You are on page 1of 6

Wilkinson Eyre Architects

Gifford and Partners


(Structural engineer)
CATEGORY : ROTATING CABLE-STAYED STEEL-ARCH BRIDGE

Gateshead Millennium
Bridge (Baltic Millennium Bridge)

WORLD’S FIRST ROTATING BRIDGE


Newcastle Gateshead

RIVER TYNE

DHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_INTRO


DHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_INTRO
HYDRAULIC
POWERED BY ACTUATORS
8 ELECTRIC
MOTORS

CROSS SECTION THROUGH END SUPPORT,


SHOWING LOCATIN OF 450 MM DIA OPENING RAMS

CROSS SECTION OF CURVED PEDESTRIAN


AND CYCLE DECK, SHOWING STEEL BENCH

18
45 M HIGH

4 min/OPENING

Rs 300/OPENING
30 m deep foundation

unsorted glacial sediment

LONGITUDINAL SECTION OF THE BRIDGE


SHOWING UNDERLYING FISSURED COAL MEASURES
DHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_SCHEMATIC
PARKING AT THE SIDES

PARKING AT THE SIDES

The concept of the rotating bridge was a reaction to three main design constraints:
1. The bridge should be 4.5m above the spring high tides in its closed position.
2. Nothing was to be built on the Gateshead quayside.
3. The deck should have a maximum slope of 1:20 to allow for disabled access.

DHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_CONSTRUCTION


STRESS LEVELS AT DIFFERENT PARTS OF THE PARABOLA

DHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_FABRICATION


DHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_STRUCTURAL INFO