Vehicle
Cars & Taxi 22 9 23 24 20 13 24 24 19 25 24 26 253 253
Light Van 0 0 0 2 0 0 0 0 1 0 0 1 4 8
& Utility
Medium 1 0 0 0 0 0 1 0 0 0 0 1 3 7.5
Lorry &
Heavy Van
Heavy 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lorry
Bus 2 1 2 1 3 1 2 1 0 5 0 1 19 57
Motorcycle 21 15 21 28 25 20 24 19 29 30 17 18 267 200.25
TOTAL 546 525.75
Direction B
Time Pcu /
(min) hr
5 10 15 20 25 30 35 40 45 50 55 60 TOTAL
Vehicle
Cars & Taxi 37 36 45 34 31 45 32 35 33 30 33 47 438 438
Light Van 1 0 3 1 2 1 1 3 3 1 2 0 18 36
& Utility
Medium 0 1 0 0 2 1 0 0 0 0 1 1 6 15
Lorry &
Heavy Van
Heavy 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lorry
Bus 0 0 1 0 0 0 0 0 3 0 1 0 5 15
Motorcycle 17 32 24 42 35 45 26 13 26 20 21 24 325 243.75
TOTAL 792 732.75
Direction C
Time Pcu /
(min) hr
5 10 15 20 25 30 35 40 45 50 55 60 TOTAL
Vehicle
Cars & Taxi 3 0 0 3 1 0 0 1 0 1 0 3 12 12
Light Van 0 0 0 0 0 0 0 0 0 0 0 0 0 0
& Utility
Medium 1 0 0 0 0 1 0 0 0 0 0 0 2 5
Lorry &
Heavy Van
Heavy 1 0 0 0 0 1 0 0 0 0 0 0 2 6
Lorry
Bus 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Motorcycle 1 0 1 5 3 1 0 3 2 1 1 2 20 15
TOTAL 36 38
Direction D
Time Pcu
(min) / hr
5 10 15 20 25 30 35 40 45 50 55 60 TOTAL
Vehicle
Cars & Taxi 3 3 0 0 0 1 1 1 0 1 2 3 15 15
Light Van 0 0 0 0 0 0 0 1 0 0 1 0 2 4
& Utility
Medium 0 0 1 0 0 0 0 0 0 0 0 0 1 2.5
Lorry &
Heavy Van
Heavy 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lorry
Bus 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Motorcycle 0 0 3 1 2 3 0 0 0 0 0 0 0 0
TOTAL 18 21.5
Direction E
Time Pcu
(min) / hr
5 10 15 20 25 30 35 40 45 50 55 60 TOTAL
Vehicle
Cars & Taxi 1 1 0 0 0 0 2 0 0 1 0 0 4 4
Light Van 0 0 0 0 0 0 0 0 0 0 0 0 0 0
& Utility
Medium 0 0 0 0 0 0 0 0 1 0 0 0 1 2.5
Lorry &
Heavy Van
Heavy 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lorry
Bus 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Motorcycle 0 0 1 0 0 1 0 1 0 0 0 0 3 2.25
TOTAL 8 8.75
Direction F
Time Pcu
(min) / hr
5 10 15 20 25 30 35 40 45 50 55 60 TOTAL
Vehicle
Cars & Taxi 0 0 0 1 1 0 0 0 0 0 0 0 2 2
Light Van 0 0 1 0 0 0 1 0 0 0 0 0 2 4
& Utility
Medium 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lorry &
Heavy Van
Heavy 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lorry
Bus 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Motorcycle 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 4 6
Time
(min)
5 10 15 20 25 30 35 40 45 50 55 60
Vehicle
Cars & Taxi 66 49 68 62 53 59 59 61 52 85 59 79
Light Van 1 0 4 3 2 1 2 4 4 1 3 1
& Utility
Medium 2 1 1 0 2 2 1 0 1 0 1 2
Lorry &
Heavy Van
Heavy 1 0 0 0 0 1 0 0 0 0 0 0
Lorry
Bus 2 1 3 1 3 1 2 1 3 5 1 1
Motorcycle 39 47 50 76 65 69 50 36 57 31 39 44
Time pcu
10.45 – 10.50 111.25
10.50 – 10.55 89.75 326
10.55 – 11.00 125
11.00 – 11.05 128
11.05 – 11.10 119.75 371.5
11.10 – 11.15 123.75
11.15 – 11.20 109
11.20 – 11.25 99 322.25
11.25 – 11.30 114.25
11.30 – 11.35 125.25
11.35 – 11.40 99.75 347
11.40 – 11.45 122
TOTAL 1366.75
The peak hour volume is just the sum of the volumes of the four 15 minute intervals within
the peak hour (1366.75 pcu). The peak 15 minute volume is 371.5 pcu in this case. The peak
hour factor (PHF) is found by dividing the peak hour volume by four times the peak 15
minute volume.
The actual (design) flow rate can be calculated by dividing the peak hour volume by the PHF,
1366.75/0.92 = 1485.6 pcu/hr, or by multiplying the peak 15 minute volume by four, 4 *
371.5 = 1486 pcu/hr. (proven)