3 Sqrm 2 0.6 23.65
Beam Sqrm 14 2.09 0.85
Column no.4 Sqrm 2 0.6 23.65
Beam Sqrm 14 2.88 0.85
Column no.6 Sqrm 2 0.6 23.65
Sqrm 2 0.35 23.65
Beam Sqrm 14 1.78 0.85
Column no.7 Sqrm 2 0.6 23.65
Beam Sqrm 14 2.62 0.85
Column no.8 Sqrm 2 0.6 23.65
Back site Sqrm 2 0.35 23.65
Beam Sqrm 14 3.23 0.85
Wall Sqrm 1 7 20
Less opening Sqrm -14 2.92 0.97
Bathroom wall Sqrm 2 2.08 23.65
Parapet wall Sqrm 1 14.2 1.15
Sqrm 2 6.2 1.15
Sqrm 2 2.48 1.15
Sqrm 2 2.4 1.15
Sqrm 2 3.8 1.15
Sqrm 2 2.9 1.15
24/05/17 Second floor store room Sqrm 1 0.5 2
Sqrm 1 0.2 2
Sqrm 1 1.4 0.2
Sqrm 1 1.4 0.1
Sqrm 1 1.2 0.1
Sqrm 1 1.5 0.2
Window sill Sqrm 1 1.25 0.28
Jamb Sqrm 2 1.17 0.28
Bedroom first window sill Sqrm 2 1 0.28
Jamb Sqrm 2 1.17 0.28
Hall Sqrm 1 0.9 0.3
Sqrm 1 0.3 0.3
Main door lintel Sqrm 1 1.1 0.1
Column at shaf Sqrm 1 0.6 1.16
Window sill Sqrm 3 1.55 0.28
Sqrm 2 1.2 0.28
Column at bolcony Sqrm 1 1.15 0.4
Hindustan Infratech
Project: Special repairing to Jamuna building in residential
Name of Contractor : IMRAN.S KHAN
Running Bill No.01
Measurement of plaster chipping outer and inner side
Sr No Description Unit Nos L B H
Column near at bed room second Sqrm 1 1.2 0.35
Bedroom second window sill Sqrm 2 1 0.28
Sqrm 4 1.17 0.28
Passage column Sqrm 1 1.5 0.6
First floor window sill in hall Sqrm 4 1.55 0.28
Jamb Sqrm 2 1.2 0.28
Column Sqrm 2 0.6 1.3
Bedroom second window jamb Sqrm 4 1.2 0.28
Sill Sqrm 4 1 0.28
Column Sqrm 1 1.7 0.2
Store room window sill Sqrm 2 1.2 0.28
Jamb Sqrm 2 1.2 0.28
Column Sqrm 1 2 0.1
Wall Sqrm 1 0.45 0.2
Sqrm 1 0.45 0.2
Sqrm 1 1.55 0.2
Sqrm 1 0.6 0.15
Bedroom first window sill Sqrm 2 1 0.28
Jamb Sqrm 4 1.2 0.28
Copbord Sqrm 1 0.5 0.5
Wall column Sqrm 1 0.9 0.15
Wall Sqrm 1 0.5 0.2
Sqrm
Grand Total Sqrm
Previously Paid Sqrm
This Bill Total Sqrm
Qty
21.29
22.73
21.29
27.73
28.38
24.87
28.38
34.27
28.38
16.56
21.18
28.38
31.18
28.38
16.56
38.44
140.00
-39.65
98.38
16.33
14.26
5.70
5.52
8.74
6.67
1.00
0.40
0.28
0.14
0.12
0.30
0.35
0.66
0.56
0.66
0.27
0.09
0.11
0.70
1.30
0.67
0.46
Qty
0.42
0.56
1.31
0.90
1.74
0.67
1.56
1.34
1.12
0.34
0.67
0.67
0.20
0.09
0.09
0.31
0.09
0.56
1.34
0.25
0.14
0.10
696.47
696.47
0
696.47
Hindustan Infratech
