ENERGISER ENTERPRISE SDN BHD OSH TASK RISK A

Department TOWER SITE Personnel participated & consulted:


Area ALL Name Designation
Activity
Preliminaries Works - Site Clearing
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Struck /crushed by OSHA Act Sec 15.


Body injuries / fatality
machine/Collision FM (BOWEC)(Safety)

OSHA Act Sec 15.


FM (BOWEC) (Electrical Hazard)
Potential contact with
Body injuries / fatality Reg 16. 1986 Electricity Supply
underground power line
Act 1990 Electricity Reg. and
rules 1994

OSHA Act Sec 15


Chronic hearing
Exposure to noise FM (Noise Exposure)
problem
Reg. 1989.
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Inhalation of heavy smoke / OSHA Sec 15,


Excavation Of Earth - (Excavator, Back Chronic health problem
1 exhaust fume FM (BOWEC) Reg 11 & 14. 1986
Hoe and Dump Truck)

1. OSHA Act Sect 15,


2. FMA Sect. 22.
Dengue/ skin
Mosquito/ insect bites 3. Prevention And Control
rash/dermatitis
Of Infectious Diseases Act and
Regulation

Irritation of respiratory OSHA Sec 15,


Inhalation of dust
tract FM (Mineral Dust) Reg. 1989

Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24

OSHA Sec 15 & 24,


Heat stress Fatigue/ skin rash
FMA Sect. 23
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24,


Irritation of respiratory
Exposure to welding fume FM (BOWEC)(Safety)
tract
Reg 14.

OSHA Sec 15,


Exposed to UV & IR ray permanent eye damage FMA Sec 11 & (BOWEC)
Reg 15

OSHA Sec 15,


Exposure to welding spark Skin burn FMA Sec 11 & (BOWEC)
Reg 15

OSHA Sec 15,


Electrocution Fatality /body injuries FM (BOWEC)(SAFETY)
Reg. 16
Installation of Hoarding - (Welding Set,
2
Power Tool/Drill)

OSHA Sec 15,


Exposure to sharp object Hand Injuries
FMA Sec. 24

OSHA Sec 15,


Flying of particles Eye or body injuries
FMA Sec. 24
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24,


Heat stress Fatigue
FMA Sect. 23

1. OSHA Act Sect 15,


2. FMA Sect. 22.
Dengue/ skin
Mosquito/ insect bites 3. Prevention And Control
rash/dermatitis
Of Infectious Diseases Act and
Regulation

Struck /crushed by OSHA Act Sec 15.


Body injuries / fatality
machine/Collision FM (BOWEC)(Safety)

1. OSHA Act Sect 15,


2. FMA Sect. 22. 3.
Dengue/ skin
Mosquito/ insect bites Prevention And Control Of
rash/dermatitis
Infectious Diseases Act and
Regulation

Inhalation of dust/Concrette Irritation of respiratory OSHA Sec 15,


Dust tract FM (Mineral Dust) Reg. 1989
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Act Sec 15.


FM (BOWEC) (Electrical Hazard)
Potential contact with
Body injuries / fatality Reg 16. 1986 Electricity Supply
Silt Trap/Wash Trough - (Excavator, Back underground power line
3 Act 1990 Electricity Reg. and
Hoe, Welding Set, Cutting Machine/grinder) rules 1994

OSHASec 15,
Fall into excavated trench Body injuries
FMA (BOWEC)

Irritation of respiratory OSHA Sec 15,


Inhalation of dust
tract FM (Mineral Dust) Reg. 1989

OSHA Sec 15,


Electrocution Fatality /body injuries FM (BOWEC)(SAFETY)
Reg. 16

OSHA Sec 15 & 24,


Heat stress Fatigue
FMA Sect. 23
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Struck /crushed by OSHA Act Sec 15.


Body injuries / fatality
machine/Collision FM (BOWEC)(Safety)

OSHA Act Sec 15.


FM (BOWEC) (Electrical Hazard)
Potential contact with
Body injuries / fatality Reg 16. 1986 Electricity Supply
underground power line
Act 1990 Electricity Reg. and
rules 1994

Inhalation of heavy smoke / OSHA Sec 15,


Chronic health problem
exhaust fume FM (BOWEC) Reg 11 & 14. 1986

Sprains, strains & OSHA Act 15,


Manual handling
backache FMA Sec. 12
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24,


Irritation of respiratory
Exposure to welding fume FM (BOWEC)(Safety)
tract
Reg 14.

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24

Stream Diversion - (Excavator, Back Hoe, OSHA Sec 15 & 24,


4 Heat stress Fatigue/ skin rash
Welding Set & Cutting Machine) FMA Sect. 23

OSHA Sect 15.


Harzadous Atmosphere
Confined Space ICOP 2010
(Industrial Code Of Practice)

OSHA Sec 15,


Fall into excavated trench Body injuries
FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Act 15,


Soil collapse into
Body injuries / fatality FM (BOWEC)
trench/Cave in
Reg 116,117 & 118

OSHA Sec 15,


Exposed to UV & IR ray Permanent eye damage FMA Sec 11 & (BOWEC)
Reg 15

OSHA Sec 15,


Exposure to welding spark Skin burn FMA Sec 11 & (BOWEC)
Reg 15

OSHA Sec 15,


Electrocution Fatality /body injuries FM (BOWEC)(SAFETY)
Reg. 16

Struck /crushed by OSHA Act Sec 15.


Body injuries / fatality
machine/Collision FM (BOWEC)(Safety)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Act Sec 15.


FM (BOWEC) (Electrical Hazard)
Potential contact with
Body injuries / fatality Reg 16. 1986 Electricity Supply
underground power line
Act 1990 Electricity Reg. and
rules 1994

OSHA Act Sec 15


Chronic hearing
Exposure to noise FM (Noise Exposure)
problem
Reg. 1989.

Earth Work - (Excavator, Back Hoe, Back


5
Pusher, Roller Compactor, Dump Truck)
Inhalation of heavy smoke / OSHA Sec 15,
Chronic health problem
exhaust fume FM (BOWEC) Reg 11 & 14. 1986

Inhalation of dust/Concrette Irritation of respiratory OSHA Sec 15,


Dust tract FM (Mineral Dust) Reg. 1989
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24

OSHA Sec 15 & 24,


Heat stress Fatigue/ skin rash
FMA Sect. 23

Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)

OSHA Sec 15,


Exposed to UV & IR ray permanent eye damage FMA Sec 11 & (BOWEC)
Reg 15

OSHA Sec 15,


Exposure to welding spark Skin burn FMA Sec 11 & (BOWEC)
Reg 15

OSHA Sec 15,


Electrocution Fatality /body injuries FM (BOWEC)(SAFETY)
Reg. 16
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24,


Irritation of respiratory
Exposure to welding fume FM (BOWEC)(Safety)
tract
Reg 14.

OSHA Sect 15.


Harzadous Atmosphere
Confined Space ICOP 2010
(Industrial Code Of Practice)

Minor fire accident/ Contact OSHA Sec 15 & 24


Skin burn
with Hot Part FMA (BOWEC)

Leakage of oxy-acetylene OSHA Sec 15 & 24


Fatality /body injuries
hose- fire or explosion FMA (BOWEC)

Inhalation of dust/Concrette Irritation of respiratory OSHA Sec 15,


Dust tract FM (Mineral Dust) Reg. 1989
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15,


Flying of particles Eye or body injuries
FMA Sec. 24

OSHA Sec 15
Body vibration Body injuries
FMA (BOWEC)

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc

OSHA Act Sec 15


Chronic hearing
Exposure to noise FM (Noise Exposure)
problem
Reg. 1989.
Box Culvert and Sump - (Excavator/Back
6 Hoe, Mobile Crane, Hacker, Oxy-Cutting,
Cutting Machine/Grinder)

OSHA Sec 15
Hand-arm vibration Carpal tunnel syndrome
FMA (BOWEC)
6 Hazard Identification
Hoe, Mobile Crane, Hacker, Oxy-Cutting,
Cutting Machine/Grinder)

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15,


Exposure to sharp object Hand Injuries
FMA Sec. 24

OSHA Sec 15 & 24


Falling of materials Fatality /body injuries
FMA (BOWEC)

OSHA Sec 15
Toppling of crane Fatality /body injuries
FMA (BOWEC)

Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)

Hand injuries/Body OSHA Sec 15,


Operation of Power Tools
Injury FM (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24,


Heat stress Fatigue/ skin rash
FMA Sect. 23

OSHA Act 15,


Soil collapse into
Body injuries / fatality FM (BOWEC)
trench/Cave in
Reg 116,117 & 118

OSHA Sec 15,


Flying of particles Eye or body injuries
FMA Sec. 24

Inhalation of dust/Concrette Irritation of respiratory OSHA Sec 15,


Dust tract FM (Mineral Dust) Reg. 1989

Minor fire accident/ OSHA Sec 15 & 24


Skin burn
Contact with Hot Part FMA (BOWEC)

OSHA Sec 15,


Exposure to sharp object Hand Injuries
FMA Sec. 24
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24


Falling of material Body injuries
FMA (BOWEC)

OSHA Sec 15
Toppling of crane Body injuries / fatality
FMA (BOWEC)

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24


Piling Works - (Jack-In Machine, Mobile
7 Crane, Welding Set, Generator, Drop
Hammer)

OSHA Act Sec 15


Chronic hearing
Exposure to noise FM (Noise Exposure)
problem
Reg. 1989.

OSHA Sec 15,


Electrocution Fatality /body injuries FM (BOWEC)(SAFETY)
Reg. 16
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24,


Heat stress Fatigue/ skin rash
FMA Sect. 23

OSHA Sec 15 & 24,


Heat stress Fatigue/ skin rash
FMA Sect. 23

Load Test - (Mobile Crane, Jack-In


8
Machine)

Struck /crushed by OSHA Act Sec 15.


Body injuries / fatality
machine/Collision FM (BOWEC)(Safety)
Doc No. EE/HIRARC/2019
H TASK RISK ASSESSMENT Ref Code / Rev EE/002
Assessors name Prepared by: Reviewed by: Approved by:
1) Name: Name: Name:
2) Signature: Signature: Signature:
3) Date: Date: Date:
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barrier, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4.
Monitoring Appoint a Traffic Controller.

1. All workers must be inducted before commencing work. 2. A


Enggineering, Admin. workers must use proper P.P.E 3. To provid
Control & PPE - Safety competent super visor to supervise the activity full time.
awareness C 3 4 Y 12 II 4. To organize Tool Box
-Isolation, Briefing, Monitoring talk/meeting every time want to start work.
and appropriate PPE 5. To provide ‘Clearance Marking’
per TNB requirement.

1. All workers must be inducted before commencing work.


Admin. Control & PPE -
2. All workers must use proper P.P.E
Safety awareness
C 2 2 N 0 I To provide competent super visor to supervise the activity full time
-Ear plug/muff &
4
initial noise monitoring
To organize Tool Box talk/meeting every time want to start work.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Enggineering & Admin.


1. All workers must used proper PPE at work site. 2.
Control - Safety awareness
Un-good condition of machinery need to be check and repair as
-Face mask, C 2 2 N 0 I
posible. 3.
Servicing, Toolbox Talk,
Toolbox Talk before start work.
Monitoring

Elimination- Pest 1. Appoint pest control to clear all insect/ mosquito as shown in
C 2 2 N 0 I
control Prevention And Control Of Infectious Diseases Act and Regulation

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
Engineering, admin control
3. Briefing/Toolbox Talk before start work.
& PPE - Water
C 3 2 N 0 I 4. Provide water sprinkler/ browser to prevent flying dust.
sprinkling/Browser, Dust
5. supply face mask to worker which involved
mask and training
6. All workers must use
proper PPE during work conducted.
1. All workers must be inducted before commencing of work.
Engineering, Admin Control
2. All workers must be briefing before commencement and weekly
- Provided proper
C 2 2 N 0 I toolbox talks to explain the hazards. 3. To
access/egress,
provide proper access/egress.
training/information
4. Safe work practice.
Admin. Control - Safe 1. Stop work.
C 2 4 Y 8 I
work practice 2.Terminate if necessary

Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 2 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weather
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Safe work practice/procedure must be follow


Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing & C 2 2 N 0 I 3. Briefing/Toolbox Talk before start work.
Face mask 4. All workers must used proper PPE during work
conducted.
1. Proper PPE must be worn.
2. Briefing before start work.
Admin control & PPE
3. Supervise and
Training, Briefing & C 2 2 N 0 I
monitoring potential impact to workers. 4. Provide eye
Face Shield
wash station for emergency..
5. Wear a appropriate clothing.
1. Safe work practice/procedure must be follow
Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective
C 2 1 N 0 I 3. Briefing/Toolbox Talk before start work.
clothing, hand glove &
4. All workers must used proper PPE during work
face shield
conducted.
1. Only the competent permitted to carrying out work. 2.
PPE equipment that suitable to be used while working. 3.
Admin control & PPE Supervise and provide briefing before start work. 4.
Training, Briefing, Protective C 3 4 Y 12 II Obtain Working Permit from MCB. 5.
clothing & hand glove. workers must be inducted before commencing of work. 6. All
workers must be briefing before start work.

1. All moving part of the machine must be fully guarded. 2


Engineering, admin control
All workers must be inducted before commencing of work. 3. All
& PPE - Guarded,
C 3 2 Y 6 I workers must be briefing before start work. 4. Prop
briefing and Protective
PPE must be worn while working. 5. Provide
clothing
training to workers which involved.
1. Safe work practice/procedure must be follow
Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 2 2 N 0 I 3. Briefing/Toolbox Talk before start work.
clothing & hand glove. 4. All workers must used proper PPE during work
conducted.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 3 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weather

Elimination- Pest 1. Appoint pest control to clear all insect/ mosquito as shown in
C 2 3 Y 6 I
control Prevention And Control Of Infectious Diseases Act and Regulation

Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barrier, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4.
Monitoring Appoint a Traffic Controller.

Elimination- Pest 1. Appoint pest control to clear all insect/ mosquito as shown in
C 2 3 Y 6 I
control Prevention And Control Of Infectious Diseases Act and Regulation

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
Engineering, admin control
3. Briefing/Toolbox Talk before start work.
& PPE - Water
C 3 2 N 0 I 4. Provide water sprinkler/ browser to prevent flying dust.
sprinkling/Browser, Dust
5. supply face mask to worker which involved
mask and training
6. All workers must use
proper PPE during work conducted.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. All workers must be inducted before commencing work. 2. A
Enggineering, Admin. workers must use proper P.P.E 3. To provid
Control & PPE - Safety competent super visor to supervise the activity full time.
awareness C 3 4 Y 12 II 4. To organize Tool Box
-Isolation, Briefing, Monitoring talk/meeting every time want to start work.
and appropriate PPE 5. To provide ‘Clearance Marking’
per TNB requirement. 6. Permit To Work.
1. All workers must be inducted before commencing of work.
2. All workers must be briefing before commencement and weekly
Engineering,Admin control- toolbox talks to explain the hazards. 3.
C 3 2 N 0 I
Guardrail/Barrier, monitoring Provide Barricade and Signage at excavated area.
4. Appoint a signalman with a good communication to
operator.
1. Safe work practice/procedure must be follow
2. Monitoring and analyze the potential of hazard.
Engineering, admin control
3. Briefing/Toolbox Talk before start work.
& PPE - Water
C 3 2 N 0 I 4. Provide water sprinkler/ browser to prevent flying dust.
sprinkling/Browser, Dust
5. supply face mask to worker which involved
mask and training
6. All workers must use
proper PPE during work conducted.
1. Only the competent permitted to carrying out work. 2.
Admin control & PPE PPE equipment that suitable to be used while working. 3.
Training, Briefing, Protective C 2 4 Y 8 I Supervise and provide briefing before start work. 4.
clothing & hand glove. Obtain Working Permit from MCB. 5.
workers must be inducted before commencing of work. 6. All
workers must be briefing before start work.

Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 2 1 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weather
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barrier, Traffic C 3 4 Y 12 II toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4.
Monitoring Appoint a Traffic Controller.

1. All workers must be inducted before commencing work. 2. A


Enggineering, Admin. workers must use proper P.P.E 3. To provid
Control & PPE - Safety competent super visor to supervise the activity full time.
awareness C 3 4 Y 12 II 4. To organize Tool Box
-Isolation, Briefing, Monitoring talk/meeting every time want to start work.
and appropriate PPE 5. To provide ‘Clearance Marking’
per TNB requirement. 6. Permit To Work.

Enggineering & Admin.


1. All workers must used proper PPE at work site. 2.
Control - Safety awareness
Un-good condition of machinery need to be check and repair as
-Face mask, C 3 2 N 0 I
posible. 3.
Servicing, Toolbox Talk,
Toolbox Talk before start work.
Monitoring

1. Lift the objects with good procedure and posture.


2. Used trolly or 2 person lift the heavy object if more
Admin. Control - safe
C 2 2 N 0 I than 2 KG .
lifting procedure
3. Briefing/Toolbox Talk before start work.
4. ProvideTraining manual handling activities.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Safe work practice/procedure must be follow
Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing & C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
Face mask 4. All workers must used proper PPE during work
conducted.

Admin. Control - Safe 1. Stop work.


C 2 4 Y 8 I
work practice 2.Terminate if necessary

Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 3 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weather

Detail Requirement: 1. Permit


System. 2. Permit to Work. 3. Isolation Requirement.
Engineering, admin control
4.Requirement to Ensure Safety of Atmosphere. 5. Entry Into
& PPE - Guidelines in
C 3 4 Y 12 II Hazardous Atmosphere. 6. Rescue and Emergency
Industrial Code Of Practice
Services. 7.Health Requirements of Person Working in Confined
2010 (ICOP)
Space. 8. Training. 9. Additional Precautions During
Occupancy of Confined Space. 10. Record Keeping.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
Engineering,Admin control- toolbox talks to explain the hazards. 3.
C 3 2 N 0 I
Guardrail/Barrier, monitoring Provide Barricade and Signage at excavated area.
4. Appoint a signalman with a good communication to
operator.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Permit To Work Required before excavation. 2


Engineering control-
Supervise at all potential area in full time. 3.
Shoring/ safe work practice, C 3 4 Y 12 II
Briefing/Toolbox Talk before start work. 4
Supervising
Training.
1. Proper PPE must be worn.
2. Briefing before start work.
Admin control & PPE
3. Supervise and
Training, Briefing & C 3 2 N 0 I
monitoring potential impact to workers. 4. Provide eye
Face Shield
wash station for emergency..
5. Wear a appropriate clothing.
1. Safe work practice/procedure must be follow
Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective
C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
clothing, hand glove &
4. All workers must used proper PPE during work
face shield
conducted.

1. Permit to Work Required for Hot Job.


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 3 4 Y 12 II
3. Briefing/Toolbox Talk before start work.
clothing & hand glove.
4. Competent/Training.

Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barrier, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4.
Monitoring Appoint a Traffic Controller.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing work. 2. A


Enggineering, Admin. workers must use proper P.P.E 3. To provid
Control & PPE - Safety competent super visor to supervise the activity full time.
awareness C 3 4 Y 0 I 4. To organize Tool Box
-Isolation, Briefing, Monitoring talk/meeting every time want to start work.
and appropriate PPE 5. To provide ‘Clearance Marking’
per TNB requirement. 6. Permit To Work.

1. All workers must be inducted before commencing work.


Admin. Control & PPE -
2. All workers must use proper P.P.E 3
Safety awareness
C 2 2 N 0 I To provide competent super visor to supervise the activity full time
-Ear plug/muff &
4.
initial noise monitoring
organize Tool Box talk/meeting every time want to start work.

Enggineering & Admin.


1. All workers must used proper PPE at work site. 2.
Control - Safety awareness
Un-good condition of machinery need to be check and repair as
-Face mask, C 3 2 N 0 I
posible. 3.
Servicing, Toolbox Talk,
Toolbox Talk before start work.
Monitoring

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
Engineering, admin control
3. Briefing/Toolbox Talk before start work.
& PPE - Water
C 3 2 N 0 I 4. Provide water sprinkler/ browser to prevent flying dust.
sprinkling/Browser, Dust
5. supply face mask to worker which involved
mask and training
6. All workers must use
proper PPE during work conducted.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Admin. Control - Safe 1. Stop work.


C 2 4 Y 8 I
work practice 2.Terminate if necessary

Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 3 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weather

1. Proper PPE must be worn.


Engineering, Admin Control 2. Briefing before start work.
- Provided proper 3. Supervise and
C 2 2 N 0 I
access/egress, monitoring potential impact to workers. 4. Issued an
training/information appropriate grip shoe. 5.
Wear a appropriate clothing.
1. Proper PPE must be worn.
2. Briefing before start work.
Admin control & PPE
3. Supervise and
Training, Briefing & C 2 2 N 0 I
monitoring potential impact to workers. 4. Provide eye
Face Shield
wash station for emergency..
5. Wear a appropriate clothing.

1. Safe work practice/procedure must be follow


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective
C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
clothing, hand glove &
4. All workers must used proper PPE during work
face shield
conducted.

1. Permit to Work Required for Hot Job.


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 3 4 Y 12 II
3. Briefing/Toolbox Talk before start work.
clothing & hand glove.
4. Kompetent/Training.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Safe work practice/procedure must be follow
Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing & C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
Face mask 4. All workers must used proper PPE during work
conducted.

Detail Requirement: 1. Permit


System. 2. Permit to Work. 3. Isolation Requirement.
Engineering, admin control
4.Requirement to Ensure Safety of Atmosphere. 5. Entry Into
& PPE - Guidelines in
C 3 4 Y 12 II Hazardous Atmosphere. 6. Rescue and Emergency
Industrial Code Of Practice
Services. 7.Health Requirements of Person Working in Confined
2010 (ICOP)
Space. 8. Training. 9. Additional Precautions During
Occupancy of Confined Space. 10. Record Keeping.

1. Permit To Work Required for Hot Job.


Admin Control & PPE -
2. Flashback Arrestor is compulsory.
Briefing,Protective clothing, C 3 2 N 0 I
3. Briefing/Toolbox Talk before start work. 4
hand glove & face shield
Competent/Training.

Engineering & Admin. 1. Permit Ro Work Required for Hot Job.


Control - Flash Back 2. Flashback Arrestor is compulsory.
C 1 4 Y 4 I
Arrestor, Training, Briefing & 3. Briefing/Toolbox Talk before start work.
Hot work permit Competent/Training.
1. Safe work practice/procedure must be follow
2. Monitoring and analyze the potential of hazard.
Engineering, admin control
3. Briefing/Toolbox Talk before start work.
& PPE - Water
C 3 1 N 0 I 4. Provide water sprinkler/ browser to prevent flying dust.
sprinkling/Browser, Dust
5. supply face mask to worker which involved
mask and training
6. All workers must use
proper PPE during work conducted.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Safe work practice/procedure must be follow


Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
clothing & hand glove. 4. All workers must used proper PPE during work
conducted.

1. Workers must be inducted before start work.


Admin. Control -
2. Work monitoring and supervising.
Training, Briefing, Job C 2 2 N 0 I
3. Workers must have a good health and fit to work.
Rotation & Safe work practice
4. Conduct body part assessment before start work.
1. Supervise & monitoring at all potential area.
2. Briefing/Toolbox Talk before start work.
3. Training & Safe work Practice.
Admin. Control -
4. Analyze works expose to hazards
Training, Briefing, Job C 3 2 N 0 I
5. To provide body part assessment
Rotation & Safe work practice
before work start.

6. Job rotation and rest if necessary


1. All workers must be inducted before commencing work.
Admin. Control & PPE -
2. All workers must use proper P.P.E 3
Safety awareness
C 3 3 Y 9 I To provide competent super visor to supervise the activity full time
-Ear plug/muff &
4.
initial noise monitoring
organize Tool Box talk/meeting every time want to start work.

1. Conduct assessment body part before start work.


Admin. Control - 2. Workers must be inducted before start work.
Training, Briefing, Job C 2 2 N 0 I 3. Work monitoring and supervising.
Rotation & Safe work practice 4. Workers must have a good health and fit to
work. 5. Competent/Training.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All moving part of the machine must be fully guarded. 2


Engineering, admin control
All workers must be inducted before commencing of work. 3. All
& PPE - Guarded,
C 3 2 N 0 I workers must be briefing before start work. 4. Prop
briefing and Protective
PPE must be worn while working. 5. Provide
clothing
training to workers which involved.

1. All workers must be inducted before commencing of work.


Admin control & PPE
2. All workers must be briefing before commencement and weekly
Training, Briefing, Signalman,
C 3 4 Y 12 II toolbox talks to explain the hazards. 3.
Safe Work Practice & Safety
Provide Barricade to Excavate Area. 4.
Helmet
Appoint a signalman with a good communication to operator.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards. 3.
Admin. Control - Safe
C 2 4 Y 8 I Competent/license operator only can operate machine
working load/procedure
4. Appoint a signalman with a good communication to
operator.
5. Supervise by the experience person.

1. All workers must be inducted before commencing of work.


Engineering, Admin Control
2. All workers must be briefing before commencement and weekly
- Provided proper
C 3 2 N 0 I toolbox talks to explain the hazards. 3. To
access/egress,
provide proper access/egress.
training/information
4. Safe work practice.

1. All workers must be inducted before commencing of work.


Engin. & Admin control - 2. All workers must be briefing before commencement and weekly
Mechanical guard, Safe Work C 2 3 Y 0 I toolbox talks to explain the hazards. 3.
Practice training & Briefing Training workers only can operate machine.
4. Supervise by the experience person.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Proper PPE must be worn.
2. Briefing before start work.
Engineering, admin control
3. Supervise and
& PPE - Shelter, C 3 1 N 0 I
monitoring potential impact to workers. 4. Provide
Briefing & Protective clothing
shelter/cool place for rest if necessary.
5. Wear a appropriate clothing.
1. Permit To Work Required before excavation. 2
Engineering control-
Supervise at all potential area in full time. 3.
Shoring/ safe work practice, C 3 4 Y 12 II
Briefing/Toolbox Talk before start work. 4
Supervising
Training.
1. Safe work practice/procedure must be follow
Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
clothing & hand glove. 4. All workers must used proper PPE during work
conducted.
1. Safe work practice/procedure must be follow
2. Monitoring and analyze the potential of hazard.
Engineering, admin control
3. Briefing/Toolbox Talk before start work.
& PPE - Water
C 2 2 N 0 I 4. Provide water sprinkler/ browser to prevent flying dust.
sprinkling/Browser, Dust
5. supply face mask to worker which involved
mask and training
6. All workers must use
proper PPE during work conducted.

1. Permit To Work Required before excavation. 2


Admin Control & PPE -
Supervise at all potential area in full time. 3.
Briefing,Protective clothing, C 3 3 Y 9 I
Briefing/Toolbox Talk before start work. 4
hand glove & face shield
Training.

1. All moving part of the machine must be fully guarded. 2


Engineering, admin control
All workers must be inducted before commencing of work. 3. All
& PPE - Guarded,
C 3 2 N 0 I workers must be briefing before start work. 4. Prop
briefing and Protective
PPE must be worn while working. 5. Provide
clothing
training to workers which involved.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Admin control & PPE 2. All workers must be briefing before commencement and weekly
Training, Briefing, Signalman, toolbox talks to explain the hazards. 3.
C 2 4 Y 8 I
Safe Work Practice & Safety Provide Barricade to Excavate Area. 4.
Helmet Appoint a signalman with a good communication to license machi
operator.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards. 3.
Admin. Control - Safe
C 3 4 Y 12 II Competent/license operator only can operate machine
working load/procedure
4. Appoint a signalman with a good communication to
operator.
5. Supervise by the experience person.

Admin. Control - Safe 1. Stop work.


C 2 4 Y 8 I
work practice 2.Terminate if necessary

1. All workers must be inducted before commencing work.


Admin. Control & PPE -
2. All workers must use proper P.P.E 3
Safety awareness
C 3 2 N 0 I To provide competent super visor to supervise the activity full time
-Ear plug/muff &
4.
initial noise monitoring
organize Tool Box talk/meeting every time want to start work.

1. Permit Ro Work Required for Hot Job.


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 3 4 Y 12 II
3. Briefing/Toolbox Talk before start work.
clothing & hand glove.
4. Kompetent/Training.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Proper PPE must be worn.
2. Briefing before start work.
Engineering, admin control
3. Supervise and
& PPE - Shelter, C 3 1 N 0 I
monitoring potential impact to workers. 4. Provide
Briefing & Protective clothing
shelter/cool place for rest if necessary.
5. Wear a appropriate clothing.
1. Proper PPE must be worn.
2. Briefing before start work.
Engineering, admin control
3. Supervise and
& PPE - Shelter, C 3 1 N 0 I
monitoring potential impact to workers. 4. Provide
Briefing & Protective clothing
shelter/cool place for rest if necessary.
5. Wear a appropriate clothing.

Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barrier, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4.
Monitoring Appoint a Traffic Controller.
EE/HIRARC/2019
EE/002
Approved by:

Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.

before commencing work. 2. All


3. To provide
se the activity full time.
4. To organize Tool Box
tart work.
5. To provide ‘Clearance Marking’ as

d before commencing work.


r P.P.E 3.
sor to supervise the activity full time.
4.
ting every time want to start work.
Control
rchy:

ment (PPE)

er PPE at work site. 2.


ry need to be check and repair as
3.
.

r all insect/ mosquito as shown in


ectious Diseases Act and Regulation

ure must be follow


lyze the potential of hazard.
x Talk before start work.
ler/ browser to prevent flying dust.
face mask to worker which involved
6. All workers must used
ucted.
d before commencing of work.
before commencement and weekly
zards. 3. To
.
4. Safe work practice.

cooling body from direct sun. 2.


plain water.
appropriate cloth due to hot weather.
Control
rchy:

ment (PPE)

ure must be follow


lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work

fing before start work.


