You are on page 1of 31

SCTV BUILDING MANAGEMENT

DAILY CHECK UPS SYSTEM MERLIN GE


DEPARTEMENT ENGINEERING

VOLTAGE
POWER Frequency PF
Phase to Phase Phase To Neutral
Shift Time
M1 M2 Load M2 Load Power ( kVA ) Hz
LOAD
U12 U23 U31 U12 U23 U31 U12 U23 U31 V1 V2 V3 V1 V2 V3 P1 P2 P3 M1 M2 INV

08.00

10.00
I
12.00

14.00

16.00

18.00
II
20.00

22.00

24.00

02.00
III
04.00

06.00

VOLTAGE
POWER Frequency PF
Phase to Phase Phase To Neutral
Shift Time
M1 M2 Load M2 Load Power ( kVA ) Hz
LOAD
U12 U23 U31 U12 U23 U31 U12 U23 U31 V1 V2 V3 V1 V2 V3 P1 P2 P3 M1 M2 INV
08.00

10.00
I
12.00

14.00

16.00

18.00
II
20.00

22.00

24.00

02.00
III
04.00

06.00
Tanggal :

CHECK UPS SYSTEM MERLIN GERIN


MG I

CURRENT BATTERY

Load (A) I Load ( % ) U I T Back Up


PU/PN Load
Time
(%) Protected
I1 I2 I3 I1 I2 I3 (V) (A) ( C)
0 (min)

MG II

CURRENT BATTERY

Load (A) I Load ( % ) U I T Back Up


PU/PN Load
Time
(%) Protected
I1 I2 I3 I1 I2 I3 (V) (A) ( C)
0 (min)
Tangga
SCTV BUILDING MANAGEMENT
DAILY CHECK UPS VEKTOR / BROADCAST
DEPARTEMENT ENGINEERING
Battery
Frekquency (Hz) Current (A) Voltage Power
Battery Out Put Current (A)
Shif Time Run Batt. Dis. Rectifier (Volt) By Pass (Volt) Out Put (Volt) Active (kW) Reaktif (KVARh) Appar
Time Out Put By Pass Volt Charg Charg R S T R S T R S T R S T R S T R S T R

08:00

10:00
1
12:00

14:00

16:00

18:00
2
20:00

22:00

24:00

02:00
3
04:00

06:00

Frekquency (Hz) Current (A) Voltage Power


Battery Battery Out Put Current (A)
Shif Time Run Volt Batt. Dis. Rectifier (Volt) By Pass (Volt) Out Put (Volt) Active (kW) Reaktif (KVARh) Appar
Time Out Put By Pass
Charg Charg R S T R S T R S T R S T R S T R S T R

08:00

10:00
1
12:00
14:00

16:00

18:00
2
20:00

22:00

24:00

02:00
3
04:00

06:00

Frekquency (Hz) Current (A) Voltage Power


Battery Battery Out Put Current (A)
Shif Time Run Volt Batt. Dis. Rectifier (Volt) By Pass (Volt) Out Put (Volt) Active (kW) Reaktif (KVARh) Appar
Time Out Put By Pass
Charg Charg R S T R S T R S T R S T R S T R S T R

08:00

10:00
1
12:00

14:00

16:00

18:00
2
20:00

22:00
24:00

02:00
3
04:00

06:00

Frekquency (Hz) Current (A) Voltage Power


Battery Battery
Out Put Current (A)
Shif Time Run Rectifier (Volt) By Pass (Volt) Out Put (Volt) Active (kW) Reaktif (KVARh) Appar
Time Out Put By Pass Volt Batt. Dis.
Charg Charg
R S T R S T R S T R S T R S T R S T R

08:00

10:00
1
12:00

14:00

16:00

18:00
2
20:00

22:00

24:00

02:00
3
04:00

06:00
Tanggal :

VEKTOR I
Power Batt.
Out Put Power (%) Cap Load
Apparent (KVA) Temp Status
S T R S T %

VEKTOR II
Power Batt.
Out Put Power (%) Cap Load
Apparent (KVA) Temp Status
S T R S T %
VEKTOR III
Power Batt.
Out Put Power (%) Cap Load
Apparent (KVA) Temp Status
S T R S T %
VEKTOR IV
Power Batt.
Out Put Power (%) Cap Load
Apparent (KVA) Temp Status
S T R S T %
SCTV BUILDING MANAGEMENT
DAILY CHECK
DEPARTEMENT ENGINEERING
Medium Voltage LVMDP I
Shif Time Volt Arus Counter Voltage Current Load Counter
(KV) (I) WBP LWBP R-S R-T S-T R-N S-N T-N R S T (A) Kwh R-S

08:00

10:00

12:00

14:00

16:00

18:00

20:00
22:00

24:00

02:00

04:00

06:00

Water Consumtion
Time Time
Make Up Water By Pass Roof WBP

8:00 8:00
Tanggal :
DAILY CHECK ENERGY

LVMDP II
Voltage Current Load Counter
R-T S-T R-N S-N T-N R S T (A) Kwh
Meter Indigo 80189355
WBP LWBP KvArh
Tanggal :
SCTV BUILDING MANAGEMENT
DAILY CHECK TRAFFO
DEPARTEMENT ENGINEERING

Trafo I Trafo II Trafo III


Shift Time Keterangan
Temp (°C) Load ( Ampere ) Temp (°C) Load ( Ampere ) Temp (°C) Load ( Ampere )
08:00

10:00
I
12:00

14:00

16:00

18:00
II
20:00

22:00

24:00

02:00
III
04:00

06:00

PETUGAS Checker By Approved By Chief


Supervisor Engineer
Shift 1 Shift 2 Shift 3
SCTV BUILDING MANAGEMENT
RUNNING CHILLER
DEPARTEMENT ENGINEERING

Running Time
Parameter Unit
8:00 10:00 12:00 14:00 16:00 18:00 20:00

Active Spt.

