The Pontifical and Royal

University of Santo Tomas


The Catholic University of the Philippines
Faculty of Engineering
Department of Civil Engineering Lab 6, Ground Floor, Roque Ruaño Bldg., España
CE 321L: Surveying Fieldwork/Laboratory Boulevard, Sampaloc, Manila, Philippines 1008
(632)406-1611 loc. 8516

Year & Section 3CE-A Date Performed 4/5/2018


Group No. 6 Time Started 10:45 AM
Actual Site UST Main Field Time Finished 11:45 AM
Weather Condition Sunny Date Submitted 4/12/2018

Group Members Designation


Siccion, Richelle G. Chief of the Party
Tan, Von Calvin C.
Te, Richmond Trufferson K. Asst. Chief of the Party
Tokita, Ma. Reina Clarise R. Rear Tapeman
Torres, Elgerald Adrianne A. Recorder
Vibas, Rose Anne H. Tapeman
Viernes, Kathleen Mae C. Computer
Yap, Wilbert Holmes G. Rodman

Fieldwork No. 2
Simple Curve Layout
(Tangent Offset Method)

I. Drawings and Figures

Figure 1. Establishing on the ground the PT Figure 2. Laying out the X distances of each
by laying out with a steel tape the computed station from PC.
long chord distance (LC) of ___m from PC.

CE 321L Fieldwork No. 2


Simple Curve Layout 1
(Tangent Offset Method)
Figure 3. Adding a loop from the X distances and Figure 4. Marking the located stations.
adding the Y distances, which is perpendicular to the
X distances.

Figure 5. Verifying the established curve Figure 6. Verifying the Arc length of the
station at sta 0+025 by measuring the chord curve.
distance of this station.

Figure 7. Laying out of the simple curve.

CE 321L Fieldwork No.2


Simple Curve Layout 2
(Tangent Offset Method)