ABSENSI
Jumlah Karyawan Hadir PEMAKAIN KWH LISTRIK & M3 AIR SERAH TERIMA KOMENTAR
Sakit Genset No.1 KWH
Cuti / PC Genset No.2 KWH
Izin / P1 Genset No.3 KWH
Dinas Luar Turbine No.1 KWH Mandor Proses 1 Mandor Proses 2
Mangkir Turbine No.2 KWH
Total Karyawan Air Boiler M³
Air Domestik M³
Air Proses M³
Air Per. Pabrik M³
Air Per. Kebun M³ Asst.Proses 1 Asst.Proses 2 Mill Manager
PT PATIWARE
PABRIK SUNGAI ADONG
Desa Sungai Raya kepulauan
Kabupaten Bengkayang - Kalimantan Barat
STRERILIZER LOGSHEET
HARI :
TANGGAL :
JAM MASUK STEAM WAKTU REBUSA ( MENIT ) TOTAL WAKTU STEAM KELUAR
REBUSAN NO
NO TBS MASUK RFEBUSAN JAM TBS KELUAR REBUSAN JUMLAH REBUSAN KETERANGAN
PEAK 1 PEAK 2 C
1 2 JAM
LOGSHEET BOILER
:
:
WATER STEAM STEAM DRAUGHT GAUGE FLO GAS CHECKS SOOT FEED BOILER FEED PUM I.D.F S.A.F F.D.F
FLOW PREASURE TEMP EXIT WATER GAUGE FLOAT CONTROL BLOWER TANK BLOWDOWN AMPERE AMPERE AMPERE AMPERE
JAM KETERANGAN
METER 1 2 3 4 TEMP TEMP MENIT/DETIK
PEMERIKSAAN SEBELUM ST PEMERIKSAAN SESUDAH HIDUP ANGKA BATASAN KETERANGAN : TOTAL HARI INI
Persediaan Bahan Bakar Kebocoran Steam - W.P : 20 BAR - On Line : - Jam Kerja
Persediaan Air Umpan Kebocoran Air Umpan - F.W Temp : 95 'C - Off Line : - Steam
Persediaan Bahan Kimia Kondiasi gas asap keluar - O.Gas Temp : 280 'C - Jam Start : - B.Kimia
Keadaan Air Umpan Kebocoran Vawe - A.S.EV 27 tons/hr - Jam Berhant : - B.Kimia Per Jam
Keadaan Dapur ( abu ) Getaran ID Fan - Shift 1 Operator 1: - Feed water Per Jam
Keadaan feed pump Operator 2: - B.Kimia Per Steam
Keadaan Semu Fan Operator 3:
Keadaan Dust Collector - Shift 1 Operator 1: SAMPAI DENGAN HARI INI
Keadaan Abu Chimney Operator 2: - Jam Kerja
Keadaan soot Blower Operator 3: - Steam
Keadaan Posisi damper - B.Kimia
- B.Kimia Per Jam
- Feed water Per Jam
Operator shift 1 - 2 Asst. Shift 1 Asst. Shift 2 Mill Manager - B.Kimia Per Steam
v v
PT PATIWARE
PABRIK SUNGAI ADONG
Desa Sungai Raya kepulauan
Kabupaten Bengkayang - Kalimantan Barat
LOGSHEET PRESS
KERNEL LOGSHEET
HARI :
TANGGAL :
JAM KERJA MESIN
NAMA MESIN KETERANGAN
START STOP TOTAL
DEPERICARPER
CAKE BREAKER CONVEYOR NO. 1
CAKE BREAKER CONVEYOR NO. 2
RIPPLE MILL NO. 1
RIPPLE MILL NO. 2
RIPPLE MILL NO. 3
CLAYBATH
START OLAH :
STOP OLAH :
soport check
Agar dilakukan setiap hari
PEMERIKSAAN SEBELUM START PEMERIKSAAN SESUDAH START ANGGKA BATASAN KETERANGAN TOTAL HARI INI
Pemanasan 15 Menit Kebocoran Oli - Jam Start : HM :
Air Pendingin Kebocoran Air Pendingin - Jam Stop : KWH :
Sirkulasi Air Pendingin Baut Dan Mur Yang Longgar - Regu I Opr I : KWh Per Jam :
Pembuangan Condensate Suara Suara Aneh Dari Turbine - PRM : 5.000 Opr II :
Sirkulasi Minyak Pelumas Voltase RS, ST, TR - Frequenci : 50 Hz - Regu II Opr I : SAMPAI DENGAN HI
Baut Dan Mur Yang Longgar Volase RS, ST, TN - PF : 0.8- 0.09 Opr II : HM :
Sirkuit Breaker Posisi Off Steam Inlet - Tek. Steam Max : 20 Kg/ Cm2 - Regu III Opr I : KWH :
Voltase Switch Posisi Off Steam Outlet Min : 17 Kg/ Cm2 Opr II : KWh Per Jam :
