Professional Documents
Culture Documents
Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)
OSHASec 15,
Fall into excavated trench Body injuries
FMA (BOWEC)
Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)
OSHA Sec 15
Body vibration Body injuries
FMA (BOWEC)
OSHA Sec 15
Hand-arm vibration Carpal tunnel syndrome
FMA (BOWEC)
6 Hazard Identification
Hoe, Mobile Crane, Hacker, Oxy-Cutting,
Cutting Machine/Grinder)
OSHA Sec 15
Toppling of crane Fatality /body injuries
FMA (BOWEC)
Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)
OSHA Sec 15
Toppling of crane Body injuries / fatality
FMA (BOWEC)
Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barrier, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4.
Monitoring Appoint a Traffic Controller.
Elimination- Pest 1. Appoint pest control to clear all insect/ mosquito as shown in
C 2 2 N 0 I
control Prevention And Control Of Infectious Diseases Act and Regulation
Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 2 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weather
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 3 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weather
Elimination- Pest 1. Appoint pest control to clear all insect/ mosquito as shown in
C 2 3 Y 6 I
control Prevention And Control Of Infectious Diseases Act and Regulation
Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barrier, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4.
Monitoring Appoint a Traffic Controller.
Elimination- Pest 1. Appoint pest control to clear all insect/ mosquito as shown in
C 2 3 Y 6 I
control Prevention And Control Of Infectious Diseases Act and Regulation
Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 2 1 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weather
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barrier, Traffic C 3 4 Y 12 II toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4.
Monitoring Appoint a Traffic Controller.
Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 3 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weather
Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barrier, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4.
Monitoring Appoint a Traffic Controller.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 3 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weather
Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barrier, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4.
Monitoring Appoint a Traffic Controller.
EE/HIRARC/2019
EE/002
Approved by:
Control
rchy:
ment (PPE)
ment (PPE)
ment (PPE)
g.
ure must be follow
lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work
ment (PPE)
ment (PPE)
before commencing work. 2. All
3. To provide
se the activity full time.
4. To organize Tool Box
tart work.
5. To provide ‘Clearance Marking’ as
To Work.
d before commencing of work.
before commencement and weekly
zards. 3.
e at excavated area.
an with a good communication to
ure must be follow
lyze the potential of hazard.
x Talk before start work.
ler/ browser to prevent flying dust.
face mask to worker which involved
6. All workers must used
ucted.
ed to carrying out work. 2.
o be used while working. 3.
g before start work. 4.
MCB. 5. All
ore commencing of work. 6. All
re start work.
ment (PPE)
ment (PPE)
ure must be follow
lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work
1. Permit
Isolation Requirement.
ety of Atmosphere. 5. Entry Into
6. Rescue and Emergency
nts of Person Working in Confined
9. Additional Precautions During
e. 10. Record Keeping.
ment (PPE)
efore excavation. 2.
in full time. 3.
art work. 4.
g.
ure must be follow
lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work
or Hot Job.
e potential of hazard.
efore start work.
ment (PPE)
ment (PPE)
g.
or Hot Job.
e potential of hazard.
efore start work.
Control
rchy:
ment (PPE)
ure must be follow
lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work
1. Permit
Isolation Requirement.
ety of Atmosphere. 5. Entry Into
6. Rescue and Emergency
nts of Person Working in Confined
9. Additional Precautions During
e. 10. Record Keeping.
or Hot Job.
pulsory.
e start work. 4.
or Hot Job.
pulsory.
e start work. 4.
ment (PPE)
st if necessary
d before commencing work.
r P.P.E 3.
sor to supervise the activity full time.
4. To
g every time want to start work.
ment (PPE)
rience person.
ment (PPE)
efore excavation. 2.
in full time. 3.
art work. 4.
ment (PPE)
rience person.
or Hot Job.
e potential of hazard.
efore start work.
Control
rchy:
ment (PPE)
Hazard Identification
Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)
1 Scaffolding
Hazard Identification
1 Scaffolding
Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
2 Working Platform access/egress injuries FMA (BOWEC)
Hazard Identification
3 Ladder
Hazard Identification
Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)
Hazard Identification
4 Concrette Mixer
6 Generator
8 Cutting Machine
OSHA Sec 15
Toppling Fatality /body injuries
FM (BOWEC) Reg 6, 58, 118
9 Mobile Crane
Struck /crushed by OSHA Act Sec 15.
Body injuries / fatality
machine/Collision FM (BOWEC)(Safety)
Hazard Identification
9 Mobile Crane
Applicable OSH Leg/Reg/COP (in
No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)
OSHA Sec 15
Hand-arm vibration Carpal tunnel syndrome
FMA (BOWEC)
OSHA Sec 15
Exposure to noise Chronic hearing problem FM (Noise Exposure)
Reg. 1989.
