Dear Sir,
According to the submission of Annual Maintenance Schedule and Availability of Celukan Bawang
CFSPP 380 MW for Contract Year Fourth 2018 – 2019 Final Revision Two. Hereby we submit the
document of Monthly Operations Plan ( Rencana Daya Bulanan ) Celukan Bawang CFSPP 380MW
period March 2019 with several information as follows :
SCHEDULED
AVAILABLE UNSCHEDULED
NDC PHm AFpm OUTAGE
ENGINE HOURS OUTAGE
(PO+MO)
PLTU Celukan Bawang Unit # 2 125 744 89% 658.72 80.81 4.47
Thank you for kind attention and consideration and Please feel free to contact us should you require
any further information.
1/2
PT. GENERAL ENERGY BALI
Mailing Address: The East 38th Floor Suite 05
Jl. DR Ide Anak Agung Gde Agung Kav. E.3.2 No. 1
Kel. Kuningan Timur Kec. Setiabudi, Jakarta Selatan 12950
Tel.: +62 21-29527119 Fax: +62 21-29527139
Registered Address: Desa Celukan Bawang Kec. Gerokgak, Kab. Buleleng– Bali
Yours faithfully,
PT GENERAL ENERGY BALI
WANG QINGDONG
Operations Director
Cc :
- PT PLN (Persero) Regional JBTBN
- PT PLN (Persero) UP2B Bali
- BoD, PT General Energy Bali
- PT CHD Operation Power Plant Indonesia, O&M Celukan Bawang CFSPP
2/2
PT GENERAL ENERGY BALI
DAYA MAMPU UNIT PEMBANGKIT
( KESIAPAN UNIT )
Periode : Bulan MARET 2019
01 Maret 2019 s.d 31 Maret 2019
Revisi Halaman Tgl Berlaku No.Dokumen
00 01 / 02 01-Mar-2019 525/B02/GEB/2019
Form.B-02-GEB
1 UNIT 1 142 1-Mar-19 00:00 31-Mar-19 24:00 125 62.5 125 LFC ON/S tidak ada Normal
2 UNIT 2 142 1-Mar-19 00:00 31-Mar-19 24:00 125 62.5 125 LFC ON/S tidak ada Normal
3 UNIT 3 142 1-Mar-19 00:00 31-Mar-19 24:00 130 65 130 LFC ON/S tidak ada Normal
WANG QINGDONG
Operations Director
PT GENERAL ENERGY BALI
USULAN UNIT PEMBANGKIT TIDAK SIAP OPERASI
KARENA PEMELIHARAAN / INSPECTION
Periode : Bulan MARET 2019
01 Maret 2019 s.d 31 Maret 2019
Revisi Halaman Tgl Berlaku No.Dokumen
00 02 / 02 01-Mar-2019 525/B04/GEB/2019
Form.B-04-GEB
3 UNIT 3 142 - - - -
WANG QINGDONG
Operations Director