Project: Special repairing to Jamuna building in residential
Name of Contractor : IMRAN.S KHAN
Running Bill No.01
Measurement for Plaster
Sr No Description Unit Nos L B H
GROUND FLOOR
1 Main entrance side wall plaster Sqrm 1 2.4 2.1
Column Sqrm 1 0.655 2
Opposite side wall Sqrm 1 1.2 2.5
B-wing entrance side Sqrm 1 1 2.05
Front of second lif wall Sqrm 1 2.95 2.15
Less door Sqrm -1 1.92 0.65
Entrance of C-wing Sqrm 1 1.62 2.15
Less opening Sqrm -1 1.15 1.78
Jamb Sqrm 2 0.25 1.78
Lintel Sqrm 1 0.25 1.14
Front of lif 1 wall Sqrm 1 2.24 1.85
Entrance of A-wing Sqrm 1 3.35 1.8
Less wall Sqrm -1 1.77 1.17
Jamb Sqrm 2 1.77 0.22
Lintel Sqrm 1 1.17 0.22
Above lintel wall Sqrm 1 2 0.7
A-wing entrance passage wall Sqrm 1 2.85 2.56
Less opening Sqrm -1 1.9 0.89
Less unplaster surface Sqrm -1 1.9 0.84
Less beam Sqrm -2 0.25 0.485
Same opposite side wall Sqrm 1 2.85 2.56
Less opening Sqrm -1 1.9 0.89
Less beam Sqrm -2 0.25 0.48
Width of passage Sqrm 1 1.1 0.39
Opposite of A-wing main door wall Sqrm 1 2.27 2.6
Less opening Sqrm -1 1.83 1.17
Jamb Sqrm 2 1.83 0.25
Side wall Sqrm 1 2.25 2.57
Same side opposite wall Sqrm 1 2.25 2.57
Less Sqrm -1 2.25 0.5
Hall main doorwall Sqrm 1 3.3 1.95
Sqrm 1 2.3 1.93
Hall wall at bed room second Sqrm 1 1.6 2
Toilet wall outer side Sqrm 1 1.2 1.6
Toilet wall plaster Sqrm 2 1.17 2.2
Short wall Sqrm 2 0.88 2.2
Less door Sqrm -1 1.96 0.7
Less ventilation Sqrm -1 0.58 0.57
Ventilation jamb Sqrm 1 0.06 0.57
Bathroom long wall Sqrm 2 2.15 2
Less door Sqrm 1 1.96 0.8
Short wall Sqrm 1 1.15 2
Less ventilation Sqrm -1 0.57 0.87
Door jamb Sqrm 2 0.07 2
Toilet wall outer side Sqrm 1 1.27 1.4
Toilet wall plaster Sqrm 2 1.17 2.2
Short wall Sqrm 2 0.88 2.2
Less door Sqrm -1 1.96 0.7
Less ventilation Sqrm -1 0.58 0.57
Ventilation jamb Sqrm 1 0.06 0.57
FIRST FLOOR PLASTER Sqrm
A-wing passage Sqrm 2 2.62 0.82
Sqrm 2 1.1 0.37
Sqrm 1 0.32 1.2
Main door side Sqrm 1 3.1 1.4
in bed room 1 Sqrm 1 0.7 0.3
Sqrm 1 0.2 0.3
Front of toilet wall Sqrm 1 0.97 0.8
Toilet wall outer side Sqrm 1 1.55 0.9
Toilet inner side plaster Sqrm 2 1.2 1
Sqrm 1 0.9 1.2
Sqrm 1 0.25 1
Bathroom plaster Sqrm 1 2.15 2.5
Sqrm 1 2.15 2.05
Less door Sqrm -1 0.8 1.96
Short wall Sqrm 1 1.23 1.8
Sqrm 1 1.23 1.7
