The Engineer shall assess the Contractor’s proposal and provide further advice and

instructions to assure that such program works well. The Engineer needs to establish a
closer inspection and quality control system for the catch-up program. Any extra cost for
the construction supervision, including overtime and holiday work allowances, shall be
charged to the Contractor.

6 - 32 Road Project Management and Supervision Manual Vol.1 Main Text