3. Supervise and
workers. 4. Provide eye

g.
ure must be follow
lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work

ed to carrying out work. 2.


o be used while working. 3.
g before start work. 4.
MCB. 5. All
ore commencing of work. 6. All
re start work.

ine must be fully guarded. 2.


before commencing of work. 3. All
re start work. 4. Proper
ing. 5. Provide
ved.
ure must be follow
lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work
Control
rchy:

ment (PPE)

cooling body from direct sun. 2.


plain water.
appropriate cloth due to hot weather.

r all insect/ mosquito as shown in


ectious Diseases Act and Regulation

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.

r all insect/ mosquito as shown in


ectious Diseases Act and Regulation

ure must be follow


lyze the potential of hazard.
x Talk before start work.
ler/ browser to prevent flying dust.
face mask to worker which involved
6. All workers must used
ucted.
Control
rchy:

ment (PPE)
before commencing work. 2. All
3. To provide
se the activity full time.
4. To organize Tool Box
tart work.
5. To provide ‘Clearance Marking’ as
To Work.
d before commencing of work.
before commencement and weekly
zards. 3.
e at excavated area.
an with a good communication to
ure must be follow
lyze the potential of hazard.
x Talk before start work.
ler/ browser to prevent flying dust.
face mask to worker which involved
6. All workers must used
ucted.
ed to carrying out work. 2.
o be used while working. 3.
g before start work. 4.
MCB. 5. All
ore commencing of work. 6. All
re start work.

cooling body from direct sun. 2.


plain water.
appropriate cloth due to hot weather.
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.

before commencing work. 2. All


3. To provide
se the activity full time.
4. To organize Tool Box
tart work.
5. To provide ‘Clearance Marking’ as
To Work.

er PPE at work site. 2.


ry need to be check and repair as
3.
.

rocedure and posture.


person lift the heavy object if more

ox Talk before start work.


manual handling activities.
Control
rchy:

ment (PPE)
ure must be follow
lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work

cooling body from direct sun. 2.


plain water.
appropriate cloth due to hot weather.

1. Permit
Isolation Requirement.
ety of Atmosphere. 5. Entry Into
6. Rescue and Emergency
nts of Person Working in Confined
9. Additional Precautions During
e. 10. Record Keeping.

d before commencing of work.


before commencement and weekly
zards. 3.
e at excavated area.
an with a good communication to
Control
rchy:

ment (PPE)

efore excavation. 2.
in full time. 3.
art work. 4.

fing before start work.


3. Supervise and
workers. 4. Provide eye

g.
ure must be follow
lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work

or Hot Job.
e potential of hazard.
efore start work.

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.
Control
rchy:

ment (PPE)

before commencing work. 2. All


3. To provide
se the activity full time.
4. To organize Tool Box
tart work.
5. To provide ‘Clearance Marking’ as
To Work.

d before commencing work.


r P.P.E 3.
sor to supervise the activity full time.
4. To
g every time want to start work.

er PPE at work site. 2.


ry need to be check and repair as
3.
.

ure must be follow


lyze the potential of hazard.
x Talk before start work.
ler/ browser to prevent flying dust.
face mask to worker which involved
6. All workers must used
ucted.
Control
rchy:

ment (PPE)

cooling body from direct sun. 2.


plain water.
appropriate cloth due to hot weather.

fing before start work.


3. Supervise and
workers. 4. Issued an
5.

fing before start work.


3. Supervise and
workers. 4. Provide eye

g.

ure must be follow


lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work

or Hot Job.
e potential of hazard.
efore start work.
Control
rchy:

ment (PPE)
ure must be follow
lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work

1. Permit
Isolation Requirement.
ety of Atmosphere. 5. Entry Into
6. Rescue and Emergency
nts of Person Working in Confined
9. Additional Precautions During
e. 10. Record Keeping.

or Hot Job.
pulsory.
e start work. 4.

or Hot Job.
pulsory.
e start work. 4.

ure must be follow


lyze the potential of hazard.
x Talk before start work.
ler/ browser to prevent flying dust.
face mask to worker which involved
6. All workers must used
ucted.
Control
rchy:

ment (PPE)

ure must be follow


lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work

before start work.


supervising.
a good health and fit to work.
ssessment before start work.
all potential area.
e start work.
ce.
4. Analyze works expose to hazards.
5. To provide body part assessment

st if necessary
d before commencing work.
r P.P.E 3.
sor to supervise the activity full time.
4. To
g every time want to start work.

part before start work.


be inducted before start work.
nitoring and supervising.
must have a good health and fit to
5. Competent/Training.
Control
rchy:

ment (PPE)

ine must be fully guarded. 2.


before commencing of work. 3. All
re start work. 4. Proper
ing. 5. Provide
ved.

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.
od communication to operator.

d before commencing of work.


before commencement and weekly
zards. 3.
nly can operate machine
lman with a good communication to

rience person.

d before commencing of work.


before commencement and weekly
zards. 3. To
.
4. Safe work practice.

d before commencing of work.


before commencement and weekly
zards. 3.
rate machine.
ce person.
Control
rchy:

ment (PPE)

fing before start work.


3. Supervise and
workers. 4. Provide
cessary.
clothing.
efore excavation. 2.
in full time. 3.
art work. 4.

ure must be follow


lyze the potential of hazard.
x Talk before start work.
sed proper PPE during work

ure must be follow


lyze the potential of hazard.
x Talk before start work.
ler/ browser to prevent flying dust.
face mask to worker which involved
6. All workers must used
ucted.

efore excavation. 2.
in full time. 3.
art work. 4.

ine must be fully guarded. 2.


before commencing of work. 3. All
re start work. 4. Proper
ing. 5. Provide
ved.
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.
od communication to license machine

d before commencing of work.


before commencement and weekly
zards. 3.
nly can operate machine
lman with a good communication to

rience person.

d before commencing work.


r P.P.E 3.
sor to supervise the activity full time.
4. To
g every time want to start work.

or Hot Job.
e potential of hazard.
efore start work.
Control
rchy:

ment (PPE)

fing before start work.


3. Supervise and
workers. 4. Provide
cessary.
clothing.

fing before start work.


3. Supervise and
workers. 4. Provide
cessary.
clothing.

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.
ENERGISER ENTERPRISE SDN BHD OSH TASK RISK
Department TOWER SITE Personnel participated & consulted:
Area ALL Name Designation
Activity Building Works

Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15.


Collapse of Structure Body injuries / fatality FM (BOWEC) (Scaffold)
Part 10 Reg 72-98

Osha Sec. 15 & 24


Falling from Height Body injuries / fatality FM (SHW) Reg 12, 32 & (Scaffold)
Pt 10 Reg 72-98

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)

Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)
1 Scaffolding
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

1 Scaffolding

OSHA Act Sec 15.


Lightning Body injuries / fatality
FMA Sec 23

OSHA Sec 15,


Electrocution Fatality /body injuries
FM (BOWEC) Reg. 16

OSHA Sec 15.


Structure Collapse/
Wind/Rain FM (BOWEC) (Scaffold)
disturbed/budge
Part 10 Reg 72-98

OSHA Sec 15 & 24,


Heat Stress Fatigue
FMA Sect. 23
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15.


Collapse Body injuries / fatality FM (BOWEC) (Scaffold)
Part 10 Reg 72-98

Osha Sec. 15 & 24


Falling from Height Body injuries / fatality FM (SHW) Reg 12, 32 & (Scaffold)
Pt 10 Reg 72-98

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)

Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
2 Working Platform access/egress injuries FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
2 Working Platform FM(SHW) reg)

OSHA Sec 15.


Lightning Body injuries / fatality
FMA Sec 23

OSHA Sec 15,


Electrocution Fatality /body injuries
FM (BOWEC) Reg. 16

OSHA Sec 15.


Structure Collapse/
Wind/Rain FM (BOWEC) (Scaffold)
disturbed/budge
Part 10 Reg 72-98

OSHA Sec 15 & 24,


Heat Stress Fatigue
FMA Sect. 23

OSHA Sec 15.


Collapse of Structure Body injuries / fatality FM (BOWEC) (Scaffold)
Part 10 Reg 72-98

3 Ladder
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

3 Ladder Osha Sec. 15 & 24


Falling from Height Body injuries / fatality FM (SHW) Reg 12, 32 & (Scaffold)
Pt 10 Reg 72-98

Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Caught in moving parts of OSHA Sec 15 & 24


Body injuries
machines FMA sec 15,20

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc

4 Concrette Mixer

Inhalation of heavy smoke / OSHA Sec 15,


Chronic health problem
exhaust fume FM (BOWEC) Reg 11 & 14. 1986

OSHA Act Sec 15


Exposure to noise Chronic hearing problem FM (Noise Exposure)
Reg. 1989.

OSHA Sec 15,


Electrocution Fatality /body injuries
FM (BOWEC) Reg. 16
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Inhalation of heavy smoke / OSHA Sec 15,


Chronic health problem
exhaust fume FM (BOWEC) Reg 11 & 14. 1986

OSHA Sec 15.


Struck by pressure hoses Body injuries
5 Air Compressor FMA Reg 4 & 118

FM - Rules (Boiler and


Compressor) 1970 & FMA
Unfit/ unsafe machine Body injuries / fatality
(Notification,Cert of Fitness &
Insp.) Reg.1970

OSHA Act Sec 15


Exposure to noise Chronic hearing problem FM (Noise Exposure)
Reg. 1989.
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15,


Electrocution Fatality /body injuries
FM (BOWEC) Reg. 16

OSHA Sec 15 & 24


Exposed hot surface Skin burn
FMA (BOWEC)

6 Generator

Inhalation of heavy smoke / OSHA Sec 15,


Chronic health problem
exhaust fume FM (BOWEC) Reg 11 & 14. 1986

OSHA Act Sec 15


Exposure to noise Chronic hearing problem FM (Noise Exposure)
Reg. 1989.

Caught in moving parts of OSHA Sec 15 & 24


Body injuries / fatality
machines FMA sec 15,20
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15,


Operation of Power Tools Hand injuries/Body Injury
FM (BOWEC)

7 Bending Machine Inhalation of heavy smoke / OSHA Sec 15,


Chronic health problem
exhaust fume FM (BOWEC) Reg 11 & 14. 1986

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc

OSHA Act Sec 15


Exposure to noise Chronic hearing problem FM (Noise Exposure)
Reg. 1989.
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15,


Operation of Power Tools Hand injuries/Body Injury
FM (BOWEC)

Inhalation of heavy smoke / OSHA Sec 15,


Chronic health problem
exhaust fume FM (BOWEC) Reg 11 & 14. 1986

Flying of particles and cutting OSHA Sec 15,


Eye or body injuries
disc FMA Sec. 24

8 Cutting Machine

Irritation of respiratory OSHA Sec 15,


Inhalation of dust
tract FM (Mineral Dust) Reg. 1989

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Act Sec 15


Exposure to noise Chronic hearing problem FM (Noise Exposure)
Reg. 1989.

OSHA Sec 15
Toppling Fatality /body injuries
FM (BOWEC) Reg 6, 58, 118

OSHA Sec 15 & 24


Falling of materials Fatality /body injuries
FMA (BOWEC)

9 Mobile Crane
Struck /crushed by OSHA Act Sec 15.
Body injuries / fatality
machine/Collision FM (BOWEC)(Safety)
Hazard Identification

9 Mobile Crane
Applicable OSH Leg/Reg/COP (in
No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Electrocution (Working near OSHA Sec 15,


Fatality /body injuries
power sources) FMA (BOWEC)

OSHA Sec 15.


Lightning Body injuries / fatality
FMA Sec 23
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Struck /crushed by OSHA Act Sec 15.


Body injuries / fatality
machine/Collision FM (BOWEC)(Safety)

OSHA Sec 15 & 24


Falling of materials Fatality /body injuries
FMA (BOWEC)

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24

OSHA Sec 15,


Fall into excavated trench Body injuries
10 Excavator / Back Hoe FMA (BOWEC)

OSHA Act Sec 15.


FM (BOWEC) (Electrical Hazard)
Potential contact with
Body injuries / fatality Reg 16. 1986 Electricity Supply
underground power line
Act 1990 Electricity Reg. and
rules 1994
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Electrocution (Working near OSHA Sec 15,


Fatality /body injuries
power sources) FMA (BOWEC)

OSHA Sec 15.


Lightning Body injuries / fatality
FMA Sec 23

Struck /crushed by OSHA Act Sec 15.


Body injuries / fatality
machine/Collision FM (BOWEC)(Safety)

OSHA Sec 15,


Fall into excavated trench Body injuries
FMA (BOWEC)

11 Lorry / Dump Truck Struck /crushed by OSHA Act Sec 15.


Body injuries / fatality
machine/Collision FM (BOWEC)(Safety)
Hazard Identification

11 Lorry / Dump Truck Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Inhalation of heavy smoke / OSHA Sec 15,


Chronic health problem
exhaust fume FM (BOWEC) Reg 11 & 14. 1986
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24


Falling of materials Body injuries
FMA (BOWEC)

Struck /crushed by OSHA Act Sec 15.


Body injuries / fatality
machine/Collision FM (BOWEC)(Safety)

OSHA Act Sec 15


12 Roller / Roller Compactor Exposure to noise Chronic hearing problem FM (Noise Exposure)
Reg. 1989.

Body Injuries/ OSHA Sec 15


Body Vibration
Health Impact FMA (BOWEC)

OSHA Act Sec 15


Exposure to noise Chronic hearing problem FM (Noise Exposure)
Reg. 1989.
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Caught in moving parts of OSHA Sec 15 & 24


Body injuries / fatality
machines FMA sec 15,20

13 Power Tool Body Injuries/ OSHA Sec 15


Body Vibration
Health Impact FMA (BOWEC)

OSHA Sec 15
Hand-arm vibration Carpal tunnel syndrome
FMA (BOWEC)

OSHA Sec 15,


Electrocution Fatality /body injuries
FM (BOWEC) Reg. 16
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15
Exposure to noise Chronic hearing problem FM (Noise Exposure)
Reg. 1989.

OSHA Sec 15,


Flying of particles Eye or body injuries
FMA Sec. 24

OSHA Sec 15,


Exposure to sharp object Hand Injuries
FMA Sec. 24

14 Drill / Grinder

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24

Caught in moving parts of OSHA Sec 15 & 24


Body injuries
machines FMA sec 15,20
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15,


Electrocution Fatality /body injuries
FM (BOWEC) Reg. 16

OSHA Sec 15
Exposure to noise Chronic hearing problem FM (Noise Exposure)
Reg. 1989.

Caught in moving parts of OSHA Sec 15 & 24


Body injuries
machines FMA sec 15,20

15 Jack Hammer / Hacker

OSHA Sec 15 & 24


Electrocution Fatality /body injuries
FMA (BOWEC)

OSHA Sec 15
Body vibration Body injuries
FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Leakage of oxy-acetylene OSHA Sec 15 & 24


Fatality /body injuries
hose- fire or explosion FMA (BOWEC)

OSHA Sec 15,


Electrocution Fatality /body injuries
16 FM (BOWEC) Reg. 16

OSHA Sec 15,


Exposed to UV & IR ray permanent eye damage FMA Sec 11 & (BOWEC)
Reg 15

Welding - (Electric/Gases)

OSHA Sec 15 & 24,


Heat Stress Fatigue/ skin rash
FMA Sect. 23

OSHA Sec 15 & 24,


Irritation of respiratory
Exposure to welding fume FM (BOWEC)(Safety)
tract
Reg 14.
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15,


Exposure to welding spark Skin burn FMA Sec 11 & (BOWEC)
Reg 15

OSHA Sec 15 & 24


Falling of materials Fatality /body injuries
FMA (BOWEC)

OSHA Act 15,


Soil collapse into
Body injuries / fatality FM (BOWEC)
trench/Cave in
Reg 116,117 & 118

17 Construction of Main Drains


Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Inhalation of dust/Concrette Irritation of respiratory OSHA Sec 15 & 24


Dust tract FM (Mineral Dust) Reg. 1989

17 Construction of Main Drains Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FMA 1967

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc

OSHA Sec 15.