Less ventilation Sqrm 1 0.87 0.57
Hall Sqrm 1 0.6 0.3
Sqrm 1 0.8 0.5
Sqrm 2 1.6 0.2
Sqrm 1 0.3 0.2
Bedroom second Sqrm 1 1.02 0.8
Toilet inner side Sqrm 1 1.14 1.15
Short wall Sqrm 1 0.72 1
Sqrm 1 1.07 1
Bathroom Sqrm 2 2.2 1.9
Less door Sqrm -1 0.8 1.98
Short wall Sqrm 2 1.14 1.9
Less ventilation Sqrm -1 0.9 0.62
Second floor Sqrm
Lif 1 side column Sqrm 1 0.38 2.05
Sqrm 1 0.5 1.5
Lif side column Sqrm 1 1.15 2
Main door side Sqrm 1 2.25 0.5
Bedroom first Sqrm 1 0.6 0.3
Sqrm 1 0.5 0.3
Front of toilet wall Sqrm 1 0.99 0.4
Sqrm 1 0.5 0.4
Column at store side Sqrm 1 0.25 1.2
Sqrm 1 0.6 0.2
Column in store room Sqrm 2 0.5 2.05
Sqrm 1 1.5 0.4
Door wall side Sqrm 1 1.5 0.15
Sqrm 1 1.5 0.1
Sqrm 1 1.4 0.2
Hall Sqrm 1 1.85 0.3
Sqrm 1 4.3 0.3
Bathroom wall outer side Sqrm 1 1.1 0.5
Sqrm 1 0.85 0.6
Bedroom first Sqrm 1 1.2 0.2
Sqrm 1 0.8 0.2
Grand Total Sqrm m2
Previously Paid Sqrm m2
This Bill Total Sqrm m2
Qty

5.04
1.31
3.00
2.05
6.34
-1.25
3.48
-2.05
0.89
0.29
4.14
6.03
-2.07
0.78
0.26
1.40
7.30
-1.69
-1.60
-0.24
7.30
-1.69
-0.24
0.43
5.90
-2.14
0.92
5.78
5.78
-1.13
6.44
4.44
3.20
1.92
5.15
3.87
-1.37
-0.33
0.03
8.60
1.57
2.30
-0.50
0.28
1.78
5.15
3.87
-1.37
-0.33
0.03
0.00
4.30
0.81
0.38
4.34
0.21
0.06
0.78
1.40
2.40
1.08
0.25
5.38
4.41
-1.57
2.21
2.09
0.50
0.18
0.40
0.64
0.06
0.82
1.31
0.72
1.07
8.36
-1.58
4.33
-0.56
0.00
0.78
0.75
2.30
1.13
0.18
0.15
0.40
0.20
0.30
0.12
2.05
0.60
0.23
0.15
0.28
0.56
1.29
0.55
0.51
0.24
0.16
79.09
0
79.09
Hindustan Infratech
Project: Special repairing to Jamuna building in residential
Name of Contractor : IMRAN.S KHAN
Running Bill No.01
Measurement of concrete chipping
Sr No Description Unit Nos L B
1 Column no.1 Sqrm 1 0.45
Sqrm 1 0.45
Sqrm 1 0.45
Beam no 1 ground floor Sqrm 1 1.8
Second floor Sqrm 1 1.8
Fourt floor Sqrm 1 1.8
Sixth floor Sqrm 1 1.8
Column no.2 Sqrm 1 0.45
Sqrm 1 0.45
Sqrm 1 0.45
Sqrm 1 0.45
Sqrm 1 0.45
Column no.3 Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.6
Beam no.2 ground floor Sqrm 1 0.2
First floor Sqrm 1 1.8
Second floor Sqrm 1 1.8
third floor Sqrm 1 2
Fourt floor Sqrm 1 0.5
Column no.4 Sqrm 1 0.3
Sqrm 1 0.35
Sqrm 1 0.65
Sqrm 1 0.65
Sqrm 1 0.65
Sqrm 1 0.65
Beam no.3 third floor Sqrm 1 0.5
