You are on page 1of 5

Lampiran Nomor SPK.

68/LMB-Shower Stainless/RoUm/BNPB/VIII/2019
Tanggal : 1 Agustus 2019

PEKERJAAN BELANJA SHOWER STAINLESS THX 20 TOTO GEDUNG GRAHA BNPB PRAMUKA
TAHUN ANGGARAN 2019

NO JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN HARGA


A BELANJA SHOWER STAINLESS THX 20 TOTO 150 PCS 650,000 97,500,000

JUMLAH 97,500,000
PPN 10% 9,750,000
TOTAL 107,250,000

CV. LASKAR MEGA BINTANG Pejabat Pembuat Komitmen,


Direktur di Lingkungan Biro Umum BNPB

SUHARDIMAN dr. Bagus Tjahjono, M.P.H.


NIP. 19591122 201312 1 001
Progres Pekerjaan Belanja Shower Stainless Thx 20 Toto Gedung Graha BNPB Pramuka Tahun Anggaran 2019
CV LASKAR MEGA BINTANG
Surat Perintah Kerja Nomor : SPK. 068/LMB-Shower Stainless/RoUm/BNPB/VII/2019
Tanggal Surat Perintah Kerja : 29 Juli 2019

NO JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN HARGA

A PEMASANGAN RANGKA KANOPI STAINLESS STEEL


1 Pipa 4" tebal 1,5mm 8 batang 1,750,000 14,000,000
2 hollow 20x40x1,2mm 10 batang 860,000 8,600,000
3 Kawat seling 40 meter 90000 3,600,000
TOTAL 26,200,000
B PEMASANGAN ATAP KANOPI
1 Kaca 10 mm Temperred 55 m2 1,200,000 66,000,000

TOTAL 66,000,000
C PEMASANGAN TALANG WATER DRAIN
1 Plat ss 1,2mm 3 lembar 3,450,000 10,350,000
2 Pipa ppc 2" 4 batang 260,000 1,040,000
3 Lem ppc 1 kaleng 300,000 300,000
TOTAL 11,690,000
D CIVIL PEMASANGAN ANGKUR KAKI TIANG
1 Pasir cor 5 kubik 360,000 1,800,000
2 Batu split 1 kubik 1,500,000 1,500,000
3 Semen 11 sak 60,000 660,000
4 Besi cor 12mm 9 batang 775,000 6,975,000
5 Angkur Drat 16x1000mm 24 pcs 96,000 2,304,000
6 Base plate ss 10x300mm 8 pcs 290,000 2,320,000
TOTAL 15,559,000
E PERSIAPAN
1 Mob demob 00 1 lot 3,000,000
TOTAL 3,000,000
F ALAT PENUNJANG KERJA
1 Konsumebel matrial 1 lot 9,000,000 9,000,000
2 Jasa kerja 135 m2 245,000 33,075,000
TOTAL 42,075,000

JUMLAH A+B+C+D+E+F 164,524,000


PPN 10% 16,452,400
TOTAL 180,976,400

TIM PANITIA PEMERIKSA DAN PENERIMA BARANG/JASA


KONTRUKSI DAN NON KONTRUKSI DI LINGKUNGAN
SEKRETARIS UTAMA TA 2019
DENGAN NILAI DIBAWAH 200 JUTA

1 Anita Puspitasari, S.E. Ketua


2 Joko Purnomo Sekretaris

3 Adam Malik Anggota


B Pramuka Tahun Anggaran 2019

oUm/BNPB/VII/2019

Kemajuan Pekerjaan
Bobot
Pekerjaan Kemajuan

7.736 8 batang 7.736


4.752 10 batang 4.752
1.989 40 meter 1.989

36.469 55 m2 36.469

5.719 3 lembar 5.719 180,976,400


0.575 4 batang 0.575
0.166 1 kaleng 0.166

0.995 5 kubik 0.995


0.829 1 kubik 0.829
0.365 11 sak 0.365
3.854 9 batang 3.854
1.273 24 pcs 1.273
1.282 8 pcs 1.282

1.658 00 1 lot

4.973 1 lot 4.973


18.276 135 m2 18.276

100.000

SUB TOTAL 100.000


TOTAL KEMAJUAN PEKERJAAN 100.000
Jakarta, 22 Mei 2019
A

……………………………………..
……………………………………..

……………………………………..

You might also like