Professional Documents
Culture Documents
1. State : TRIPURA
b. Taluka :
c. Block :
d. Chainage (km)
i) From :2.70Km
ii) To
iii)Length : 56.94m
4. Type of Project
a) New/Ongoing : NEW.
b) Black topping/strengthening
Widening : Not applicable as this is a Bridge Construction
Project.
9. Schedule of completion
Page- 1 of 6
as per sanction :
Page- 2 of 6
16. a) Details of expenditure incurred (Rs. lakh)
Expenditure Incurred
After RIDF loan Sanction
(3+9)
Total
Sanction Actual Difference
Sl. No
Excess Saving
Quantity
Quantity
Amount
Amount
Quantity
Quantity
Amount
Amount
Rate
Rate
Rate
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Construction of RCC
Bridge over Manu
353.50 Lakh
277.46Lakh
Cherra
-------
-------
-------
-------
NIL
1 no
1 no
1 no
1 no
1
-------
-------
-------
-------
Total
NIL
1 no
1 no
1 no
1 no
b) Abstract
i) Project cost as per sanction :-353.50 Lakh
ii) Actual expenditure on completion:
iii)Excess/Savings:
18. CERTIFICATE
Certified that the above mentioned works were commenced on (indicate the date) that I
have inspected them personally and that the works have been carried out satisfactorily in
accordance with the approved design. The project will be able to realize the objectives as laid
down at the time of sanction.
Executive Engineer,
Amarpur Division,
Amarpur, Tripura(S)
ANNEXURE - I
Page- 3 of 6
1. Brief details of the road/bridge indicating the location, villages to be benefited with the
connectivity etc.
b) Source of funds
d) Annual allocation for maintenance by the State Government (if already made)
Page- 4 of 6
ANNEXURE - II
(km)Length of Road
Width (m)Carriageway
Pavement
Class of Road
Thickness (mm) Material
Sl. No
Status
facingSur-
Sub- base
Sub- base
Sanction
Total
Base
Base
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Pre-
nt (Existin)
As perdevelopme
1 - - - - - - - - - - - -
Sanction
3 - - - - - - - - - - - -
developme
nt (Final)
Standard
As per
I.R.C.
4 - - - - - - - - - - - -
- - - - - - - - - - - -
Note : In case of the project is being proposed in different sections, the above details may be
furnished for each section of the road.
Page- 5 of 6
ANNEXURE - III
Connecting
Type
Roads
Length Width No. of Span
Sl. No.
Road
Status (m) (m) Spans Length Super
way Foundati
Class (m) Structur
Width on
e
(m)
1
2 3 4 5 6 7 8 9 10
Pre-
Development
1
(Existing)
As per I.R.C.
4 Standard
Executive Engineer,
Amarpur Division,
Amarpur, Tripura(S)
Page- 6 of 6
NABARD AIDED PROJECT UNDER RIDF-IV/V/VIII/XII
Total Cost:-
Loan Assistance from NABARD:-
Date of Commencement:-
Date of Completion:-
Page- 7 of 6