Professional Documents
Culture Documents
VOLTAGE
POWER Frequency PF
Phase to Phase Phase To Neutral
Shift Time
M1 M2 Load M2 Load Power ( kVA ) Hz
LOAD
U12 U23 U31 U12 U23 U31 U12 U23 U31 V1 V2 V3 V1 V2 V3 P1 P2 P3 M1 M2 INV
08.00
10.00
I
12.00
14.00
16.00
18.00
II
20.00
22.00
24.00
02.00
III
04.00
06.00
VOLTAGE
POWER Frequency PF
Phase to Phase Phase To Neutral
Shift Time
M1 M2 Load M2 Load Power ( kVA ) Hz
LOAD
U12 U23 U31 U12 U23 U31 U12 U23 U31 V1 V2 V3 V1 V2 V3 P1 P2 P3 M1 M2 INV
08.00
10.00
I
12.00
14.00
16.00
18.00
II
20.00
22.00
24.00
02.00
III
04.00
06.00
Tanggal :
CURRENT BATTERY
MG II
CURRENT BATTERY
08:00
10:00
1
12:00
14:00
16:00
18:00
2
20:00
22:00
24:00
02:00
3
04:00
06:00
08:00
10:00
1
12:00
14:00
16:00
18:00
2
20:00
22:00
24:00
02:00
3
04:00
06:00
08:00
10:00
1
12:00
14:00
16:00
18:00
2
20:00
22:00
24:00
02:00
3
04:00
06:00
08:00
10:00
1
12:00
14:00
16:00
18:00
2
20:00
22:00
24:00
02:00
3
04:00
06:00
Tanggal :
VEKTOR I
Power Batt.
Out Put Power (%) Cap Load
Apparent (KVA) Temp Status
S T R S T %
VEKTOR II
Power Batt.
Out Put Power (%) Cap Load
Apparent (KVA) Temp Status
S T R S T %
VEKTOR III
Power Batt.
Out Put Power (%) Cap Load
Apparent (KVA) Temp Status
S T R S T %
VEKTOR IV
Power Batt.
Out Put Power (%) Cap Load
Apparent (KVA) Temp Status
S T R S T %
SCTV BUILDING MANAGEMENT
DAILY CHECK
DEPARTEMENT ENGINEERING
Medium Voltage LVMDP I
Shif Time Volt Arus Counter Voltage Current Load Counter
(KV) (I) WBP LWBP R-S R-T S-T R-N S-N T-N R S T (A) Kwh R-S
08:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
24:00
02:00
04:00
06:00
Water Consumtion
Time Time
Make Up Water By Pass Roof WBP
8:00 8:00
Tanggal :
DAILY CHECK ENERGY
LVMDP II
Voltage Current Load Counter
R-T S-T R-N S-N T-N R S T (A) Kwh
Meter Indigo 80189355
WBP LWBP KvArh
Tanggal :
SCTV BUILDING MANAGEMENT
DAILY CHECK TRAFFO
DEPARTEMENT ENGINEERING
10:00
I
12:00
14:00
16:00
18:00
II
20:00
22:00
24:00
02:00
III
04:00
06:00
Running Time
Parameter Unit
8:00 10:00 12:00 14:00 16:00 18:00 20:00
Active Spt.
SYSTEM 1
Disch. Superheat
Discharge Temp.
Saturated Cond.
Saturated Evap.
Discharge Press.
Suction Press.
Oil Press
Net. Press.
Capasity
Disch. Superheat
Discharge Temp.
Saturated Cond.
Saturated Evap.
Discharge Press.
Suction Press.
Oil Press
Net. Press.
Capasity
Voltage S
Ampere S
CB S
(Ampere)
T
Evap In
Chiller
Evap Out
Cond. In
Pressure
Cond. Out
Fan CT Status
CHWP Status
Pressure
CWP Status
Pressure
Meter PDAM
Running Time
22:00 0:00 2:00 4:00 6:00
FT II : SHIFT III :
FT II : SHIFT III :
CHECK LIST PERAWATAN PANEL LISTRIK
(LVMDP & CAPASITOR )
Kondisi
No. Uraian Pekerjaan
Baik Tidak
A. PANEL LISTRIK
1 Perksa kondisi lampu Indikator
2 Periksa kondisi Volt meter
3 Periksa kondisi Ampere meter
4 Periksa kondisi Watt meter
5 Periksa kondisi KWH meter
6 Periksa kondisi Frekuensi meter
7 Periksa kondisi tombol ( PB ) on / off
8 Periksa kondisi fuse / MCB / MCCB / ACB
9 Periksa kondisi selector Switch
10 Periksa kondisi Handle pintu dan kunci panel
11 Periksa instalasi wiring ( Wiring diagram )
12 Periksa kondisi kabel dan kabel skun
13 Periksa dan kencangkan baut pada semua terminal
( Usahakan panel dipadamkan )
Periksa kondisi kontaktor dan suara yang tidak normal
14
15 Periksa kondisi relay kontrol
16 Periksa kondisi pengatur waktu / timer
17 Periksa dan kebersihan seluruh dinding panel listrik
dan seluruh peralatan dalam panel ( usahakan panel
dipadamkan )
Catatan :
Mengetahui Supervisor
(……………………………….) (…………………….)
No. Dokumen F: ENG
Departemen Engineering
Berlaku Efektif Agustus 2016 01
IK Revisi 00
Halaman dari 1 1
Keterangan
Teknisi
(. …………………….)
Check List Capasitor Bank Panel LVMDP
Project / Site :
Indikator Lamp
Cos Phi Kabel Kondisi
Shift Time Terminasi
(Φ) Instalasi All Fuse
Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8
8:00
10:00
1
12:00
14:00
16:00
18:00
2
20:00
22:00
0:00
2:00
3
4:00
6:00
Check List Capasitor Bank Panel LVMDP
Indikator Lamp
Cos Phi Kabel Kondisi
Shift Time Terminasi
(Φ) Instalasi All Fuse
Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8
8:00
10:00
1
12:00
14:00
16:00
18:00
2
20:00
22:00
0:00
2:00
3
3
4:00
6:00
Supervisor Engineering :
(………………………….)
pasitor Bank Panel LVMDP
Kebersihan Keterangan
pasitor Bank Panel LVMDP
Kebersihan Keterangan