14 Drill / Grinder
OSHA Sec 15
Exposure to noise Chronic hearing problem FM (Noise Exposure)
Reg. 1989.
OSHA Sec 15
Body vibration Body injuries
FMA (BOWEC)
Hazard Identification
Welding - (Electric/Gases)
17 Construction of Main Drains Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FMA 1967
18 Wall
Concretting (Vibrator
20
machine, mortar pump & etc)
Hazard Identification
Concretting (Vibrator
20
machine, mortar pump & etc) Splashes of conrete in eyes OSHA Sec 15,
Eye or body injuries
and contact with skin FMA Sec. 24
OSHA Sec 15
Body/Hand-arm vibration Body injuries
FMA (BOWEC)
21 Installation of Roof
OSHA Sec 15,
Electrocution Fatality /body injuries
FM (BOWEC) Reg. 16
Hazard Identification
Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)
Brick Laying
Hazard Identification
Brick Laying
Plastering
Splashes of conrete in eyes Eye injuries & skin OSHA Sec 15 & 24
and contact with skin irritation, dermatitis FMA (SHW) & Sec 23
25 Ceiling
Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)
25 Ceiling Hazard Identification
26 Painting
Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)
26 Painting Hazard Identification
* PROBABILITY x
Probability Index Description Severity Index
Engineering, Admin Control - 1. Ensure all workers aware about a safe work practice &
Provided proper procedure. 2. Briefing before start work. 3. immediately replace
C 2 3 Y 6 I
access/egress, unserviceable or damage equipment. 4. safety belt or lifelines
training/information required for working at height
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
Engineering, Admin Control - 1. Ensure all workers aware about a safe work practice &
Provided proper procedure. 2. Briefing before start work. 3. immediately replace
C 2 3 Y 6 I
access/egress, unserviceable or damage equipment. 4. safety belt or lifelines
training/information required for working at height
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
Engineering, Admin Control - 1. Ensure all workers aware about a safe work practice &
Provided proper procedure. 2. Briefing before start work. 3. immediately replace
C 3 2 N 0 I
access/egress, unserviceable or damage equipment. 4. safety belt or lifelines
training/information required for working at height
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
Admin Control & PPE - 1. All workers must be inducted before commencing of work.
Briefing,Protective clothing, C 3 2 N 0 I 2. All workers must be briefing before commencement and week
hand glove & face shield toolbox talks to explain the hazards.
Enggineering & Admin. 1. All workers must used proper PPE at work site. 2
Control - Safety awareness Un-good condition of machinery need to be check and repair as
-Face mask, C 3 2 N 0 I posible. 3.
Servicing, Toolbox Talk, Toolbox Talk before start work.
Monitoring 4. Place the machine in a good ventilation area.
Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and week
-Barrier, Traffic C 3 4 Y 12 II toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4
Monitoring Appoint a Traffic Controller.
Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and week
-Barrier, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Arrange flow of traffic
Monitoring 4. Appoint a Traffic Controller.
Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and week
-Barrier, Traffic C 3 4 Y 12 II toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4
Monitoring Appoint a Traffic Controller.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
Enggineering & Admin. 1. All workers must used proper PPE at work site. 2
Control - Safety awareness Un-good condition of machinery need to be check and repair as
-Face mask, C 3 2 N 0 I posible. 3.
Servicing, Toolbox Talk, Toolbox Talk before start work.
Monitoring 4. Place the machine in a good ventilation area.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
Admin control & PPE 1. All workers must be inducted before commencing of work.
Training, Briefing, Signalman, 2. All workers must be briefing before commencement and week
C 2 2 N 0 I
Safe Work Practice & Safety toolbox talks to explain the hazards. 3.
Helmet Appoint a Traffic Controller.
Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and week
-Barrier, Traffic C 3 4 Y 12 II toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to working Area. 4.
Monitoring Appoint a Traffic Controller.
Admin. Control & PPE - 1. All workers must be inducted before commencing work.
Safety awareness 2. All workers must use proper P.P.E
C 3 2 N 0 I
-Ear plug/muff & Noise monitoring
initial noise monitoring 4. Briefing before start work.
Admin control & PPE 1. Electrical Hand Tool must be in good condition.
Training, Briefing, Protective 2. Monitoring and analyze the potential of hazard.