Lightning Body injuries / fatality
FMA Sec 23

OSHA Sec 15 & 24,


Heat Stress Fatigue/ skin rash
FMA Sect. 23
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Osha Sec. 15 & 24


Falling from Height Body injuries / fatality
FMA (BOWEC)

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)

18 Wall

OSHA Sec 15 & 24


Wall Collapse Body injuries / fatality
FMA (BOWEC)

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24


Falling from Height Body injuries / fatality
FMA (BOWEC)

Entanglement by rotating OSHA Sec 15 & 24


Body injuries / fatality
saw FMA sec 15,20

Irritation of respiratory OSHA Sec 15,


Inhalation of wood dust
tract FM (Mineral Dust) Reg. 1989

OSHA Sec 15,


Flying of nails/ objects Eye or body injuries
FMA Sec. 24

OSHA Sec 15.


Failure of formwork/
Body injuries / fatality FM (BOWEC) (Scaffold)
temporary platform
Part 10 Reg 72-98
19 Formwork
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)
19 Formwork

Protruding nails, starter bar & OSHA Sec 15 & 24


Body injuries
sharp objects FMA 1967

OSHA Sec 15,


Struck or pinch by hammer Hand Injuries
FMA Sec. 24

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)

Collapse/Failure of formwork/ OSHA Sec 15 & 24


Body injuries / fatality
temporary platform FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24


Falling from Height Body injuries / fatality
FMA (BOWEC)

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)

OSHA Sec 15.


Failure of formwork/
Body injuries / fatality FM (BOWEC) (Scaffold)
temporary platform
Part 10 Reg 72-98

Struck or hit by concrete OSHA Sec 15.


Body injuries / fatality
bucket/ mixer FMA (BOWEC)

Concretting (Vibrator
20
machine, mortar pump & etc)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Concretting (Vibrator
20
machine, mortar pump & etc) Splashes of conrete in eyes OSHA Sec 15,
Eye or body injuries
and contact with skin FMA Sec. 24

Falling of concrete bucket OSHA Sec 15 & 24


Fatality /body injuries
from height FMA (BOWEC)

OSHA Sec 15
Body/Hand-arm vibration Body injuries
FMA (BOWEC)

OSHA Sec 15.


Lightning Body injuries / fatality
FMA Sec 23

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24


Falling from Height Body injuries / fatality
FMA (BOWEC)

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)

OSHA Sec 15.


Lightning Body injuries / fatality
FMA Sec 23

21 Installation of Roof
OSHA Sec 15,
Electrocution Fatality /body injuries
FM (BOWEC) Reg. 16
Hazard Identification

21 Installation of Roof Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24,


Heat Stress Fatigue/ skin rash
FMA Sect. 23

Structure Collapse/ OSHA Sec 15.


Wind/Rain
disturbed/budge FMA (BOWEC)

Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)

OSHA Sec 15 & 24


22 Falling from Height Body injuries / fatality
FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Inhalation of dust/Concrette Irritation of respiratory OSHA Sec 15,


Dust tract FM (Mineral Dust) Reg. 1989

Spillage into eyes and Eye injuries, Skin OSHA Sec 15


contact with skin irritation/dermatitis OSH (USECHH) Reg. 2000

Brick Laying
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Skin contact with cement OSHA Sec 15


Skin irritation/dermatitis
mortar OSH (USECHH) Reg. 2000

Brick Laying

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc

Collapse of construction OSHA Sec 15 & 24


Body injuries / fatality
material FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24


23 Falling from Height Body injuries / fatality
FMA (BOWEC)

OSHA Sec 15 & 24,


Heat Stress Fatigue/ skin rash
FMA Sect. 23

Plastering

Splashes of conrete in eyes Eye injuries & skin OSHA Sec 15 & 24
and contact with skin irritation, dermatitis FMA (SHW) & Sec 23

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24


Trip, Slip and Fall Body injuries
FMA (BOWEC)

Inhalation of dust/Concrette Irritation of respiratory OSHA Sec 15,


24 Tiling, Marble and Parquet Dust tract FM (Mineral Dust) Reg. 1989
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No.
24 Sub-Activity
Tiling, Marble and Parquet Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15,


Exposure to sharp object Hand Injuries
FMA Sec. 24

Osha Sec. 15 & 24


Falling from Height Body injuries / fatality
FMA (SHW)(BOWEC)

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)

25 Ceiling

Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)
25 Ceiling Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc

Osha Sec. 15 & 24


Falling from Height Body injuries / fatality
FMA (SHW)(BOWEC)

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)

26 Painting

Slippery & poor Slip, trip & fall - body OSHA Sec 15 & 24
access/egress injuries FMA (BOWEC)
26 Painting Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Inhalation of dust/Painting Irritation of respiratory OSHA Sec 15,


fume tract FM (Mineral Dust) Reg. 1989

* PROBABILITY x
Probability Index Description Severity Index

4 VERY LIKELY : Could happen frequently. Exposures are excessive. 4


3 LIKELY : Could happen occasionally. Exposures are not 3
adequately control.
2 UNLIKELY : Could happen, but only rarely. Exposures are controlled 2
and likely to remain so.
1 HIGHLY UNLIKELY : Could happen but probably never will. Exposures are 1
negligible.
Doc No.
H TASK RISK ASSESSMENT Ref Code / Rev
Assessors name Prepared by: Reviewed by: Approved by:
1) Name: Name: Name:
2) Signature: Signature: Signature:
3) Date: Date: Date:
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Erected by competent/training person only.
2. PE Design required for any scaffold erected more than 15
Engin. & Admin. Control - meters.
Safety awareness, 3. Inspection and supervising of competent person every
C 3 4 Y 12 II
Competent, PE Design, time before its to be used.
Training, Briefing & Monitoring 4. Record keeping.
5. Ensure the material is in good
condition/serviceable
1. Erected by competent/training person only.
Engin. & Admin Control - 2. Safety Harness/belt, lifelines & necessary precaution.
Walking Platform, Safety 3.
C 3 4 Y 12 II
Harness /belt, Training & Briefing/toolbox talk before commencing work. 4.
Briefing Supervise by competent person.
5. Safe Work Practice.

1. All workers must be inducted before commencing of work.


Admin control & PPE 2. All workers must be briefing before commencement and week
Training, Briefing, Signalman, toolbox talks to explain the hazards. 3.
C 3 4 Y 12 II
Safe Work Practice & Safety Provide Toe Board to Open Edge. 4
Helmet Barrier working area to prevent any invasion.
5. Monitoring of work and working area.

Engineering, Admin Control - 1. Ensure all workers aware about a safe work practice &
Provided proper procedure. 2. Briefing before start work. 3. immediately replace
C 2 3 Y 6 I
access/egress, unserviceable or damage equipment. 4. safety belt or lifelines
training/information required for working at height
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Admin Control - Safe 2. All workers must be briefing before commencement and week
C 2 4 Y 8 I
work practice & Briefing. toolbox talks to explain the hazards. 3. Sto
work immediatly.

1. Electrical Hand Tool must be in good condition.


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 2 4 Y 8 I
3. Briefing/Toolbox Talk before start work.
clothing & hand glove.
4. Competent/Training.

1. Scaffold must be check and assessed every week and after


heavy rain or wind, (Refer Checklist) 2.
Record keeping.
Admin. Control - Safe
C 3 4 Y 12 II 3. Immediate action fo any consequences to the
work practice
structure or scaffold condition.
4. PE Design Required for scaffold erected 15 me
and above

Engineering, admin control &


PPE - Shelter, Briefing & C 2 1 N 0 I
Protective clothing
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Erected by competent/training person only.


2. PE Design required for any scaffold erected more than 15
Enggin. & Admin. Control - meters.
Safety awareness, 3. Inspection and supervising of competent person every
C 3 4 Y 12 II
Competent, PE Design, time before its to be used.
Training, Briefing & Monitoring 4. Record keeping.
5. Ensure the material is in good
condition/serviceable

1. Erected by competent/training person only.


Engin. & Admin Control - 2. Safety Harness/belt, lifelines & necessary precaution.
Walking Platform, Safety 3.
C 3 4 Y 12 II
Harness /belt, Training & Briefing/toolbox talk before commencing work. 4.
Briefing Supervise by competent person.
5. Safe Work Practice.

1. All workers must be inducted before commencing of work.


Admin control & PPE 2. All workers must be briefing before commencement and week
Training, Briefing, Signalman, toolbox talks to explain the hazards. 3.
C 3 4 Y 12 II
Safe Work Practice & Safety Provide Toe Board to Open Edge. 4
Helmet Barrier working area to prevent any invasion.
5. Monitoring of work and working area.

Engineering, Admin Control - 1. Ensure all workers aware about a safe work practice &
Provided proper procedure. 2. Briefing before start work. 3. immediately replace
C 2 3 Y 6 I
access/egress, unserviceable or damage equipment. 4. safety belt or lifelines
training/information required for working at height
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Admin Control - Safe 2. All workers must be briefing before commencement and week
C 2 4 Y 8 I
work practice & Briefing. toolbox talks to explain the hazards. 3. Sto
work immediatly.

1. Electrical Hand Tool must be in good condition.


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 2 4 Y 8 I
3. Briefing/Toolbox Talk before start work.
clothing & hand glove.
4. Competent/Training.

1. Scaffold must be check and assessed condition every week a


after heavy rain or wind, (Refer Checklist)
Admin. Control - Safe
C 3 4 Y 12 II 2. Record keeping.
work practice
3. Immediate action for any consequences to the
structure or scaffold condition.
1. Proper PPE must be worn.
2. Briefing before start work.
Engineering, admin control &
3. Supervise an
PPE - Shelter, Briefing & C 2 1 N 0 I
monitoring potential impact to workers. 4. Provide
Protective clothing
shelter/cool place for rest if necessary.
5. Wear a appropriate clothing.

1. Only a good condition of ladder allowed to be used.


Enggin. & Admin. Control - 2. Mantain of good keeping of ladder condition.
Safety awareness, 3.
C 2 4 Y 8 I
Competent, PE Design, Immediate change any damages with serviceable one.
Training, Briefing & Monitoring 4. Ensure the
material is in good condition/serviceable
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Erected by competent/training person only.
2. Hard Barrier/Guard rail.
Engin. & Admin Control -
3. Briefing/toolbox talk before
Walking Platform, Safety
C 3 4 Y 12 II commencing work. 4. Supervise by competent perso
Harness /belt, Training &
5. Safe Work Practice.
Briefing
6. Ensure the
material is in good condition/serviceable

Engineering, Admin Control - 1. Ensure all workers aware about a safe work practice &
Provided proper procedure. 2. Briefing before start work. 3. immediately replace
C 3 2 N 0 I
access/egress, unserviceable or damage equipment. 4. safety belt or lifelines
training/information required for working at height
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Engin, Admin Control & PPE
2. All workers must be briefing before commencement and week
- Guard rail, Safe work practice, C 3 3 Y 9 I
toolbox talks to explain the hazards. 3.
Training & Briefing.
Guarding machine/moving part.
1. Supervise & monitoring at all potential area.
2. Briefing/Toolbox Talk before start work.
3. Training & Safe work Practice.
Admin. Control -
4. Analyze works expose to
Training, Briefing, Job Rotation C 3 2 N 0 I
hazards. 5. To provide body part
& Safe work practice
assessment before work start.

6. Job rotation and rest if necessary


Enggineering & Admin.
1. All workers must used proper PPE at work site. 2
Control - Safety awareness
Un-good condition of machinery need to be check and repair as
-Face mask, C 3 2 N 0 I
posible. 3.
Servicing, Toolbox Talk,
Briefing before start work.
Monitoring

1. All workers must be inducted before commencing work.


Admin. Control & PPE -
2. All workers must use proper P.P.E
Safety awareness
C 3 2 N 0 I To provide competent super visor to supervise the activity full tim
-Ear plug/muff &
initial noise monitoring
Briefing before start work.

1. Electrical Hand Tool must be in good condition.


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 2 4 Y 8 I
3. Briefing/Toolbox Talk before start work.
clothing & hand glove.
4. Competent/Training.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Enggineering & Admin.


1. All workers must used proper PPE at work site. 2
Control - Safety awareness
Un-good condition of machinery need to be check and repair as
-Face mask, C 3 2 N 0 I
posible. 3.
Servicing, Toolbox Talk,
Briefing before start work.
Monitoring

Enggineering & Admin.


Control - Safety awareness 1. All workers must be inducted before commencing of work.
-Barrier, Traffic C 2 3 Y 6 I 2. All workers must be briefing before commencement and week
Control, Training, Briefing & toolbox talks to explain the hazards.
Monitoring

1. All Air compressor must have c ertificate of fitness from DOSH


Admin Control - Only machine
and display at the compressor.
with fitness certified must be C 3 4 Y 12 II
2. Maintenance and servicing as schedule.
used.
3. Record Keeping.

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
Admin. Control & PPE -
To provide competent super visor to supervise the activity.
Safety awareness
C 3 3 Y 9 I
-Ear plug/muff &
4. Briefing before start work.
initial noise monitoring
5. Noise monitoring must be conducted to area and
personal.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. General check before used and the machine must be in good


condition.
Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 3 4 Y 12 II
3. Monthly check/maintenance must in schedule.
clothing & hand glove.
4. Record Keeping.

Admin Control & PPE - 1. All workers must be inducted before commencing of work.
Briefing,Protective clothing, C 3 2 N 0 I 2. All workers must be briefing before commencement and week
hand glove & face shield toolbox talks to explain the hazards.

Enggineering & Admin. 1. Placement generator in open area and suitable.


Control - Safety awareness Un-good condition of machinery need to be check and repair as
-Face mask, C 3 2 N 0 I posible. 3.
Servicing, Toolbox Talk, Maintenance must be done as schedule.
Monitoring 4. Record Keeping.

1. All workers must be inducted before commencing work.


Admin. Control & PPE -
2. All workers must use proper P.P.E
Safety awareness
C 1 2 N 0 I To provide competent super visor to supervise the activity.
-Ear plug/muff &
initial noise monitoring
4. Briefing before start work.

1. All workers must be inducted before commencing of work.


Engin, Admin Control & PPE
2. All workers must be briefing before commencement and week
- Guard rail, Safe work practice, C 3 4 Y 12 II
toolbox talks to explain the hazards. 3.
Training & Briefing.
Guarding machine/moving part.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Engin. & Admin control -
2. All workers must be briefing before commencement and week
Mechanical guard, Safe Work C 2 3 Y 6 I
toolbox talks to explain the hazards. 3.
Practice training & Briefing
Guarding machine/moving part.

Enggineering & Admin.


1. Placement machine in open area and suitable.
Control - Safety awareness
2. Un-good condition of machinery need to be check and repai
-Face mask, C 3 2 N 0 I
as posible.
Servicing, Toolbox Talk,
Maintenance must be done as schedule.
Monitoring

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
Admin. Control -
To provide body part assessment before work start.
Training, Briefing, Job Rotation C 2 2 N 0 I
& Safe work practice
4. Briefing before start work.
5. Job rotation and rest if necessary
1. All workers must be inducted before commencing work.
2. All workers must use proper P.P.E
Admin. Control & PPE -
To provide competent super visor to supervise the activity.
Safety awareness
C 2 2 N 0 I
-Ear plug/muff &
4. Briefing before start work.
initial noise monitoring
5. Noise monitoring must be conducted to area and
personal.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Engin. & Admin control -
2. All workers must be briefing before commencement and week
Mechanical guard, Safe Work C 2 3 Y 6 I
toolbox talks to explain the hazards. 3.
Practice training & Briefing
Guarding machine/moving part.