Sixth floor Sqrm 1 0.5
Seventh floor Sqrm 1 0.5
Column no.6 Sqrm 1 0.35
Sqrm 1 0.6
Sqrm 1 0.95
Sqrm 1 0.6
Sqrm 1 0.6
Beam no.5 second floor Sqrm 1 0.8
Column no.7 Sqrm 1 0.65
Sqrm 1 0.65
Sqrm 1 0.65
Sqrm 1 0.65
Beam no.6 second floor Sqrm 1 1.5
Sqrm 1 0.5
Column no.8 Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.35
Sqrm 1 0.35
Sqrm 1 0.35
Beam no.7 Sqrm 1 2.5
Sqrm 1 1
Sqrm 1 0.6
Sqrm 1 3.2
Sqrm 1 1
Column no.9 Sqrm 1 0.35
Beam no.8 Sqrm 1 0.4
Sqrm 1 2.97
Column no.10 Sqrm 1 0.35
Sqrm 1 0.35
Sqrm 1 0.35
Beam no.9 Sqrm 1 1
Sqrm 1 2.97
Sqrm 1 1.2
Column no.11 Sqrm 1 0.35
Sqrm 1 0.35
Sqrm 1 0.35
Sqrm 1 0.95
Beam no.10 Sqrm 1 3.2
Sqrm 1 3.2
Column no.12 Sqrm 1 0.35
Sqrm 1 0.35
Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.6
Column no.13 Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.6
Beam no.12 Sqrm 1 1
Sqrm 1 1.7
Column no.14 Sqrm 1 0.6
Sqrm 1 0.95
Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.35
Beam no.14 Sqrm 1 0.35
Sqrm 1 0.4
Column no.16 Sqrm 1 0.35
Sqrm 1 0.35
Sqrm 1 0.35
Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.6
Column no.17 Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.6
Sqrm 1 0.6
Column no.18 Sqrm 1 0.45
Sqrm 1 0.45
Grand Total Sqrm m2
Previously Paid Sqrm m2
This Bill Total Sqrm m2
l

H Qty
1.5 0.68
0.5 0.23
0.4 0.18
0.55 0.99
0.55 0.99
0.55 0.99
0.55 0.99
2.5 1.13
2.5 1.13
0.5 0.23
0.3 0.14
0.8 0.36
2.3 1.38
2.5 1.50
1.5 0.90
1 0.60
2.5 1.50
2.7 1.62
0.65 0.13
0.65 1.17
0.65 1.17
0.65 1.30
0.65 0.33
1 0.30
19 6.65
2 1.30
0.6 0.39
1.5 0.98
2.5 1.63
0.65 0.33
0.65 0.33
0.65 0.33
2 0.70
0.5 0.30
2 1.90
0.3 0.18
1.5 0.90
0.65 0.52
2 1.30
1.5 0.98
2 1.30
3 1.95
0.65 0.98
0.65 0.33
3.3 1.98
3 1.80
5.2 3.12
5.8 3.48
3.3 1.16
5.6 1.96
11 3.85
0.2 0.50
0.2 0.20
0.65 0.39
0.65 2.08
0.65 0.65
13 4.55
0.65 0.26
0.65 1.93
0.6 0.21
0.6 0.21
0.6 0.21
0.65 0.65
0.65 1.93
0.4 0.48
4 1.40
5 1.75
0.5 0.18
0.6 0.57
0.65 2.08
0.65 2.08
0.6 0.21
15 5.25
6 3.60
5.5 3.30
1 0.60
8 4.80
0.8 0.48
2 1.20
2.5 1.50
0.65 0.65
0.65 1.11
2.2 1.32
2.7 2.57
6 3.60
6 3.60
1 0.35
2.5 0.88
0.65 0.26
2.5 0.88
2.8 0.98
1 0.35
0.3 0.18
0.35 0.21
0.35 0.21
0.3 0.18
1.5 0.90
0.35 0.21
0.4 0.24
0.4 0.18
0.45 0.20
86.98
0
86.98