C 3 4 Y 12 II
clothing & 3. Briefing/Toolbox Talk before start work.
hand glove. 4. Competent/Training.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
6. Job rotation a
rest if necessary
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
Admin. Control - Safety 1. All workers must be inducted before commencing of work.
awareness 2. All workers must be briefing before commencement and week
C 2 4 Y 0 I
Signalman, Training, Briefing & toolbox talks to explain the hazards. 3.
Monitoring Appoint a Signalman.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
6. Job rotation a
rest if necessary
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
Control
rchy:
ment (PPE)
ng person only.
scaffold erected more than 15
he material is in good
ng person only.
s & necessary precaution.
3.
mmencing work. 4.
on.
ment (PPE)
be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
ment (PPE)
ng person only.
scaffold erected more than 15
ng person only.
s & necessary precaution.
3.
mmencing work. 4.
on.
ment (PPE)
be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
ment (PPE)
ng person only.
ment (PPE)
be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
Control
rchy:
ment (PPE)
art work.
ng must be conducted to area and
Control
rchy:
ment (PPE)
art work.
ment (PPE)
f necessary
d before commencing work.
r P.P.E 3.
sor to supervise the activity.
art work.
ng must be conducted to area and
Control
rchy:
ment (PPE)
f necessary
Control
rchy:
ment (PPE)
erience person.
erience person.
Control
rchy:
ment (PPE)
ment (PPE)
ment (PPE)
ffic Controller.
ment (PPE)
ment (PPE)
ment (PPE)
be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
Control
rchy:
ment (PPE)
ment (PPE)
be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
be in good condition.
e inducted before start work.
onitoring and supervising.
rs must have a good health and fit to
5. Competent/Training.
Control
rchy:
ment (PPE)
be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
g.
ment (PPE)
efore excavation. 2.
in full time. 3.
art work. 4.
Control
rchy:
ment (PPE)
ure must be follow
alyze the potential of hazard.
box Talk before start work.
inkler/ browser to prevent flying
5. supply face mask to worker which
6. All
E during work conducted.
bout a safe work practice &
start work. 3. immediately replace
ipment. 4. safety belt or lifelines
f necessary
ment (PPE)
ment (PPE)
g.
ng person only.
scaffold erected more than 15
he material is in good
Control
rchy:
ment (PPE)
ment (PPE)
ng person only.
scaffold erected more than 15
he material is in good
ment (PPE)
g.
be in good condition.
e inducted before start work.
onitoring and supervising.
rs must have a good health and fit to
5. Competent/Training.
ment (PPE)
be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
5. Proper PPE must be
Control
rchy:
ment (PPE)
ment (PPE)
g.
Control
rchy:
ment (PPE)
g.
ork practice.
Control
rchy:
ment (PPE)
ment (PPE)
ment (PPE)
ment (PPE)
all potential area.
e start work.
ice.
4. Analyze works expose to
5. To provide body part
ment (PPE)
ure must be follow
alyze the potential of hazard.
box Talk before start work.
h station for emergency.
re use the chemical.
l workers must used proper PPE
LEVEL
High
Medium
Low
ENERGISER ENTERPRISE SDN BHD OSH TASK RISK A
Department TOWER SITE Personnel participated & consulted:
Area ALL Name Designation
Activity External Works
Hazard Identification
1 Retaining Wall
OSHA Act Sec 15.
Lightning Body injuries / fatality
FMA Act139 Sec 23
Hazard Identification
OSHA Sec 15
Body vibration syndrome Body injuries
FMA (BOWEC)
Splashes of hot bitumen in Eye injuries & skin OSHA Sec 15 & 24
eyes and contact with skin irritation, dermatitis FMA (SHW) & Sec 23
OSHASec 15,
Fall into excavated trench Body injuries
FMA (BOWEC)
* PROBABILITY x
Probability Index Description Severity Index
Admin Control - Safe 1. All workers must be brief before commencing of work. 2.
C 2 4 Y 8 I
work practice & Briefing. Stop work immediatly.
Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 2 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weathe
6. Job rotation an
rest if necessary
Admin Control & PPE - 1. Provive Shelter for workers cooling body from direct sun. 2.
Briefing,Protective clothing, C 3 2 N 0 I Brief workers to drink a lot of plain water.
hand glove & face shield 3. Advise workers to use a appropriate cloth due to hot weathe
Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 2 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weathe
Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barrier, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4.
Monitoring Appoint a Traffic Controller.
Elimination- Pest 1. Appoint pest control to clear all insect/ mosquito as shown in
C 2 3 Y 6 I
control Prevention And Control Of Infectious Diseases Act and Regulation
6. Job rotation an
rest if necessary
1. Proper PPE must be worn.
2. Briefing before start work.
Engin, Admin Control &
3. Supervise and
PPE - Guard rail, Safe work C 2 2 N 0 I
monitoring potential impact to workers. 4. Issued an
practice, Training & Briefing.
appropriate grip shoe. 5.