Enggineering & Admin. 1. All workers must used proper PPE at work site. 2
Control - Safety awareness Un-good condition of machinery need to be check and repair as
-Face mask, C 3 2 N 0 I posible. 3.
Servicing, Toolbox Talk, Toolbox Talk before start work.
Monitoring 4. Place the machine in a good ventilation area.

1. Safe work practice/procedure must be follow


Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 2 2 N 0 I 3. Briefing/Toolbox Talk before start work.
clothing & hand glove. 4. All workers must used proper PPE during work
conducted.

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
Engineering, admin control &
3. Briefing/Toolbox Talk before start work.
PPE - Water
C 3 2 N 0 I 4. Provide water sprinkler/ browser to prevent flying
sprinkling/Browser, Dust mask
dust. 5. supply face mask to worker whi
and training
involved 6. All
workers must used proper PPE during work conducted.
1. All workers must be inducted before commencing work.
2. All workers must use proper P.P.E
Admin. Control -
To provide body part assessment before work start.
Training, Briefing, Job Rotation C 2 2 N 0 I
& Safe work practice
4. Briefing before start work.
5. Job rotation and rest if necessary
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must used proper PPE at work site. 2


Admin. Control & PPE - Un-good condition of machinery need to be check and repair as
Safety awareness posible. 3.
C 3 3 Y 9 I
-Ear plug/muff & Toolbox Talk before start work.
initial noise monitoring 4. stationed machine in open area to prevent sound wave tha
repeat

1. Operator must be inducted before commencing of work.


Competent/license operator only can operate machine
Admin. Control - Safe working
C 3 4 Y 12 II 3. Appoint a signalman with a good communication
load/procedure
operator.
4. Supervise by the experience person.

1. All workers must be inducted before commencing of work.


Admin control & PPE
2. All workers must be briefing before commencement and week
Training, Briefing, Signalman,
C 3 4 Y 12 II toolbox talks to explain the hazards. 3. Av
Safe Work Practice & Safety
to be under loading material.
Helmet
4. Appoint a signalman with a good communication to operato

Enggineering & Admin. 1. Operator must be inducted before commencing of work.


Control - Safety awareness Competent/license operator only can operate machine
-Barrier, Traffic C 2 4 Y 8 I 3. Appoint a signalman with a good communication
Control, Training, Briefing & operator.
Monitoring 4. Supervise by the experience person.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Admin Control & PPE 1. Safe work practice/procedure must be follow


-Briefing, monitoring, Safe 2. Monitoring and analyze the potential of hazard.
C 3 4 Y 12 II
Work Practice, hand glove & 3. Briefing/Toolbox Talk before start work.
Safety Boot

1. All workers must be inducted before commencing of work.


Admin Control - Safe 2. All workers must be briefing before commencement and week
C 1 4 Y 4 I
work practice & Briefing. toolbox talks to explain the hazards. 3. Sto
work immediatly.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and week
-Barrier, Traffic C 3 4 Y 12 II toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4
Monitoring Appoint a Traffic Controller.

1. All workers must be inducted before commencing of work.


Admin control & PPE
2. All workers must be briefing before commencement and week
Training, Briefing, Signalman,
C 3 2 N 0 I toolbox talks to explain the hazards. 3.
Safe Work Practice & Safety
Provide Barricade to Excavate Area. 4
Helmet
Appoint a signalman with a good communication to operator.

Admin. Control - Safe 1. Stop work.


C 2 4 Y 8 I
work practice 2.Terminate if necessary

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and week
Engineering,Admin control- toolbox talks to explain the hazards. 3.
C 3 2 N 0 I
Guardrail/Barrier, monitoring Provide Barricade and Signage at excavated area.
4. Appoint a signalman with a good communication to
operator.

1. All workers must be inducted before commencing work. 2.


Enggineering, Admin. workers must use proper P.P.E 3. To prov
Control & PPE - Safety competent super visor to supervise the activity full time.
awareness C 3 4 Y 12 II 4. To organize Tool Bo
-Isolation, Briefing, Monitoring talk/meeting every time want to start work.
and appropriate PPE 5. To provide ‘Clearance Marki
as per TNB requirement. 6. Permit To Work.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Admin Control & PPE 1. Safe work practice/procedure must be follow


-Briefing, monitoring, Safe 2. Monitoring and analyze the potential of hazard.
C 3 4 Y 12 II
Work Practice, hand glove & 3. Briefing/Toolbox Talk before start work.
Safety Boot

1. All workers must be inducted before commencing of work.


Admin Control - Safe 2. All workers must be briefing before commencement and week
C 2 4 Y 8 I
work practice & Briefing. toolbox talks to explain the hazards. 3. Sto
work immediatly.

Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and week
-Barrier, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Arrange flow of traffic
Monitoring 4. Appoint a Traffic Controller.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and week
Engineering,Admin control- toolbox talks to explain the hazards. 3.
C 3 2 N 0 I
Guardrail/Barrier, monitoring Provide Barricade and Signage at excavated area.
4. Appoint a signalman with a good communication to
operator.

Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and week
-Barrier, Traffic C 3 4 Y 12 II toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4
Monitoring Appoint a Traffic Controller.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Enggineering & Admin. 1. All workers must used proper PPE at work site. 2
Control - Safety awareness Un-good condition of machinery need to be check and repair as
-Face mask, C 3 2 N 0 I posible. 3.
Servicing, Toolbox Talk, Toolbox Talk before start work.
Monitoring 4. Place the machine in a good ventilation area.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Admin control & PPE 1. All workers must be inducted before commencing of work.
Training, Briefing, Signalman, 2. All workers must be briefing before commencement and week
C 2 2 N 0 I
Safe Work Practice & Safety toolbox talks to explain the hazards. 3.
Helmet Appoint a Traffic Controller.

Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and week
-Barrier, Traffic C 3 4 Y 12 II toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to working Area. 4.
Monitoring Appoint a Traffic Controller.

Admin. Control & PPE - 1. All workers must be inducted before commencing work.
Safety awareness 2. All workers must use proper P.P.E
C 3 2 N 0 I
-Ear plug/muff & Noise monitoring
initial noise monitoring 4. Briefing before start work.

1. Conduct assessment body part before start work.


Admin. Control - 2. Workers must be inducted before start work.
Training, Briefing, Job Rotation C 3 2 N 0 I 3. Work monitoring and supervising.
& Safe work practice 4. Workers must have a good health and
to work. 5. Competent/Training.

1. All workers must be inducted before commencing work.


Admin. Control & PPE -
2. All workers must use proper P.P.E
Safety awareness
C 2 2 N 0 I To provide competent super visor to supervise the activity full tim
-Ear plug/muff &
initial noise monitoring
To organize Tool Box talk/meeting every time want to start work.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Engin, Admin Control & PPE 2. All workers must be briefing before commencement and week
- Guard rail, Safe work practice, C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Training & Briefing. Provide guard to moving part if necessary.
4. Supervise the work

1. Workers must be inducted before start work.


Admin. Control -
2. Work monitoring and supervising.
Training, Briefing, Job Rotation C 2 2 N 0 I
3. Workers must have a good health and fit to work.
& Safe work practice
4. Conduct body part assessment before start work.

Admin. Control - 1. Workers must be inducted before start work.


Training, Briefing, Job Rotation C 3 2 N 0 I 2. Work monitoring and supervising.
& Safe work practice 3. Workers must have a good health and fit to work.

Admin control & PPE 1. Electrical Hand Tool must be in good condition.
Training, Briefing, Protective 2. Monitoring and analyze the potential of hazard.
C 3 4 Y 12 II
clothing & 3. Briefing/Toolbox Talk before start work.
hand glove. 4. Competent/Training.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing work.


Admin. Control & PPE -
2. All workers must use proper P.P.E
Safety awareness
C 2 2 N 0 I To provide competent super visor to supervise the activity.
-Ear plug/muff &
initial noise monitoring
4. Briefing before start work.

1. Safe work practice/procedure must be follow


Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
clothing & hand glove. 4. All workers must used proper PPE during work
conducted.
1. All moving part of the machine must be fully guarded.
Engineering, admin control & All workers must be inducted before commencing of work. 3. All
PPE - Guarded, briefing C 3 2 N 0 I workers must be briefing before start work. 4.
and Protective clothing Proper PPE must be worn while working. 5
Provide training to workers which involved.

Admin. Control - Safe 1. Stop work.


C 2 4 Y 8 I
work practice 2.Terminate if necessary

1. All workers must be inducted before commencing of work.


Engin, Admin Control & PPE 2. All workers must be briefing before commencement and week
- Machine Guard, Safe work C 2 3 Y 6 I toolbox talks to explain the hazards. 3.
practice, Training & Briefing. Provide guard to moving part if necessary.
4. Supervise the work
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Electrical Hand Tool must be in good condition.


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 3 4 Y 12 II
3. Briefing/Toolbox Talk before start work.
clothing & hand glove.
4. Competent/Training.

1. All workers must be inducted before commencing work.


Admin. Control & PPE -
2. All workers must use proper P.P.E
Safety awareness
C 2 2 N 0 I To provide competent super visor to supervise the activity.
-Ear plug/muff &
initial noise monitoring
4. Briefing before start work.

1. All workers must be inducted before commencing of work.


Engin, Admin Control & PPE 2. All workers must be briefing before commencement and week
- Machine Guard, Safe work C 2 2 N 0 I toolbox talks to explain the hazards. 3.
practice, Training & Briefing. Provide guard to moving part if necessary.
4. Supervise the work

1. Electrical Hand Tool must be in good condition.


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 2 4 Y 8 I
3. Briefing/Toolbox Talk before start work.
clothing & hand glove.
4. Competent/Training.

1. Electrical Hand Tool must be in good condition.


Admin. Control - 2. Workers must be inducted before start work.
Training, Briefing, Job Rotation C 3 2 N 0 I 3. Work monitoring and supervising.
& Safe work practice 4. Workers must have a good health and fi
work. 5. Competent/Training.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Cartridge must be stored in proper place and secure.


2. The cartridge must have a bucket c/w standby fire extinguishe
Engineering & Admin.
Control - Flash Back Arrestor, 3. Only the hose with flash back arreator allowed to be used.
C 3 4 Y 12 II
Training, Briefing & Hot work Only the competent workers can operate the welding.
permit 5. Working permit needed before start work.
6. Safety briefing and workplace monitoring by
supervisor in charge

1. Electrical Hand Tool must be in good condition.


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 3 4 Y 12 II
3. Briefing/Toolbox Talk before start work.
clothing & hand glove.
4. Competent/Training.
1. Proper PPE must be worn.
2. Briefing before start work.
Admin control & PPE
3. Supervise an
Training, Briefing & Face C 2 2 N 0 I
monitoring potential impact to workers. 4. Provide eye
Shield
wash station for emergency..
5. Wear a appropriate clothing.
1. Proper PPE must be worn.
2. Briefing before start work.
Engineering, admin control &
3. Supervise an
PPE - Shelter, Briefing & C 2 2 N 0 I
monitoring potential impact to workers. 4. Provide
Protective clothing
shelter/cool place for rest if necessary.
5. Wear a appropriate clothing.

1. Safe work practice/procedure must be follow


Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing & Face C 2 2 N 0 I 3. Briefing/Toolbox Talk before start work.
mask 4. All workers must used proper PPE during work
conducted.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Safe work practice/procedure must be follow


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective
C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
clothing, hand glove
4. All workers must used proper PPE during work
& face shield
conducted.

1. All workers must be inducted before commencing of work.


Admin control & PPE
2. All workers must be briefing before commencement and week
Training, Briefing, Signalman,
C 3 4 Y 12 II toolbox talks to explain the hazards. 3.
Safe Work Practice & Safety
Provide Barricade to Excavate Area. 4
Helmet
Appoint a signalman with a good communication to operator.

1. Permit To Work Required before excavation.


Supervise at all potential area in full time.
Engineering control- Shoring/
C 3 4 Y 12 II Briefing/Toolbox Talk before start work. 4.
safe work practice, Supervising
Trenching system required.
5. Training.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Safe work practice/procedure must be follow
2. Monitoring and analyze the potential of hazard.
Engineering, admin control &
3. Briefing/Toolbox Talk before start work.
PPE - Water
C 3 1 N 0 I 4. Provide water sprinkler/ browser to prevent flying
sprinkling/Browser, Dust mask
dust. 5. supply face mask to worker whi
and training
involved 6. All
workers must used proper PPE during work conducted.
Engineering, Admin Control - 1. Ensure all workers aware about a safe work practice &
Provided proper procedure. 2. Briefing before start work. 3. immediately replace
C 2 2 N 0 I
access/egress, unserviceable or damage equipment. 4. safety belt or lifelines
training/information required for working at height

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
Admin. Control -
To provide body part assessment before work start.
Training, Briefing, Job Rotation C 2 2 N 0 I
& Safe work practice
4. Briefing before start work.
5. Job rotation and rest if necessary

1. All workers must be inducted before commencing of work.


Admin Control - Safe 2. All workers must be briefing before commencement and week
C 2 4 Y 8 I
work practice & Briefing. toolbox talks to explain the hazards. 3. Sto
work immediatly.

1. Proper PPE must be worn.


2. Briefing before start work.
Engineering, admin control &
3. Supervise an
PPE - Shelter, Briefing & C 2 1 N 0 I
monitoring potential impact to workers. 4. Provide
Protective clothing
shelter/cool place for rest if necessary.
5. Wear a appropriate clothing.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Engin. & Admin Control - 2. All workers must be briefing before commencement and week
Walking Platform, Safety toolbox talks to explain the hazards. 3.
C 3 4 Y 12 II
Harness /belt, Training & Provide training & safe work practice.
Briefing 4. Monitoring and supervise the
works..

1. All workers must be inducted before commencing of work.


Admin control & PPE 2. All workers must be briefing before commencement and week
Training, Briefing, Signalman, toolbox talks to explain the hazards. 3.
C 2 4 Y 8 I
Safe Work Practice & Safety Provide training & safe work practice.
Helmet 4. Monitoring and supervise the
works..

1. Supervise & monitoring at all potential area.


Admin control & PPE 2. Briefing/Toolbox Talk before start work.
Training, Briefing,safe Work C 2 3 Y 6 I 3. Training & Safe work Practice.
Practice & Safety Helmet 4. Analyze works expose to
hazards.
1. Supervise & monitoring at all potential area.
2. Briefing/Toolbox Talk before start work.
3. Training & Safe work Practice.
Admin. Control - 4. Analyze works expose to
Training, Briefing, Job Rotation C 2 2 N 0 I hazards. 5. To provide body part
& Safe work practice assessment before work start to ensure work fit health.

6. Job rotation a
rest if necessary
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Engin. & Admin Control - 2. All workers must be briefing before commencement and week
Walking Platform, Safety toolbox talks to explain the hazards. 3.
C 3 4 Y 12 II
Harness /belt, Training & Provide training & safe work practice.
Briefing 4. Monitoring and supervise the
works..

1. All workers must be inducted before commencing of work.


Engin, Admin Control & PPE
2. All workers must be briefing before commencement and week
- Safe guard, Safe work C 3 4 Y 12 II
toolbox talks to explain the hazards. 3.
practice, Training & Briefing.
Guarding machine/moving part.

