1 Bus Name Protective Bus Bus Bus Prot Dev Prot Dev
2 Device kV Bolted Arcing Bolted Arcing
3 Name Fault Fault Fault Fault
4 (kA) (kA) (kA) (kA)
5 MLTP SWBD MLTP CB 0.415 54.91 29.80 49.85 27.05
12
13
14
H I K L M N O P Q
1 Trip/ Breaker Equip Electrode Box Box Box Gap Arc
2 Delay Opening Type Config Width Height Depth (mm) Flash
3 Time Time/Tol (in) (in) (in) Boundary
4 (sec.) (sec.) (in)
5 0.32 0.0000 PNL VCB 12 14 10 25 116
11
12
13
14
R S T U V W
1 Working Incident PPE Level / Notes (*N) Label # Cable Length Incident
2 Distance Energy From Trip Device Energy
3 (in) (cal/cm2) (m) at Low
4 Marginal
5 18 23.5 (*N21a) # 0002
6 36 6.47 # 0001
(*N21a) - Equipment
Evaluation Failed,
OVERDUTIED
PROTECTIVE DEVICE
EQUIPMENT FOUND -
13 Inappropriate to provide
arc-flash hazard results.
11
12
13
14