Wear a appropriate clothing.
Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 2 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weathe
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal
1. All Protective
workers Equipment
must be inducted (PPE)
before commencing of work.
2. All workers must be briefing before commencement and weekly
Admin control & PPE toolbox talks to explain the hazards. 3.
Training, Briefing, Signalman, practically to provide Catch Platform or catch netting at a potentia
C 3 4 Y 12 II
Safe Work Practice & Safety area. 4.
Helmet Appoint a signalman with a good communication to operator.
5. Safe work
1. All workers must practice.
be inducted before commencing of work.
2. No smoking or naked fire below 30 meters from the potential
Admin Control & PPE -
area. (Briefing & signages)
Briefing,Protective clothing, C 2 2 N 0 I
3. Provide training & safe work practice
hand glove & face shield
4.
Monitoring and supervise the works..
Control
rchy:
ment (PPE)
ment (PPE)
ment (PPE)
ment (PPE)
g.
d before commencing of work.
before commencement and weekly
zards. 3.
rt.
ment (PPE)
efore excavation. 2.
in full time. 3.
art work. 4.
Control
rchy:
ment (PPE)
1. Permit
Isolation Requirement.
ety of Atmosphere. 5. Entry Into
6. Rescue and Emergency
nts of Person Working in Confined
9. Additional Precautions During
e. 10. Record Keeping.
ment (PPE)
be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
ment (PPE)
be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
ment (PPE)
d before commencing of work.
before commencement and weekly
zards. 3.
atform or catch netting at a potential
4.
od communication to operator.
efore excavation. 2.
in full time. 3.
art work. 4.
E
Control
rchy:
ment (PPE)
1. Permit
Isolation Requirement.
ety of Atmosphere. 5. Entry Into
6. Rescue and Emergency
nts of Person Working in Confined
9. Additional Precautions During
e. 10. Record Keeping.
efore excavation. 2.
in full time. 3.
art work. 4.
or Hot Job.
mpulsory.
ore start work.
Control
rchy:
ment (PPE)
LEVEL
High
Medium
Low
ENERGISER ENTERPRISE SDN BHD OSH TASK RISK A
Department TOWER SITE Personnel participated & consulted:
Area ALL Name Designation
Activity General Activities
Hazard Identification
Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)
Installation of temporary access / Sprains, strains & Info from: DOSH,Niosh, CROSH,
2 Manual handling
working platform backache CCOHS, Miosh & etc
3 Application of painting
Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,
Body strain
& repetitive motion CCOHS, Miosh & etc
Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)
Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)
Hazard Identification
6 Application of pesticide
Sprains, strains & Info from: DOSH,Niosh, CROSH,
Manual handling
backache CCOHS, Miosh & etc
Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)
Hazard Identification
Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)
Unprotected floor opening/ Slip, trip & fall- body OSHA Sec 15 & 24
edge injuries / fatality FMA sect. 8, 15, 88 (BOWEC)
Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)
Hazard Identification
Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)
9 House Keeping
Info from: DOSH,Niosh, CROSH,
Manual handling Sprains, strains
CCOHS, Miosh & etc
OSHA Sec 15
Body vibration Body injuries
FMA (BOWEC)
OSHA Sec 15
Exposure to noise in long Chronic hearing
FM (Noise Exposure)
term problem
Reg. 1989.
Operation of pneumatic/electrical
11
powered hand tools.
* PROBABILITY x
Probability Index Description Severity Index
Hazard Identification
Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 2 1 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weathe
Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barricade, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards.
Control, Training, Briefing & 3.Monitoring the activities.
Monitoring 4. Barricade at te potential area and place signages
Enggineering & Admin. 1. Analyze any potential of hazards. 2. Daily checklist need to be
Control - Safety awareness updated and display by the supervisor and any hazards must
-Barrier, Traffic C 2 3 Y 6 I immediattely take necessary action. 3. Safe work practice and
Control, Training, Briefing & display signage. 4. only trained person can operate the machine.
Monitoring 5. Work monitoring and supervising
Control
rchy:
ment (PPE)
ment (PPE)
d before commencing work.
r P.P.E 3.
ent before work start.
f necessary
d before commencing of work.
before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the
ment (PPE)
f necessary
d before commencing of work.
elow 30 meters from the potential
ment (PPE)
ment (PPE)
e work practice.
