Part I - Account Of Work Executed

As Per Agreement Ref Of Quantities Of Work Value At Agreement Rate Or


As Per Estimate
No……………………… Measure Or Supplies Work Done
Sl
Unit Description Of Work Done Or Supplies Made Remarks
No Rate Number Rate Number MB Up To Since Up To Date Since Last Bill
Pg
Rs Ps Quantity Rs Ps Quantity No Date Last Bill Rs Ps Rs Ps
1 2 3 4 5 6 7 8 9 10 11 12 13

Clearing jungle including uprooting of rank vegetation, grass, brush

650/2018
2 wood, trees and saplings of girth up to 30 cm measured at a height
1.1 14.69 21625.00 14.69 21625.00 m 36 21625.00 317671.25
of 1 m above ground level and removal of rubbish up to a distance of
50m outside the periphery of the area cleared.

Earth work in excavation by mechanical means (Hydraulic excavator) /

650/2018
manual means over areas (exceeding 30 cm in depth, 1.5m in width as
1.2 212.70 296.88 212.70 296.876 m3 well as 10 sqm on plan) including getting out and disposal of 36 294.362 62610.80
excavated earth, lead up to 50 m and lift up to 1.5m, as directed by
Engineer-in-Charge. All kinds of soil

Grand Total 380282.05


Deduct Tender Variation - 31.1 % Below Estimate Rate 118267.72
Total Value Of Work Done 262014.33
As Per Agreement Ref Of Quantities Of Work Value At Agreement Rate Or
As Per Estimate
No……………………… Measure Or Supplies Work Done
Sl
Unit Description Of Work Done Or Supplies Made Remarks
No Rate Number Rate Number MB Up To Since Up To Date Since Last Bill
Pg
Rs Ps Quantity Rs Ps Quantity No Date Last Bill Rs Ps Rs Ps
1 2 3 4 5 6 7 8 9 10 11 12 13

Grand Total Of The Value Of Work Or Supplies Made To Date (A)


Deduct Value Of Work Or Supplies Shown In Previous Bill
262014.33
Net Value Of Work Or Supplies Since Previous Bill (F)
Figure (F) In Words