SOIL INVESTIGATION:

1. ALL DIMENSION ARE IN MILIMETERS UNLESS OTHERWISE STATED.

2. GENERAL

2.1 THE SOIL INVESTIGATION (SI) DATA PROVIDED IS FOR INFORMATION ONLY. CONFIRMATORY
INVESTIGATION AND PROBING DURING CONSTRUCTION STAGE SHALL BE CARRIED OUT TO CONFIRM
THE SI DATA.

3. UTILITIES DETECTION

3.1 TO AVOID DAMAGE OF THE EXISTING UNDERGROUND UTILITIES, AT LOCATION WHERE CONFIRMATORY
INVESTIGATION AND PROBING IS REQUIRED DURING CONSTRUCTION STAGE, THE PRESENCE OF THE
UTILITIES SHALL BE CHECKED BEFORE COMMENCEMENT OF WORK.

LEGEND:

BOREHOLE LOCATION

REV. DATE DESCRIPTION APP. PROJECT BY : SCALE :

DRAWING TITLE :

DRAWING NO. : REV. :


LEGEND :

SIMPLIFIED BORELOG :

SOIL INVESTIGATION:
1. ALL DIMENSION ARE IN MILIMETERS UNLESS OTHERWISE STATED.

2. GENERAL

2.1 THE SOIL INVESTIGATION (SI) DATA PROVIDED IS FOR INFORMATION ONLY. CONFIRMATORY
INVESTIGATION AND PROBING DURING CONSTRUCTION STAGE SHALL BE CARRIED OUT TO CONFIRM
THE SI DATA.

3. UTILITIES DETECTION

3.1 TO AVOID DAMAGE OF THE EXISTING UNDERGROUND UTILITIES, AT LOCATION WHERE CONFIRMATORY
INVESTIGATION AND PROBING IS REQUIRED DURING CONSTRUCTION STAGE, THE PRESENCE OF THE
UTILITIES SHALL BE CHECKED BEFORE COMMENCEMENT OF WORK.