4. Monitoring and supervise
Control
rchy:
ment (PPE)
art work.
ng must be conducted to area and
ment (PPE)
ment (PPE)
d before commencing work.
r P.P.E 3.
ent before work start.
f necessary
Control
rchy:
ment (PPE)
way.
y matters and site condition before
necessary.
way.
y matters and site condition before
ment (PPE)
way.
y matters and site condition before
oading material.
ng activities near the visiting people.
p work at a risky area if necessary.
way.
y matters and site condition before
ment (PPE)
art work.
ng must be conducted to area and
Control
rchy:
ment (PPE)
d before commencing of work.
elow 30 meters from the potential
ment (PPE)
g.
Control
rchy:
ment (PPE)
be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining. 5. Proper PPE must be
check before start work.
efore excavation. 2.
in full time. 3.
art work. 4.
E
Control
rchy:
ment (PPE)
ment (PPE)
be in good condition.
e inducted before start work.
onitoring and supervising.
rs must have a good health and fit to
5. Competent/Training.
d before commencing work.
r P.P.E 3.
ent before work start.
f necessary
Control
rchy:
ment (PPE)
art work.
ng must be conducted to area and
be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
5. Proper PPE must be provided.
6. Random check
LEVEL
Control
rchy:
ment (PPE)
High
Medium
Low
Type Hazard description Consequences
exposed to pathogen - bacteria, fungus, virus, toxic plant, leech
Biological
exposed to allergen
chemical splash onto skin, eye skin or eye iritation
chemical (high concentration) splash onto skin, eye skin burnt
chemical (high concentration) splash eye blindness
explosion Fatality
acute inhalation of vapor (short period of exposure to high concentration narcosis (unconsciousness), due to a repressive
of chemical vapour) - e.g. n-hexane effect on the central nervous system.
chronic inhalation of vapor (repeated or prolonged exposure to relatively Chronic effect - e.g. cause peripheral neuropathy
Chemical low concentration of chemical vapour) - e.g. n-hexane (disease of the peripheral nerves), an irreversible
effect
chronic inhalation of fume (repeated or prolonged exposure to relatively anaemia, a reduced ability of the blood to
low levels of substance) - e.g. lead distribute oxygen throughout the body
inhalation of toxic substance refer to CSDS
swallow (ingestion) of chemical refer to CSDS
fire Fatality
exposed to carcinogens - e.g. benzene leukaemia - cancer of blood-forming tissues
inhalation of smoke
exposed to X-ray
exposed to excessive noise
exposed to high/low temperature
subjected to vibration impact
Physical exposed to laser
exposed to microwave frequency
exposed to low freqeuncy
exposed to infrared
exposed to ultra violet
repetitive motion
awkward posture
wrong sitting posture
Ergonomic physical stress
vibration impact
computer screen radiation
forceful hand exertion
sexual harrasment
Psychosocial work harrassment
mental stress
exposed to conductive material
exposed to high static voltage
exposed to high voltage
hit/poked by object/mass
cut/poked by sharp object/edges
unguarded machine
draw in …
caught in between …
Snake bite
lack of oxygen asphyxiation (acute lack of oxygen that can cause
death)
fall from height
fall on same level
Others
hit by falling object
hit by vehicle
stab/puncture by flying object
stab/puncture by moving parts of machinery
sheared between two machines
sheared between a machinery part and workpiece
Drawn in between counter-rotating parts
Caught in between rotating and fixed-parts
caught in between materials in motion
contact against hot surface
contact against abrasive material
crushed by moving parts
crushed by stamping machine
Factories and Machinery Act (FMA) 1967
No. Reg/Order
1 Electric Passenger & Goods Lift Regulations 1970
2 Fencing of Machinery & Safety Regulations 1970
3 Notification, Certificate of Fitness and Inspection Regulation 1970
4 Persons-In-Charge Regulations 1970
5 Safety, Health & Welfare Regulations 1970
6 Steam Boiler and Unfired Pressure Vessel Regulations 1970
7 Lead Regulations 1984
8 Asbestos Process Regulations 1986
9 Building Operations & Works of Engineering Construction (Safety) Regulations 1986
10 Noise Exposure Regulations 1989
11 Mineral Dust Regulations 1989
Others
No. Act/Reg./Order
1 Fire Services Act 1988
1.1 Fire Certificate Regulations 2001
2 Poisons Act 1952
2.1 Poisons Regulations 1952
2.2 Sodium Arsenite Regulations 1949
2.3 Sodium Hydroxide Regulations 1962
2.4 Psychotropc Substance Regulations 1989
3 Electricity Supply Act 1990
3.1 Electricity Regulation 1994
4 Atomic Energy Licensing Act 1984
4.1 Licensing Regulations
4.2 Basic Safety Standards Regulations
4.3 Transport Regulations