Project: GOLDEN WESTLAKE

Date: 7/17/2006 0:00


No. QWW.716.06
Brand (To be Total Total Value-added
Total
Item Description completed by Unit Qty Material Labour tax
[US$]
tenderer) [US$] [US$] [US$]

MECHANICAL AND ELECTRICAL SERVICES TOTAL

B5 Sewage Treatment Plant


Sewage treatment plant - EXCLUDING CIVIL WORKS AS PER SPECIFICATION lot 1
Ebara
1 3
Wastewater pump (Equalization tank) Q = 2m /h, H = 8m, 3/4Hp, submersible, stainless steel Japan set 2 500 50.0 1100.00
Ebara
2
Sludge pump (Sludge tank) Q = 2m3/h, H = 8m, 3/4Hp, submersible, stainless steel Japan set 2 500 50.0 1100.00
Ebara
3 3
Wastewater pump (Disinfection tank) Q = 2m /h, H = 8m, 3/4Hp, submersible, stainless steel Japan set 2 500 50.0 1100.00
4 Motor + reducer (Settling tank) 1.1kw Austria set 1 900 90.0 990.00
5 The culture of microorganism MicroS + MicroD Vietnam liter 100 12 1.2 1320.00
6 Contact media of aeration tank PVC/ Stainless steel cable Vietnam m3 22 127 12.7 3073.40
Vietnam 2
7 Support of contact media of aeration tank Stainless steel m 44 80 8.0 3872.00
Air blower for Equalization tank and
8
Aeration tank Q = 2.28m3/min, 40kPa, 3Kw Japan set 2 1,800 180.0 3960.00
10 Diffuser system Diffuser disk Diameter 300mm Vietnam set 23 32 3.2 809.60
Chemfeed
11
Chemical dosing pump Q = 30l/h, P = 30Psi USA set 1 600 60.0 660.00
12 Chemical tank 500lít, Plastic Vietnam set 1 94 9.4 103.40
Heilea
13
Air blower for chemical mixing 480W, 1 pha, 60/50Hz China set 1 250 25.0 275.00
Emec
14
ORP controller Range 0:1000mV, 7W Italia set 1 1,250 125.0 1375.00
15 Electrical system Wires, cable, control panel, accessories Korea/Vietnam set 1 750 75.0 825.00
16 Pipe line system Pipe, fittings accessories Stainless steel Vietnam set 1 1,565 156.5 1721.50
17 Transportation time 1 312.7 31.3 343.97
Operation guidance, technological transfer, operation
18
Start up running, Operation training training (excluding cost of chemicals for testing operation) time 1 500.0 50.0 550.00
19 Labor cost time 1 939 93.9 1032.90
20 Setting up revised files Measuring, checking and taking over the project time 1 626 62.6 688.60

Note: TOTAL AMOUNT 24,900 USD


1. Equipment status: brand new 2. Excluding VAT (10 %) 3. Warranty 12 months
4. Installation time: 2 months 5. Validity: 60 days from today's date US dollar twenty four thousand nine hundred only
6.Treated wastewater standard: 5945-1995 class 2 and World Bank-discharge to surface waters

ORDER APPROVAL VIETNAM GREEN ENVIRONMENT CO., LTD


DIRECTOR

GWL - BOQ - Sewage Treatment Plant STP Page 1 of 1 of E1 7/19/2006