SL.NO WORK DETAIL QUANTIY UNIT RATE/UNIT AMOUNT TOTAL
1 DISMANTILING WORK A Removal of Existing Parking stones Up to kitchen wall. B 36’ length existing compound wall including gate. Up to basement. C First floor railing 37’ removing. D Existing duplex house bedroom east and west wall, attached toilet walls including wall tiles and floor tiles. E Lift area (5’x3’)approximate slab cutting. F Second floor wash area back side wall. 65000.00 2 EARTH WORK EXCAVATION 792.00 CFT 15.00 11880.00 3 New compound wall construction from existing basement work including 8’ gate and 2nd gate hold 180.00 SQFT 475.00 85500.00 fasts including painting 4 South side compound wall plastering work one coat. 244.00 SQFT 45.00 10980.00 5 Kitchen open design and lift back side walls construction including plastering 104 SQFT 245.00 25480.00 6 PAINTING WORK A First floor first floor single coat paint only wall colors (existing) B Second floor rental portion wall colors one coat(existing) C Ground floor north and east walls one coat existing paint including ceilings D Polish work one coat at ground floor (2 windows and one main door) 87000.00 7 Granite work at ground floor (Granite cost sqft Rs 70/-) including tax, loading, unloading laying and 450.00 SQFT 135.00 60750.00 8 PCC bedding 4” thick work for granite floor 150.00 SQFT 154.00 23100.00 9 Grill work at first floor entrance area and ground floor steps entrance 300.00 SQFT 85.00 25500.00 10 Lift work 2sides 4.5 inches wall extensions for 3 floors. Lift room bottom slab(36sqft) and top slab(120 sqft) 156.00 SQFT 1000.00 156000.00 11 6 nos of dummy columns at terrace level 6 EACH 1000.00 6000.00 12 Rental portion two numbers toilet door shutters replacement with new ones with paint (existing hard ware will be re used) 2 EACH 4800.00 9600.00 13 One Indian WC replacing in rental portion at second floor 1 EACH 1800.00 1800.00 14 Lift room bottom well and side walls along with 9” wall 5’ height surrounding the lift well including earth work excavation 90 SFT 208.00 18720.00 596310.00 Add 12% towards service charge 71557.20 667867.20 12 First floor new work 730 SQFT 1150.00 839500.00 839500.00 13 False ceiling work at new portion 700.00 SQFT 110.00 77000.00 77000.00 14 1584367.20