1. Supervise & monitoring at all potential area.


2. Briefing/Toolbox Talk before start work.
Admin Control & PPE -
C 3 2 N 0 I 3. Training & Safe work Practice.
Dust mask and training
4. Analyze works expose to
hazards.
1. Proper PPE must be worn.
2. Briefing before start work.
Admin control & PPE
3. Supervise an
Training, Briefing, Protective C 2 2 N 0 I
monitoring potential impact to workers. 4. Provide eye
clothing
wash station for emergency..
5. Wear a appropriate clothing.
1. Erected by competent/training person only.
2. PE Design required for any scaffold erected more than 15
Enggin. & Admin. Control - meters.
Safety awareness, 3. Inspection and supervising of competent person every
C 3 4 Y 12 II
Competent, PE Design, time before its to be used.
Training, Briefing & Monitoring 4. Record keeping.
5. Ensure the material is in good
condition/serviceable
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
Engineering control -house
C 2 2 N 0 I 3. Briefing/Toolbox Talk before start work.
keeping
4. All workers must used proper PPE during work
conducted.

1. Safe work practice/procedure must be follow


Admin control & PPE - 2. Monitoring and analyze the potential of hazard.
Briefing, Hand Glove and C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
Protective clothing 4. All workers must used proper PPE during work
conducted.

1. All workers must be inducted before commencing of work.


Admin control & PPE 2. All workers must be briefing before commencement and week
Training, Briefing, Signalman, toolbox talks to explain the hazards. 3.
C 3 4 Y 12 II
Safe Work Practice & Safety Provide training & safe work practice.
Helmet 4. Monitoring and supervise the
works..

1. All formwork support such as scaffold must be check frequent


to avoid any miss use or damage by the competent/train person
Admin control & PPE
Training, Briefing, Signalman, All workers must be briefing before commencement and weekly
C 3 4 Y 12 II
Safe Work Practice & Safety toolbox talks to explain the hazards. 3.
Helmet Provide training & safe work practice.
4. Monitoring and supervise the
works..
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Engin. & Admin Control - 2. All workers must be briefing before commencement and week
Walking Platform, Safety toolbox talks to explain the hazards. 3.
C 3 4 Y 12 II
Harness /belt, Training & Provide training & safe work practice.
Briefing 4. Monitoring and supervise the
works..

1. All workers must be inducted before commencing of work.


Admin control & PPE 2. All workers must be briefing before commencement and week
Training, Briefing, Signalman, toolbox talks to explain the hazards. 3.
C 3 4 Y 12 II
Safe Work Practice & Safety Provide training & safe work practice.
Helmet 4. Monitoring and supervise the
works..

1. Erected by competent/training person only.


2. PE Design required for any scaffold erected more than 15
Enggin. & Admin. Control - meters.
Safety awareness, 3. Inspection and supervising of competent person every
C 3 4 Y 12 II
Competent, PE Design, time before its to be used.
Training, Briefing & Monitoring 4. Record keeping.
5. Ensure the material is in good
condition/serviceable

Admin. Control - Safety 1. All workers must be inducted before commencing of work.
awareness 2. All workers must be briefing before commencement and week
C 2 4 Y 0 I
Signalman, Training, Briefing & toolbox talks to explain the hazards. 3.
Monitoring Appoint a Signalman.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Proper PPE must be worn.


Admin control & PPE 2. Briefing before start work.
Training, Briefing, Protective 3. Supervise an
C 2 2 N 0 I
clothing & monitoring potential impact to workers. 4. Provide eye
hand glove. wash station for emergency..
5. Wear a appropriate clothing.

1. All workers must be inducted before commencing of work.


Admin control & PPE 2. All workers must be briefing before commencement and week
Training, Briefing, Signalman, toolbox talks to explain the hazards. 3.
C 3 4 Y 12 II
Safe Work Practice & Safety Provide training & safe work practice.
Helmet 4. Monitoring and supervise the
works..

1. Electrical Hand Tool must be in good condition.


Admin. Control - 2. Workers must be inducted before start work.
Training, Briefing, Job Rotation C 3 3 Y 9 I 3. Work monitoring and supervising.
& Safe work practice 4. Workers must have a good health and fi
work. 5. Competent/Training.

1. All workers must be inducted before commencing of work.


Admin Control - Safe 2. All workers must be briefing before commencement and week
C 2 4 Y 8 I
work practice & Briefing. toolbox talks to explain the hazards. 3. Sto
work immediatly.
1. Supervise & monitoring at all potential area.
2. Briefing/Toolbox Talk before start work.
3. Training & Safe work Practice.
Admin. Control - 4. Analyze works expose to
Training, Briefing, Job Rotation C 2 2 N 0 I hazards. 5. To provide body part
& Safe work practice assessment before work start to ensure work fit health.

6. Job rotation a
rest if necessary
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and week
Engin. & Admin Control - toolbox talks to explain the hazards. 3.
Walking Platform, Safety Provide training & safe work practice.
C 3 4 Y 12 II
Harness /belt, lifelines, Training 4. Monitoring and supervise the wor
& Briefing 5. Follow working at height
procedure. 6.
Training workers.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and week
Admin control & PPE toolbox talks to explain the hazards. 3.
Training, Briefing, Signalman, practically to provide Catch Platform or catch netting at a potent
C 2 4 Y 8 I
Safe Work Practice & Safety area. 4
Helmet Appoint a signalman with a good communication to operator.

5. Safe work practice.

1. All workers must be inducted before commencing of work.


Admin Control - Safe 2. All workers must be briefing before commencement and week
C 3 4 Y 12 II
work practice & Briefing. toolbox talks to explain the hazards. 3. Sto
work immediatly.

1. Electrical Hand Tool must be in good condition.


Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective 3. Briefing/Toolbox Talk before start work.
C 3 4 Y 12 II
clothing & hand 4. Competent/Training.
glove. 5. Proper PPE must be
worn.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Proper PPE must be worn.
2. Briefing before start work.
Engineering, admin control &
3. Supervise an
PPE - Shelter, Briefing & C 3 2 N 0 I
monitoring potential impact to workers. 4. Provide
Protective clothing
shelter/cool place for rest if necessary.
5. Wear a appropriate clothing.
1. All equipment must be place correctly and check daily to
prevent from any falling material when raining or heavy wind
occurs.
Admin. Control - Safe 2. Immediate action must be taken when come
C 3 4 Y 12 II
work practice the unwanted condition that may prevent damage/injury to
property or people.
4. Safe work practice and prosedure working at height must
follow.

1. Proper PPE must be worn.


Engineering, Admin Control - 2. Briefing before start work.
Provided proper 3. Supervise an
C 3 2 N 0 I
access/egress, monitoring potential impact to workers. 4. Issued an
training/information appropriate grip shoe. 5.
Wear a appropriate clothing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and week
Engin. & Admin Control - toolbox talks to explain the hazards. 3.
Walking Platform, Safety Provide training & safe work practice.
C 3 4 Y 12 II
Harness /belt, Training & 4. Monitoring and supervise the wor
Briefing 5. Follow working at height
procedure. 6.
Training workers.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Engineering, admin control &


PPE - Water 1. Provide water sprinkler/ browser to prevent flying dust. 2.
C 3 1 N 0 I
sprinkling/Browser, Dust mask supply face mask to worker which involved
and training

1. Proper PPE must be worn.


2. Briefing before start work.
Admin Control & PPE hand
3. Supervise an
glove, protective clothing & C 3 1 N 0 I
monitoring potential impact to workers. 4. Provide eye
safety glass
wash station for emergency..
5. Wear a appropriate clothing.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Proper PPE must be worn.
2. Briefing before start work.
PPE- hand glove & protective 3. Supervise an
C 3 1 N 0 I
clothing monitoring potential impact to workers. 4. Provide eye
wash station for emergency..
5. Wear a appropriate clothing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and week
Admin control & PPE toolbox talks to explain the hazards. 3.
Training, Briefing, Signalman, practically to provide Catch Platform or catch netting at a potent
C 3 4 Y 12 II
Safe Work Practice & Safety area. 4
Helmet Appoint a signalman with a good communication to operator.

5. Safe work practice.


1. Supervise & monitoring at all potential area.
2. Briefing/Toolbox Talk before start work.
3. Training & Safe work Practice.
Admin. Control -
4. Analyze works expose to
Training, Briefing, Job Rotation C 3 2 N 0 I
hazards. 5. To provide body part
& Safe work practice
assessment before work start.

6. Job rotation and rest if necessary

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and week
toolbox talks to explain the hazards. 3.
Engineering control- Safe
C 2 4 Y 8 I Supervise workers due to the potential area.
work practice, Supervising
4. Used proper working
platform.
5. Safe work practice.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and week
Engin. & Admin Control - toolbox talks to explain the hazards. 3.
Walking Platform, Safety Provide training & safe work practice.
C 3 4 Y 12 II
Harness /belt, Training & 4. Monitoring and supervise the wor
Briefing 5. Follow working at height
procedure. 6.
Training workers.

1. Proper PPE must be worn.


2. Briefing before start work.
Engineering, admin control &
3. Supervise an
PPE - Shelter, Briefing & C 3 2 N 0 I
monitoring potential impact to workers. 4. Provide
Protective clothing
shelter/cool place for rest if necessary.
5. Wear a appropriate clothing.

1. Proper PPE must be worn.


2. Briefing before start work.
PPE- Protective clothing, safety
C 3 2 N 0 I 3. Supervise an
glass & glove
monitoring potential impact to workers. 4. Wear an
appropriate clothing.

1. All workers must be inducted before commencing of work.


Admin control & PPE
2. All workers must be briefing before commencement and week
Training, Briefing, Safe Work
C 2 4 Y 8 I toolbox talks to explain the hazards. 3. To
Practice &
provide working platform.
Safety Helmet
5. Safe work practice.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Proper PPE must be worn.
Engineering, Admin Control - 2. Briefing before start work.
Provided proper 3. Supervise an
C 3 2 N 0 I
access/egress, monitoring potential impact to workers. 4. Issued an
training/information appropriate grip shoe. 5.
Wear a appropriate clothing.
1. Safe work practice/procedure must be follow
2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
Admin control & PPE -
C 3 1 N 0 I 4. Provide water sprinkler/ browser to prevent flying
Dust mask and training
dust. 5. supply face mask to worker whi
involved 6. All
workers must used proper PPE during work conducted.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All moving part of the machine must be fully guarded.


Admin control & PPE - All workers must be inducted before commencing of work. 3. All
Briefing, Hand Glove and C 3 2 N 0 I workers must be briefing before start work. 4.
Protective clothing Proper PPE must be worn while working. 5
Provide training to workers which involved.

1. All workers must be inducted before commencing of work.


Engin. & Admin Control -
2. All workers must be briefing before commencement and week
Working Platform, Safety
C 3 4 Y 12 II toolbox talks to explain the hazards. 3. To
Harness /belt, Training &
provide working platform.
Briefing
4. Safe work practice.

1. All workers must be inducted before commencing of work.


Admin control & PPE
2. All workers must be briefing before commencement and week
Training, Briefing, Safe Work
C 2 4 Y 8 I toolbox talks to explain the hazards. 3. To
Practice &
provide working platform.
Safety Helmet
4. Safe work practice.

1. All workers must be inducted before commencing of work.


Engineering, Admin Control -
2. All workers must be briefing before commencement and week
Provided proper
C 2 3 Y 6 I toolbox talks to explain the hazards. 3. To
access/egress,
provide proper access/egress.
training/information
4. Safe work practice
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Supervise & monitoring at all potential area.
2. Briefing/Toolbox Talk before start work.
3. Training & Safe work Practice.
Admin. Control -
4. Analyze works expose to
Training, Briefing, Job Rotation C 2 2 N 0 I
hazards. 5. To provide body part
& Safe work practice
assessment before work start.

6. Job rotation and rest if necessary

1. All workers must be inducted before commencing of work.


Engin. & Admin Control -
2. All workers must be briefing before commencement and week
Working Platform, Safety
C 3 4 Y 12 II toolbox talks to explain the hazards. 3. To
Harness /belt, Training &
provide working platform.
Briefing
4. Safe work practice.

1. All workers must be inducted before commencing of work.


Admin control & PPE
2. All workers must be briefing before commencement and week
Training, Briefing, Safe Work
C 2 4 Y 8 I toolbox talks to explain the hazards. 3. To
Practice &
provide working platform.
Safety Helmet
4. Safe work practice.

1. All workers must be inducted before commencing of work.


Engineering, Admin Control -
2. All workers must be briefing before commencement and week
Provided proper
C 2 3 Y 6 I toolbox talks to explain the hazards. 3. To
access/egress,
provide proper access/egress.
training/information
4. Safe work practice
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Safe work practice/procedure must be follow
2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
Admin control & PPE -
C 3 2 N 0 I 4. Provide Eye wash station for emergency.
Face mask and training
5. Refer SDS before use the chemical.
6. All workers must used proper PPE
during work conducted.

** SEVERITY = *** RISK RANKING


Description SCORE

FATALITY : Death / Property damage more than RM 100K. 9 -16


MAJOR INJURY / : Normally irreversible. Permanent / partial disability /
ILLNESS / PROPERTY DAMAGE Property damage more than RM 50K to RM 100K. 4-8
MINOR INJURY / : Normally reversible and affect work performance /
ILLNESS / PROPERTY DAMAGE Property damage RM 10K to RM 50K. 1-3
NEGLIGIBLE INJURY / : Not affecting work performance. First aid case /
ILLNESS / PROPERTY DAMAGE Property damage less than RM 10K.
Approved by:

Control
rchy:

ment (PPE)
ng person only.
scaffold erected more than 15

ervising of competent person every

he material is in good

ng person only.
s & necessary precaution.
3.
mmencing work. 4.
on.

d before commencing of work.


before commencement and weekly
zards. 3.
dge. 4.
nt any invasion.
ork and working area.

bout a safe work practice &


start work. 3. immediately replace
ipment. 4. safety belt or lifelines
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3. Stop

be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.

d assessed every week and after


ecklist) 2.

on fo any consequences to the

equired for scaffold erected 15 meter


Control
rchy:

ment (PPE)

ng person only.
scaffold erected more than 15

ervising of competent person every

e the material is in good

ng person only.
s & necessary precaution.
3.
mmencing work. 4.
on.

d before commencing of work.


before commencement and weekly
zards. 3.
dge. 4.
nt any invasion.
ork and working area.

bout a safe work practice &


start work. 3. immediately replace
ipment. 4. safety belt or lifelines
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3. Stop

be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.

d assessed condition every week and


er Checklist)

action for any consequences to the

efing before start work.