Leaving Evap. Temp

Entering Evap. Temp

Leaving Cond. Temp

Entering Cond. Temp

Separator Oil Level

SYSTEM 1

Disch. Superheat

Discharge Temp.

Saturated Cond.

Saturated Evap.

Discharge Press.

Suction Press.

Oil Press

Net. Press.

Capasity

Running Hour Chiller SHIFT I : SHIFT II :


SYSTEM 2

Disch. Superheat

Discharge Temp.

Saturated Cond.

Saturated Evap.

Discharge Press.

Suction Press.

Oil Press

Net. Press.

Capasity

Running Hour Chiller SHIFT I : SHIFT II :


R

Voltage S

Ampere S

CB S
(Ampere)
T

Evap In
Chiller
Evap Out

Cond. In
Pressure
Cond. Out

Fan CT Status
CHWP Status
Pressure
CWP Status
Pressure
Meter PDAM

Level Reserv (cell)


Tanggal :
RUNNING CHILLER

Running Time
22:00 0:00 2:00 4:00 6:00

FT II : SHIFT III :

FT II : SHIFT III :
CHECK LIST PERAWATAN PANEL LISTRIK
(LVMDP & CAPASITOR )
Kondisi
No. Uraian Pekerjaan
Baik Tidak
A. PANEL LISTRIK
1 Perksa kondisi lampu Indikator
2 Periksa kondisi Volt meter
3 Periksa kondisi Ampere meter
4 Periksa kondisi Watt meter
5 Periksa kondisi KWH meter
6 Periksa kondisi Frekuensi meter
7 Periksa kondisi tombol ( PB ) on / off
8 Periksa kondisi fuse / MCB / MCCB / ACB
9 Periksa kondisi selector Switch
10 Periksa kondisi Handle pintu dan kunci panel
11 Periksa instalasi wiring ( Wiring diagram )
12 Periksa kondisi kabel dan kabel skun
13 Periksa dan kencangkan baut pada semua terminal
( Usahakan panel dipadamkan )
Periksa kondisi kontaktor dan suara yang tidak normal
14
15 Periksa kondisi relay kontrol
16 Periksa kondisi pengatur waktu / timer
17 Periksa dan kebersihan seluruh dinding panel listrik
dan seluruh peralatan dalam panel ( usahakan panel
dipadamkan )

Periksa dan ukur incoming Voltage


R: V
18
S: V
T: V
Periksa dan ukur pemakaian beban (Incoming)
R: A
19
S: A
T: A
20 Periksa dan ukur pemakaian beban (Outgoing)
R: A
S: A
T: A

21 Periksa kebersihan area ruangan panel


B. CAPASITOR BANK
1 Periksa Indicator Faktor daya / Cos Phi
2 Periksa fungsi Lampu Indicator
3 Periksa fungsi Tombol on/off ( PB )
4 Periksa Kondisi Fuse
5 Periksa Wiring / cabel instalasi
6 Koneksi kabel
7 Periksa fungsi Exhaust Fan
8 Cek arus & tegangan kapasitor
9 Periksa Temperatur pada terminasi & Kabel Instalasi
10 Periksa pisik Kapasitor

Catatan :

Mengetahui Supervisor

(……………………………….) (…………………….)
No. Dokumen F: ENG
Departemen Engineering
Berlaku Efektif Agustus 2016 01
IK Revisi 00
Halaman dari 1 1

Keterangan
Teknisi

(. …………………….)
Check List Capasitor Bank Panel LVMDP

Project / Site :

LVMDP 1 Schneider (750 kVAr) Tanggal :

Indikator Lamp
Cos Phi Kabel Kondisi
Shift Time Terminasi
(Φ) Instalasi All Fuse
Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8

8:00

10:00
1
12:00

14:00

16:00

18:00
2
20:00

22:00

0:00

2:00
3
4:00

6:00
Check List Capasitor Bank Panel LVMDP

LVMDP 2 Schneider (450 kVAr)

Indikator Lamp
Cos Phi Kabel Kondisi
Shift Time Terminasi
(Φ) Instalasi All Fuse
Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8

8:00

10:00
1
12:00

14:00

16:00

18:00
2
20:00

22:00

0:00

2:00
3
3
4:00

6:00
Supervisor Engineering :

(………………………….)
pasitor Bank Panel LVMDP

Kebersihan Keterangan
pasitor Bank Panel LVMDP

Kebersihan Keterangan

You might also like