Training Duration: 202 Hours (26 Days) – (8 Hours/Day)
FACILITIES / TOOLS VENUE [WORKSTATION DATE AND
TRAINING ACTIVITY TRAINEE REMARKS AND EQUIPMENT / AREA] TIME
LO1. Study approved
Modules plumbing plan Plumbing Plans PREPARE ESTIMATION OF MATERIALS FOR LO2. Estimate and Plumbing Materials MULTIPLE PLUMBING finalize materials take- Plumbing Tools UNITS. off Plumbing Equipment PPE
LO1. Prepare materials
for drainage,sanitary, Modules vent and waterline layout work.
LO2. Install pipes and
fittings for drainage, Plumbing Plans sanitary, vent and waterline layout PERFORM MULTIPLE LO3. Install cold water PLUMBING UNITS system and multi-point Plumbing Materials INSTALLATION AND water heater for hot- ASSEMBLIES water supply lines
LO4. Install building
drains, sewer and Plumbing Tools ventilation
LO5. Mount and layout
Plumbing Equipment plumbing fixtures and accessories PPE LO1. Prepare conducting pipe leak Modules testing
Plumbing Plans CONDUCT PIPE LEAK
TESTING LO2. Perform pipe leak Plumbing Materials testing Plumbing Tools Plumbing Equipment PPE LO1. Repair defective pipes, fittings and Modules plumbing fixtures PERFORM PLUMBING Plumbing Plans REPAIR AND LO2. Clear clogged pipes Plumbing Materials MAINTENANCE and drains Plumbing Tools Plumbing Equipment PPE
Date Started: JJANUARY 2, 2017
Date Ended: FFEBRUARY 6, 2017 Alimudin D. Kasan Trainer