3. Supervise and
workers. 4. Provide
cessary.
e clothing.

dder allowed to be used.


d keeping of ladder condition.
3.
ges with serviceable one.
4. Ensure the
erviceable
Control
rchy:

ment (PPE)
ng person only.

riefing/toolbox talk before


4. Supervise by competent person.
5. Safe Work Practice.
6. Ensure the
erviceable

bout a safe work practice &


start work. 3. immediately replace
ipment. 4. safety belt or lifelines
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
rt.
all potential area.
e start work.
ice.
4. Analyze works expose to
5. To provide body part

rotation and rest if necessary

er PPE at work site. 2.


ry need to be check and repair as
3.

d before commencing work.


r P.P.E 3.
sor to supervise the activity full time.
4.

be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
Control
rchy:

ment (PPE)

er PPE at work site. 2.


ry need to be check and repair as
3.

d before commencing of work.


before commencement and weekly
zards.

ve c ertificate of fitness from DOSH


.
and servicing as schedule.
Record Keeping.

d before commencing work.


r P.P.E 3.
sor to supervise the activity.

art work.
ng must be conducted to area and
Control
rchy:

ment (PPE)

d and the machine must be in good

ze the potential of hazard.


aintenance must in schedule.
4. Record Keeping.

d before commencing of work.


before commencement and weekly
zards.

en area and suitable. 2.


ry need to be check and repair as
3.
s schedule.
rd Keeping.

d before commencing work.


r P.P.E 3.
sor to supervise the activity.

art work.

d before commencing of work.


before commencement and weekly
zards. 3.
rt.
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
rt.

n area and suitable.


hinery need to be check and repair
3.
s schedule.

d before commencing work.


r P.P.E 3.
ent before work start.

f necessary
d before commencing work.
r P.P.E 3.
sor to supervise the activity.

art work.
ng must be conducted to area and
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
rt.

er PPE at work site. 2.


ry need to be check and repair as
3.
.
in a good ventilation area.

ure must be follow


alyze the potential of hazard.
box Talk before start work.
t used proper PPE during work

ure must be follow


alyze the potential of hazard.
box Talk before start work.
inkler/ browser to prevent flying
5. supply face mask to worker which
6. All
E during work conducted.
d before commencing work.
r P.P.E 3.
ent before work start.

f necessary
Control
rchy:

ment (PPE)

er PPE at work site. 2.


ry need to be check and repair as
3.
.
n area to prevent sound wave that

before commencing of work. 2.


nly can operate machine
alman with a good communication to

erience person.

d before commencing of work.


before commencement and weekly
zards. 3. Avoid

a good communication to operator.

before commencing of work. 2.


nly can operate machine
alman with a good communication to

erience person.
Control
rchy:

ment (PPE)

ure must be follow


alyze the potential of hazard.
box Talk before start work.

d before commencing of work.


before commencement and weekly
zards. 3. Stop
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.
od communication to operator.

d before commencing of work.


before commencement and weekly
zards. 3.
e at excavated area.
an with a good communication to

before commencing work. 2. All


3. To provide
se the activity full time.
4. To organize Tool Box
tart work.
5. To provide ‘Clearance Marking’
mit To Work.
Control
rchy:

ment (PPE)

ure must be follow


alyze the potential of hazard.
box Talk before start work.

d before commencing of work.


before commencement and weekly
zards. 3. Stop

d before commencing of work.


before commencement and weekly
zards. 3.

ffic Controller.

d before commencing of work.


before commencement and weekly
zards. 3.
e at excavated area.
an with a good communication to

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.
Control
rchy:

ment (PPE)

er PPE at work site. 2.


ry need to be check and repair as
3.
.
in a good ventilation area.
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.

d before commencing of work.


before commencement and weekly
zards. 3.
Area. 4.

d before commencing work.


r P.P.E 3.

. Briefing before start work.

part before start work.


be inducted before start work.
monitoring and supervising.
kers must have a good health and fit
5. Competent/Training.

d before commencing work.


r P.P.E 3.
sor to supervise the activity full time.
4.
ting every time want to start work.
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
f necessary.

before start work.


d supervising.
e a good health and fit to work.
rt assessment before start work.

before start work.


d supervising.
e a good health and fit to work.

be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
Control
rchy:

ment (PPE)

d before commencing work.


r P.P.E 3.
sor to supervise the activity.

ure must be follow


alyze the potential of hazard.
box Talk before start work.
t used proper PPE during work

ine must be fully guarded. 2.


before commencing of work. 3. All
re start work. 4.
le working. 5.
hich involved.

d before commencing of work.


before commencement and weekly
zards. 3.
f necessary.
Control
rchy:

ment (PPE)

be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.

d before commencing work.


r P.P.E 3.
sor to supervise the activity.

d before commencing of work.


before commencement and weekly
zards. 3.
f necessary.

be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.

be in good condition.
e inducted before start work.
onitoring and supervising.
rs must have a good health and fit to
5. Competent/Training.
Control
rchy:

ment (PPE)

proper place and secure.


bucket c/w standby fire extinguisher.

ack arreator allowed to be used. 4.


an operate the welding.
mit needed before start work.
ng and workplace monitoring by

be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.

efing before start work.


3. Supervise and
workers. 4. Provide eye

g.

efing before start work.


3. Supervise and
workers. 4. Provide
cessary.
e clothing.

ure must be follow


alyze the potential of hazard.
box Talk before start work.
t used proper PPE during work
Control
rchy:

ment (PPE)

ure must be follow


alyze the potential of hazard.
box Talk before start work.
t used proper PPE during work

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.
od communication to operator.

efore excavation. 2.
in full time. 3.
art work. 4.
Control
rchy:

ment (PPE)
ure must be follow
alyze the potential of hazard.
box Talk before start work.
inkler/ browser to prevent flying
5. supply face mask to worker which
6. All
E during work conducted.
bout a safe work practice &
start work. 3. immediately replace
ipment. 4. safety belt or lifelines

d before commencing work.


r P.P.E 3.
ent before work start.

f necessary

d before commencing of work.


before commencement and weekly
zards. 3. Stop

efing before start work.


3. Supervise and
workers. 4. Provide
cessary.
e clothing.
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

all potential area.


e start work.
ice.
4. Analyze works expose to

all potential area.


e start work.
ice.
4. Analyze works expose to
5. To provide body part
to ensure work fit health.

6. Job rotation and


Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

d before commencing of work.


before commencement and weekly
zards. 3.
rt.

all potential area.


e start work.
ice.
4. Analyze works expose to

efing before start work.


3. Supervise and
workers. 4. Provide eye

g.
ng person only.
scaffold erected more than 15

ervising of competent person every

he material is in good
Control
rchy:

ment (PPE)

ure must be follow


alyze the potential of hazard.
box Talk before start work.
t used proper PPE during work

ure must be follow


alyze the potential of hazard.
box Talk before start work.
t used proper PPE during work

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

as scaffold must be check frequently


age by the competent/train person.
2.
efore commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

ng person only.
scaffold erected more than 15

ervising of competent person every

he material is in good

d before commencing of work.


before commencement and weekly
zards. 3.
Control
rchy:

ment (PPE)

efing before start work.


3. Supervise and
workers. 4. Provide eye

g.

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

be in good condition.
e inducted before start work.
onitoring and supervising.
rs must have a good health and fit to
5. Competent/Training.

d before commencing of work.


before commencement and weekly
zards. 3. Stop

all potential area.


e start work.
ice.
4. Analyze works expose to
5. To provide body part
to ensure work fit health.

6. Job rotation and


Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the works.
5. Follow working at height
6.

d before commencing of work.


before commencement and weekly
zards. 3.
atform or catch netting at a potential
4.
od communication to operator.

d before commencing of work.


before commencement and weekly
zards. 3. Stop

be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
5. Proper PPE must be
Control
rchy:

ment (PPE)

efing before start work.


3. Supervise and
workers. 4. Provide
cessary.
e clothing.
e correctly and check daily to
ial when raining or heavy wind

action must be taken when comes


ay prevent damage/injury to

prosedure working at height must be

efing before start work.


3. Supervise and
workers. 4. Issued an
5.

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the works.
5. Follow working at height
6.
Control
rchy:

ment (PPE)

wser to prevent flying dust. 2.


hich involved

efing before start work.


3. Supervise and
workers. 4. Provide eye

g.
Control
rchy:

ment (PPE)

efing before start work.


3. Supervise and
workers. 4. Provide eye

g.

d before commencing of work.


before commencement and weekly
zards. 3.
atform or catch netting at a potential
4.
od communication to operator.

all potential area.


e start work.
ice.
4. Analyze works expose to
5. To provide body part

rotation and rest if necessary

d before commencing of work.


before commencement and weekly
zards. 3.
potential area.
4. Used proper working

ork practice.
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the works.
5. Follow working at height
6.

efing before start work.


3. Supervise and
workers. 4. Provide
cessary.
e clothing.

efing before start work.


3. Supervise and
workers. 4. Wear an

d before commencing of work.


before commencement and weekly
zards. 3. To

5. Safe work practice.


Control
rchy:

ment (PPE)

efing before start work.


3. Supervise and
workers. 4. Issued an
5.

ure must be follow


alyze the potential of hazard.
box Talk before start work.
inkler/ browser to prevent flying
5. supply face mask to worker which
6. All
E during work conducted.
Control
rchy:

ment (PPE)

ine must be fully guarded. 2.


before commencing of work. 3. All
re start work. 4.
le working. 5.
hich involved.

d before commencing of work.


before commencement and weekly
zards. 3. To

4. Safe work practice.

d before commencing of work.


before commencement and weekly
zards. 3. To

4. Safe work practice.

d before commencing of work.


before commencement and weekly
zards. 3. To
.
4. Safe work practice.
Control
rchy:

ment (PPE)
all potential area.
e start work.
ice.
4. Analyze works expose to
5. To provide body part

rotation and rest if necessary

d before commencing of work.


before commencement and weekly
zards. 3. To

4. Safe work practice.

d before commencing of work.


before commencement and weekly
zards. 3. To

4. Safe work practice.

d before commencing of work.


before commencement and weekly
zards. 3. To
.
4. Safe work practice.
Control
rchy:

ment (PPE)
ure must be follow
alyze the potential of hazard.
box Talk before start work.
h station for emergency.
re use the chemical.
l workers must used proper PPE

LEVEL

High

Medium

Low
ENERGISER ENTERPRISE SDN BHD OSH TASK RISK A
Department TOWER SITE Personnel participated & consulted:
Area ALL Name Designation
Activity External Works

Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Osha Sec. 15 & 24


Falling of Person Body injuries / fatality
FMA 1967

Osha Sec. 15 & 24


Falling Objects Fatality /body injuries
FMA 1967

OSHA Act Sec 15


Collapse Fatality /body injuries
FMA (BOWEC)

1 Retaining Wall
OSHA Act Sec 15.
Lightning Body injuries / fatality
FMA Act139 Sec 23
Hazard Identification

1 Retaining Wall Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Structure Collapse/ OSHA Act Sec 15


Heavy Wind / Rain
disturbed/budge FMA (BOWEC)

OSHA Act 15,


Heat Stress Fatigue
FM (SHW) Sect. 23 & 28

Sprains, strains & OSHA Act 15,


Ergonomics
backache FMA 1967

Falling of Person from a Osha Sec. 15 & 24


Body injuries
moving machine FMA 1967

Osha Sec. 15 & 24


Struck by Machineries Fatality /body injuries
FMA 1967
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Act Sec 15.


FM (BOWEC) (Electrical Hazard)
Potential contact with
Body injuries / fatality Reg 16. 1986 Electricity Supply
underground power line
Act 1990 Electricity Reg. and
rules 1994

OSHA Act Sec 15


Chronic hearing
Exposure to noise FM (Noise Exposure)
problem
Reg. 1989.

Inhalation of heavy smoke / OSHA Sec 15,


Chronic health problem
exhaust fume FM (BOWEC) Reg 11 & 14. 1986

Irritation of respiratory OSHA Sec 15,


Inhalation of dust
tract FM (Mineral Dust) Reg. 1989
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Flying of particles and cutting OSHA Sec 15,


Eye or body injuries
disc FMA Sec. 24

External Road - (Pneumatic Machine, OSHA Sec 15 & 24


Caught into rotating parts Body injuries / fatality
2 Compactor Roller, Back Pusher, Back Hoe, FMA sec 15,20
Cutting Road Machine, Lorry)

OSHA Sec 15
Body vibration syndrome Body injuries
FMA (BOWEC)

Operation in unsafe mode Body injuries / fatality OSHA Sec 15 & 24

Splashes of hot bitumen in Eye injuries & skin OSHA Sec 15 & 24
eyes and contact with skin irritation, dermatitis FMA (SHW) & Sec 23

Info from: DOSH,Niosh, CROSH,


Manual handling Body strain
CCOHS, Miosh & etc
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24


Exposed hot surface Skin burn
FMA (BOWEC)

Irritation of respiratory OSHA Sec 15


Inhalation of bitumen vapor/
tract / chronic health OSH (USECHH) Reg.
mist
problem in long term 2000

OSHA Act 15,


Heat Stress Fatigue
FM (SHW) Sect. 23 & 28

Struck /crushed by OSHA Sec 15.


Body injuries / fatality
machine/Collision FMA (BOWEC)

OSHA Sec 15,


Soil collapse into
Body injuries / fatality FMA (BOWEC)
trench/Cave in
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHASec 15,
Fall into excavated trench Body injuries
FMA (BOWEC)

OSHA Sect 15.


Harzadous Atmosphere
Toxic Gas (Confined Space) ICOP 2010
(Industrial Code Of Practice)
3 Drainage / Sewerage

1. OSHA Act Sect 15,


2. FMA Sect. 22. 3.
Dengue/ skin
Mosquito/ insect bites Prevention And Control Of
rash/dermatitis
Infectious Diseases Act and
Regulation

OSHA Sec 15 & 24


Drowning Fatality
FMA 1967
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Act Sec 15.


Lightning Body injuries / fatality
FMA Act139 Sec 23

Struck /crushed by OSHA Act Sec 15 & 24


Body injuries / fatality
machine/Collision FMA 1967

Slippery & poor OSHA Act Sec 15 & 24


Body injuries
access/egress FMA 1967

4 External Water Reticulation

OSHA Act 15, FM (BOWEC)


Electrocution Fatality /body injuries (SAFETY) Reg. 16.
1986

OSHA Sec 15.


Lightning Body injuries / fatality
FMA Sec 23
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Act 15, FM (BOWEC)


Electrocution Fatality /body injuries (SAFETY) Reg. 16.
1986

Info from: DOSH,Niosh, CROSH,


Manual handling Body strain
CCOHS, Miosh & etc

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc

Slippery & poor OSHA Act Sec 15 & 24


Body injuries
access/egress FMA 1967

OSHA Act 15,


Heat Stress Fatigue
FM (SHW) Sect. 23 & 28
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)

OSHA Act Sec 15 & 24


Minor fire accident Skin burn
FMA 1967

OSHA Sec 15,


Exposure to sharp object Hand Injuries
External M & E - (Electrical & FMA Sec. 24
TNB Sub-Station)

Minor fire accident/ OSHA Sec 15 & 24


Skin burn
Contact with Hot Part FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sect 15.


Harzadous Atmosphere
Confined Space ICOP 2010
(Industrial Code Of Practice)

OSHA Act Sec 15.


FM (BOWEC) (Electrical Hazard)
Potential contact with
Body injuries / fatality Reg 16. 1986 Electricity Supply
underground power line
Act 1990 Electricity Reg. and
rules 1994

OSHA Act 15,


Soil collapse into
Body injuries / fatality FM (BOWEC)
trench/Cave in
Reg 116,117 & 118

Minor fire accident/ Contact OSHA Sec 15 & 24


Skin burn
with Hot Part FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Act Sec 15 & 24


Exposure to sharp object Hand Injuries FM (BOWEC) (Safety) Reg 148
FM (BOWEC) (SHW) Reg 32

* PROBABILITY x
Probability Index Description Severity Index

4 VERY LIKELY : Could happen frequently. Exposures are excessive. 4


3 LIKELY : Could happen occasionally. Exposures are not 3
adequately control.
2 UNLIKELY : Could happen, but only rarely. Exposures are controlled 2
and likely to remain so.
1 HIGHLY UNLIKELY : Could happen but probably never will. Exposures are 1
negligible.
Doc No.
H TASK RISK ASSESSMENT Ref Code / Rev
Assessors name Prepared by: Reviewed by: Approved by:
1) Name: Name: Name:
2) Signature: Signature: Signature:
3) Date: Date: Date:
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Engin. & Admin Control - 2. All workers must be briefing before commencement and weekly
Working Platform, Safety toolbox talks to explain the hazards. 3.
C 3 4 Y 12 II
Harness /belt, Training & Provide training & safe work practice.
Briefing 4. Monitoring and supervise the
works..

