IMPROVEMENT AREAS IN ASPIN PHARMACEUTICAL

(PVT.) LTD
1- VFD at AHU blowers required.
2- Smoke detectors in ducts but NO Fire dampers.
3- None of the motorize valves work (there is controller issue
forwarded to electrical team since 6 months).
Some time temperature in winters in prod. Area drops to even
below 20oC which result in continuous complains.
4- Dispensing area new project AHU is with motorized valve but
without bypass (un-like other AHUs, don’t understand why as
it’s a new project).
5- Humidity controller at return ducts are not present, if area goes
out of limit then it can be identified until it been observed in
manual reading.
6- Liquid Filling area is negative because of under capacity unit.
7- Magnahelic gauges in mfg. areas are installed in reverse
direction.
8- Existing raw material staging area in manufacturing area
doesn’t have HEPA.
9- Current Blister area AHU ( # 12) doesn’t have chill water coil ,
infect just have DX coil which never runs until 5pm. It has
booster fan which fake boost air over coil extended coil of AHU
# 11 .
10- NPD lab area is being served without HEPA.
11- HVAC load is over – PEDBO Generator and at he time of power
failure due to load management we need to.
(a) Shut down AHU of C/R mfg and packaging (male and
female).
(b) Raw material staging area Package is unit closed.
(c) Micro Lab unit closed.
(d) W/H all splits are shut down (depends).
(e) No 2 air compressors can work.

12- Cold storage air conditioning needs to be revised, as it energy


consumption is so much and also maintenance cost is way too
high.