STATUS OF ONGOING PROJECT

RURAL ROAD AND BRIDGE PROJECT

1. State : TRIPURA

2. Name of the Project : Construction of Permanent RCC Bridge over


Manu Cherra on the road connecting Belonia &
Bogafa at ch.2.70Km, South Tripura(Bridge
proper with approach road)
marpur                                                            Tirthamukh road.
3. Project Location
a. District : South Tripura
outh Tripura

b. Taluka :

c. Block :
d. Chainage (km)
i) From :2.70Km
ii) To
iii)Length : 56.94m

e. Other relevant details as per :


Annexure-I may be furnished

4. Type of Project
a) New/Ongoing : NEW.

b) Black topping/strengthening
Widening : Not applicable as this is a Bridge Construction
Project.

5. Implementing Agency : : Tripura Housing and Construction Board.

6. Project Design Brief Tech. Details


As per Annexure-II and III :

7. Details of administrative approval


a) Date of approval : 10/ 01/ 2008
b) Amount approved (Rs. lakh) : 353.50

8. Date of Commencement of Project :

9. Schedule of completion

Page- 1 of 6
as per sanction :

10. Date of actual completion :


of work in all respects
(in case of time overrun
the reasons for delay)

11. No. and date of RIDF


loan sanction : 5054-04-800 -54-01-53 Major Works.
NABARD – XIII (GEN) dt. 10-01-2008NO.
SPD/96/RIDF-IV(TRIPURA)/27 PSC/98 -
DATED 23-03-
12. RIDF Sanction (Rs. lakh)
a) Total cost of the project : Rs. 182.61 lakhs.

b) Expenditure incurred before : NIL


RIDF loan sanction

c) Balance Cost : Rs. 182.61 lakhs.

d) RIDF Loan : 353.50 Lakh.Rs. 144.05 lakhs.

e) State Govt. contribution : Rs. 38.56 lakhs.

13. RIDF loan released (Rs. lakh) : Rs. 144.05 lakhs.

14. Up-to-date expenditure statement :


(Year wise from inception)

Financial Year Amount (Rs. lakh)

TOTAL 277.46 Lakh

15. Tolls proposed to be collected : NIL

Page- 2 of 6
16. a) Details of expenditure incurred (Rs. lakh)
Expenditure Incurred
After RIDF loan Sanction

SanctionBefore RIDF loan


Items of Works As per

(3+9)
Total
Sanction Actual Difference
Sl. No

Excess Saving

Quantity

Quantity
Amount

Amount

Quantity

Quantity
Amount

Amount
Rate

Rate

Rate

Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Construction of RCC
Bridge over Manu

353.50 Lakh

277.46Lakh
Cherra

-------

-------

-------

-------
NIL

1 no

1 no

1 no

1 no
1

-------

-------

-------

-------
Total

NIL

1 no

1 no

1 no

1 no
b) Abstract
i) Project cost as per sanction :-353.50 Lakh
ii) Actual expenditure on completion:
iii)Excess/Savings:

17. Reasons for excess/savings:-

18. CERTIFICATE

Certified that the above mentioned works were commenced on (indicate the date) that I
have inspected them personally and that the works have been carried out satisfactorily in
accordance with the approved design. The project will be able to realize the objectives as laid
down at the time of sanction.

Executive Engineer,
Amarpur Division,
Amarpur, Tripura(S)

ANNEXURE - I

Page- 3 of 6
1. Brief details of the road/bridge indicating the location, villages to be benefited with the
connectivity etc.

2. Location of map of the road/bridge in the block map.

3. Relevant information to be furnished in brief :

a) Employment generated (non-recurring)


in lakh mandays

b) No. of villages connected

c) Marketing centres connected and their names

d) Distance reduction details


(Pre-development position
vis-a-vis Post-development)

e) Any other relevant information

4. Arrangements for maintenance

a) Amount required for annual


maintenance of the project

b) Source of funds

c) Agency to handle maintenance

d) Annual allocation for maintenance by the State Government (if already made)

5. Constraints, if any, faced in implementation of the project

6. Views of the beneficiaries under the (road/bridge)

7. Photograph (in colour) of the project (road/bridge)

8. Any other relevant information.

9. Safety measures/Quality standards undertaken.

Page- 4 of 6
ANNEXURE - II

Rural Road Projects - Technical Details - RIDF

(km)Length of Road

inter- mediate/Lane (single/


(m)Road way Width

Width (m)Carriageway
Pavement

Class of Road
Thickness (mm) Material
Sl. No

Status

facingSur-

Sub- base
Sub- base

Sanction
Total
Base

Base
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Pre-
nt (Existin)
As perdevelopme

1 - - - - - - - - - - - -
Sanction

2 Not Related to this Project, as it is Bridge Construction


Post-

3 - - - - - - - - - - - -
developme
nt (Final)
Standard
As per
I.R.C.

4 - - - - - - - - - - - -

- - - - - - - - - - - -

Note : In case of the project is being proposed in different sections, the above details may be
furnished for each section of the road.

Page- 5 of 6
ANNEXURE - III

Rural Bridge Projects - Technical Details - RIDF

Connecting
Type
Roads
Length Width No. of Span
Sl. No.

Road
Status (m) (m) Spans Length Super
way Foundati
Class (m) Structur
Width on
e
(m)
1
2 3 4 5 6 7 8 9 10
Pre-
Development
1
(Existing)

As per Well RCC T-


RCC 2 X 25
2 sanction 56.94m 12.0 m 2 Foundati beam &
Bridge m
on Slab
Post
development
3
(Final)

As per I.R.C.
4 Standard

Executive Engineer,
Amarpur Division,
Amarpur, Tripura(S)

Page- 6 of 6
NABARD AIDED PROJECT UNDER RIDF-IV/V/VIII/XII

Name of Work:- (Details of span etc.)

Total Cost:-
Loan Assistance from NABARD:-
Date of Commencement:-
Date of Completion:-

Implemented by:- Division, PWD(R&B), Govt. of Tripura

Page- 7 of 6