Project: Medellin, Colombia

Form: 013- Two-Weekly Maintenance Report


Version: 1.2

Two-Weekly maintenance report


Calendar weeks and year: ___________________________________
Flare: ___________________________________
Name: ___________________________________

Flowmeter
Grease the flowmeter. 

Use oil for counter category SM-RI-X/Q75-1: Standard Oil “Isoflex-PDP 38”. The recommended
quantity of oil to be used each time is ½ cc of oil for every inch of diameter (i.e. 5cc oil for 10’’-
diameter).

Landfill gas analyser “NUK”


Solenoid valve: Clean it. 
Solenoid valve: Function control. 
Calibration of this gas analyser 
(Calibration has to be done at latest every second week)

Flue gas analyser "Rosemount"


Solenoid valve: Clean it. 
Solenoid valve: Function control. 
Calibration of this gas analyser 
(Calibration has to be done at latest every second week)

Handheld gas analyser "GA94” resp. "GA2000”


Calibration of this gas analyser 
(Calibration has to be done at latest every second week)

Remarks/Observations/Notes:

Date (dd/mm/yyyy): ___________________________________


Signature: ___________________________________