Ampere Switch Posisi Off Kebocoran Steam Pada Pipa - Paralel Jam :
Charge Over Switch Posisi Off - Lama Paralel :
OPR SHIFT 1 OPR SHIFT 2 ASST SHIFT 1 ASST SHIFT 2 MILL MANAGER
PT PATIWARE
PABRIK SUNGAI ADONG
Desa Sungai Raya kepulauan
Kabupaten Bengkayang - Kalimantan Barat
LOGSHEET GE
ASST.SHIFT 1 ASST.SHIFT 2
GSHEET GENSET PERKINS 550 KVA
HARI
TANGGAL
AMPERE PENGE-
HZ PF KWH METER KW SOLAR LUARAN
S T
SOLAR
lepas : Gandeng : lepas : Gandeng : lepas : Gandeng : lepas : Gandeng :
MILL MANAGER
:
:
KETERANGAN
TOTAL HARI INI
JAM KERJA
KWH
KWH PER JAM
SAMPAI DENGAN HI
JAM KERJA
KWH
KWH PER JAM
PT PATIWARE
PABRIK SUNGAI ADONG
Desa Sungai Raya kepulauan
Kabupaten Bengkayang - Kalimantan Barat
PEMERIKSAAN SEBELUM START PEMERIKSAAN SESUDAH HIDUP ANGKA BATASAN KETERANGAN TOTAL HARI INI
JUMLAH OIL MESIN KEBOCORAN OIL - RPM : - JAM START : JAM KERJA
KEADAAN OIL MESIN KEBOCORAN AIR PENDINGIN - HZ : - JAM STOP : KWH
JUMLAH AIR PENDINGIN BAUT DAN MUR YANG LONGGAR - PF : HIFF 1 : KWH PER JAM
PERSEDIAAN SOLAR SUARA-SAURA ANEH DARI MESIN :
AIR BATERRAY VOLTASE RS,ST,TR SHIFF 2 : SAMPAI DENGAN HI
: JAM KERJA
: KWH
: KWH PER JAM
LOGSHEET CLARIFIKASI
HARI :
TANGGAL :
JAM ISI CST TEMP OIL TANK TEMP SLUDGE TANK PRECLEANER PUM VIBRATING SCREEN DECANTER BUFFER TANK
START CM (C) CM (C) ISI (CM) TEMP(C) 01 (AMP) 02(AMP) 01(AMP) 02(AMP) AMP M3 TEMP(C) ISI(CM) TEMP(C)
A A WASH WASH
PEMAKAIAN AIR SIANG PEMAKAIN CHEMICAL SIANG
DOMESTIK m³ :
PERUMAHAN PABRIK m³ :
PROSES m³ :
BOILER m³ :
DOMESTIK m³ :
PERUMAHAN PABRIK m³ :
PERUMAHAN KEBUN m³ :
catatan :
LOGSHEET USB
Tanggal :
Hari :
JAM REB 01 REB 02 REB 03 TOTAL
JANJANG JANJANG JANJANG JANJANG
catatan :
TOTAL PENGUTIPAN
SHIFF 1 :
SHIFF 2 :
KERUSAKAN
Mill Manager
PT PATIWARE
PABRIK SUNGAI ADONG
Desa Sungai Raya kepulauan
Kabupaten Bengkayang - Kalimantan Barat
KETERANGAN/KERUSAKAN
HM STAST :
HM STOP :
MILL MANAGER
PT PATIWARE
PABRIK SUNGAI ADONG
Desa Sungai Raya kepulauan
Kabupaten Bengkayang - Kalimantan Barat
LAPORAN PEMAKAIAN SOLAR
Date :
Keterangan :
Pemakaian Solar : s/d
Genset 550 KVA : jam x Liter = Liter HM G.550 KVA
Genset 200 KVA : jam x Liter = Liter HM G.200 KVA
Total Solar = Liter HM TURBINE
Keterangan :
Pemakaian Solar : s/d
Genset 550 KVA : jam x Liter = Liter HM G.550 KVA
Genset 200 KVA : jam x Liter = Liter HM G.200 KVA
Total Solar = Liter HM TURBINE
Keterangan :
Pemakaian Solar : s/d
Genset 550 KVA : jam x Liter = Liter HM G.550 KVA
Genset 200 KVA : jam x Liter = Liter HM G.200 KVA
Total Solar = Liter HM TURBINE
Keterangan :
Pemakaian Solar : s/d
Genset 550 KVA : jam x Liter = Liter HM G.550 KVA
Genset 200 KVA : jam x Liter = Liter HM G.200 KVA
Total Solar = Liter HM TURBINE
Keterangan :
Pemakaian Solar : s/d
Genset 550 KVA : jam x Liter = Liter HM G.550 KVA
Genset 200 KVA : jam x Liter = Liter HM G.200 KVA
Total Solar = Liter HM TURBINE
Keterangan :
Pemakaian Solar : s/d
Genset 550 KVA : jam x Liter = Liter HM G.550 KVA
Genset 200 KVA : jam x Liter = Liter HM G.200 KVA
Total Solar = Liter HM TURBINE
Mill Manager