1. All workers must be inducted before commencing of work.


Admin control & PPE 2. All workers must be briefing before commencement and weekly
Training, Briefing, Signalman, toolbox talks to explain the hazards. 3.
C 3 4 Y 12 II
Safe Work Practice & Safety Provide training & safe work practice.
Helmet 4. Monitoring and supervise the
works..

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
Admin. Control - Safe toolbox talks to explain the hazards. 3.
C 2 4 Y 8 I
working load/procedure Provide training & safe work practice.
4. Monitoring and supervise the
works..

1. All workers must be inducted before commencing of work.


Admin Control - Safe 2. All workers must be briefing before commencement and weekly
C 2 4 Y 8 I
work practice & Briefing. toolbox talks to explain the hazards. 3. Stop
work immediatly.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Admin Control - Safe 1. All workers must be brief before commencing of work. 2.
C 2 4 Y 8 I
work practice & Briefing. Stop work immediatly.

Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 2 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weathe

1. Supervise & monitoring at all potential area.


2. Briefing/Toolbox Talk before start work.
3. Training & Safe work Practice.
4. Analyze works expose to
Admin. Control - Safe
C 2 2 N 0 I hazards. 5. To provide body part
work practice
assessment before work start to ensure work fit health.

6. Job rotation an
rest if necessary

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
Admin Control - Safe work toolbox talks to explain the hazards. 3.
C 3 2 N 0 I
practice, Training & Briefing Provide training & safe work practice.
4. Monitoring and supervise the
works..

PPE & Admin Control -


1. Briefing before start work. 2. Plan and schedule work
Signage, Safety Vest, C 3 4 Y 12 II
programme. 3. Place traffic controller to monitor and control .
Training & Briefing
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing work. 2. A


Enggineering, Admin. workers must use proper P.P.E 3. To provid
Control & PPE - Safety competent super visor to supervise the activity full time.
awareness C 3 4 Y 12 II 4. To organize Tool Box
-Isolation, Briefing, Monitoring talk/meeting every time want to start work.
and appropriate PPE 5. To provide ‘Clearance Marking
as per TNB requirement. 6. Permit To Work. (Liase with TNB)

1. All workers must be inducted before commencing work.


Admin. Control & PPE -
2. All workers must use proper P.P.E 3
Safety awareness
C 3 2 N 0 I To provide competent super visor to supervise the activity full time
-Ear plug/muff &
4
initial noise monitoring
To organize Tool Box talk/meeting every time want to start work.

Enggineering & Admin.


1. All workers must used proper PPE at work site. 2.
Control - Safety awareness
Un-good condition of machinery need to be check and repair as
-Face mask, C 3 2 N 0 I
posible. 3.
Servicing, Toolbox Talk,
Toolbox Talk before start work.
Monitoring

Engineering, admin control


& PPE - Water 1. Provide water sprinkler/ browser to prevent flying dust. 2.
C 3 2 N 0 I
sprinkling/Browser, Dust supply face mask to worker which involved
mask and training
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Proper PPE must be worn.
2. Briefing before start work.
Admin control & PPE
3. Supervise and
Training, Briefing, Protective C 2 2 N 0 I
monitoring potential impact to workers. 4. Provide eye
clothing & hand glove.
wash station for emergency..
5. Wear a appropriate clothing.
1. All workers must be inducted before commencing of work.
Engin, Admin Control &
2. All workers must be briefing before commencement and weekly
PPE - Safe guard, Safe work C 3 4 Y 12 II
toolbox talks to explain the hazards. 3.
practice, Training & Briefing.
Guarding machine/moving part.

1. Conduct assessment body part before start work.


Admin. Control - 2. Workers must be inducted before start work.
Training, Briefing, Job C 2 2 N 0 I 3. Work monitoring and supervising.
Rotation & Safe work practice 4. Workers must have a good health and fi
to work. 5. Competent/Training.

Admin. Control - Safe 1. Stop work.


C 2 4 Y 8 I
work practice 2.Terminate if necessary

1. Proper PPE must be worn.


2. Briefing before start work.
PPE- Protective clothing,
C 3 2 N 0 I 3. Supervise and
safety glass & glove
monitoring potential impact to workers. 4. Wear an
appropriate clothing.

1. Lift the objects with good procedure and posture.


Admin. Control - 2. Used trolly or 2 person lift the heavy object if more
Training, Briefing, Job C 2 2 N 0 I than 2 KG .
Rotation & Safe work practice 3. Briefing/Toolbox Talk before start work.
4. ProvideTraining manual handling activities.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Admin Control & PPE - 1. Provive Shelter for workers cooling body from direct sun. 2.
Briefing,Protective clothing, C 3 2 N 0 I Brief workers to drink a lot of plain water.
hand glove & face shield 3. Advise workers to use a appropriate cloth due to hot weathe

Admin control & PPE Dust 1. Briefing before start work.


C 3 2 N 0 I
mask and training 2. supply face mask to worker which involved

Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 2 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weathe

Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barrier, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Control, Training, Briefing & Provide Barricade to Excavate Area. 4.
Monitoring Appoint a Traffic Controller.

1. Permit To Work Required before excavation. 2


Engineering control-
Supervise at all potential area in full time. 3.
Shoring/ safe work practice, C 3 4 Y 12 II
Briefing/Toolbox Talk before start work. 4
Supervising
Training.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
Engineering,Admin control- toolbox talks to explain the hazards. 3.
C 3 2 N 0 I
Guardrail/Barrier, monitoring Provide Barricade and Signage at excavated area.
4. Appoint a signalman with a good communication to
operator.

Detail Requirement: 1. Permit


System. 2. Permit to Work. 3. Isolation Requirement.
Engineering, admin control
4.Requirement to Ensure Safety of Atmosphere. 5. Entry Into
& PPE - Guidelines in
C 3 4 Y 12 II Hazardous Atmosphere. 6. Rescue and Emergency
Industrial Code Of Practice
Services. 7.Health Requirements of Person Working in Confined
2010 (ICOP)
Space. 8. Training. 9. Additional Precautions During
Occupancy of Confined Space. 10. Record Keeping.

Elimination- Pest 1. Appoint pest control to clear all insect/ mosquito as shown in
C 2 3 Y 6 I
control Prevention And Control Of Infectious Diseases Act and Regulation

1. Provide a safe access/egress. 2. Hand rail and walking


Engineering, admin control platform. 3. A proper PPE such as safety harness and lifelines. 4
& PPE - Safe Work C 2 4 Y 8 I Briefing before start work. 5. Supervise and monitoring. 6.
Practice Analyze potential hazard may harm workers. Safe work
procedure.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Admin Control - Safe 2. All workers must be briefing before commencement and weekly
C 1 4 Y 4 I
work practice & Briefing. toolbox talks to explain the hazards. 3. Stop
work immediatly.

1. All workers must be inducted before commencing of work.


Admin. Control - Safety 2. All workers must be briefing before commencement and weekly
awareness, Briefing and C 2 4 Y 8 I toolbox talks to explain the hazards. 3.
Traffic Control Provide Barricade to Excavate Area. 4.
Appoint a Traffic Controller.

1. Proper PPE must be worn.


2. Briefing before start work.
Engin, Admin Control &
3. Supervise and
PPE - Guard rail, Safe work C 2 2 N 0 I
monitoring potential impact to workers. 4. Issued an
practice, Training & Briefing.
appropriate grip shoe. 5.
Wear a appropriate clothing.

1. Electrical Hand Tool must be in good condition.


Admin Control & PPE
2. Monitoring and analyze the potential of hazard.
-Briefing,Protective clothing, C 2 4 Y 8 I
3. Briefing/Toolbox Talk before start work.
hand glove & Safety Boot
4. Competent/Training.

1. All workers must be inducted before commencing of work.


Admin Control - Safe 2. All workers must be briefing before commencement and weekly
C 1 4 Y 0 I
work practice & Briefing. toolbox talks to explain the hazards. 3. Stop
work immediatly.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Electrical Hand Tool must be in good condition.


Admin Control & PPE
2. Monitoring and analyze the potential of hazard.
-Briefing,Protective clothing, C 2 4 Y 8 I
3. Briefing/Toolbox Talk before start work.
hand glove & Safety Boot
4. Competent/Training.

1. Lift the objects with good procedure and posture.


Admin. Control - 2. Used trolly or 2 person lift the heavy object if more
Training, Briefing, Job C 2 2 N 0 I than 2 KG .
Rotation & Safe work practice 3. Briefing/Toolbox Talk before start work.
4. ProvideTraining manual handling activities.
1. Supervise & monitoring at all potential area.
2. Briefing/Toolbox Talk before start work.
3. Training & Safe work Practice.
Admin. Control - 4. Analyze works expose to
Training, Briefing, Job C 2 2 N 0 I hazards. 5. To provide body part
Rotation & Safe work practice assessment before work start to ensure work fit health.

6. Job rotation an
rest if necessary
1. Proper PPE must be worn.
2. Briefing before start work.
Engin, Admin Control &
3. Supervise and
PPE - Guard rail, Safe work C 2 2 N 0 I
monitoring potential impact to workers. 4. Issued an
practice, Training & Briefing.
appropriate grip shoe. 5.
Wear a appropriate clothing.

Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 2 2 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weathe
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal
1. All Protective
workers Equipment
must be inducted (PPE)
before commencing of work.
2. All workers must be briefing before commencement and weekly
Admin control & PPE toolbox talks to explain the hazards. 3.
Training, Briefing, Signalman, practically to provide Catch Platform or catch netting at a potentia
C 3 4 Y 12 II
Safe Work Practice & Safety area. 4.
Helmet Appoint a signalman with a good communication to operator.

5. Safe work
1. All workers must practice.
be inducted before commencing of work.
2. No smoking or naked fire below 30 meters from the potential
Admin Control & PPE -
area. (Briefing & signages)
Briefing,Protective clothing, C 2 2 N 0 I
3. Provide training & safe work practice
hand glove & face shield
4.
Monitoring and supervise the works..

1. All moving part of the machine must be fully guarded. 2


Engineering, admin control
All workers must be inducted before commencing of work. 3. All
& PPE - Guarded,
C 3 2 N 0 I workers must be briefing before start work. 4.
briefing and Protective
Proper PPE must be worn while working. 5.
clothing
Provide training to workers which involved.

1. Permit To Work Required before excavation. 2


Admin Control & PPE - Supervise at all potential area in full time. 3.
Briefing,Protective clothing, C 3 3 Y 9 I Briefing/Toolbox Talk before start work. 4
hand glove & face shield Training.
5. Used appropriate PPE
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Detail Requirement: 1. Permit


System. 2. Permit to Work. 3. Isolation Requirement.
Engineering, admin control
4.Requirement to Ensure Safety of Atmosphere. 5. Entry Into
& PPE - Guidelines in
C 3 4 Y 12 II Hazardous Atmosphere. 6. Rescue and Emergency
Industrial Code Of Practice
Services. 7.Health Requirements of Person Working in Confined
2010 (ICOP)
Space. 8. Training. 9. Additional Precautions During
Occupancy of Confined Space. 10. Record Keeping.

1. All workers must be inducted before commencing work. 2. A


Enggineering, Admin. workers must use proper P.P.E 3. To provid
Control & PPE - Safety competent super visor to supervise the activity full time.
awareness C 3 4 Y 12 II 4. To organize Tool Box
-Isolation, Briefing, Monitoring talk/meeting every time want to start work.
and appropriate PPE 5. To provide ‘Clearance Marking
as per TNB requirement. 6. Permit To Work.

1. Permit To Work Required before excavation. 2


Engineering control-
Supervise at all potential area in full time. 3.
Shoring/ safe work practice, C 3 4 Y 12 II
Briefing/Toolbox Talk before start work. 4
Supervising
Training.

1. Permit To Work Required for Hot Job.


Admin Control & PPE -
2. Flashback Arrestor is compulsory.
Briefing,Protective clothing, C 3 2 N 0 I
3. Briefing/Toolbox Talk before start work.
hand glove & face shield
4. Competent/Training.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All moving part of the machine must be fully guarded. 2


Engineering, admin control
All workers must be inducted before commencing of work. 3. All
& PPE - Guarded,
C 2 2 N 0 I workers must be briefing before start work. 4.
briefing and Protective
Proper PPE must be worn while working. 5.
clothing
Provide training to workers which involved.

** SEVERITY = *** RISK RANKING


Description SCORE

FATALITY : Death / Property damage more than RM 100K. 9 -16


MAJOR INJURY / : Normally irreversible. Permanent / partial disability /
ILLNESS / PROPERTY DAMAGE Property damage more than RM 50K to RM 100K. 4-8
MINOR INJURY / : Normally reversible and affect work performance /
ILLNESS / PROPERTY DAMAGE Property damage RM 10K to RM 50K. 1-3
NEGLIGIBLE INJURY / : Not affecting work performance. First aid case /
ILLNESS / PROPERTY DAMAGE Property damage less than RM 10K.
Approved by:

Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

d before commencing of work.


before commencement and weekly
zards. 3. Stop
Control
rchy:

ment (PPE)

efore commencing of work. 2.

cooling body from direct sun. 2.


plain water.
appropriate cloth due to hot weather.

all potential area.


e start work.
ice.
4. Analyze works expose to
5. To provide body part
to ensure work fit health.

6. Job rotation and

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

2. Plan and schedule work


ontroller to monitor and control .
Control
rchy:

ment (PPE)

before commencing work. 2. All


3. To provide
se the activity full time.
4. To organize Tool Box
tart work.
5. To provide ‘Clearance Marking’
mit To Work. (Liase with TNB)

d before commencing work.


r P.P.E 3.
sor to supervise the activity full time.
4.
ting every time want to start work.

er PPE at work site. 2.


ry need to be check and repair as
3.
.

wser to prevent flying dust. 2.


hich involved
Control
rchy:

ment (PPE)

efing before start work.


3. Supervise and
workers. 4. Provide eye

g.
d before commencing of work.
before commencement and weekly
zards. 3.
rt.

part before start work.


be inducted before start work.
monitoring and supervising.
kers must have a good health and fit
5. Competent/Training.

efing before start work.


3. Supervise and
workers. 4. Wear an

rocedure and posture.


2 person lift the heavy object if more

box Talk before start work.


g manual handling activities.
Control
rchy:

ment (PPE)

cooling body from direct sun. 2.


plain water.
appropriate cloth due to hot weather.

sk to worker which involved

cooling body from direct sun. 2.


plain water.
appropriate cloth due to hot weather.

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.

efore excavation. 2.
in full time. 3.
art work. 4.
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
e at excavated area.
an with a good communication to

1. Permit
Isolation Requirement.
ety of Atmosphere. 5. Entry Into
6. Rescue and Emergency
nts of Person Working in Confined
9. Additional Precautions During
e. 10. Record Keeping.

r all insect/ mosquito as shown in


ectious Diseases Act and Regulation

ss. 2. Hand rail and walking


ch as safety harness and lifelines. 4.
Supervise and monitoring. 6.
harm workers. Safe work
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3. Stop

d before commencing of work.


before commencement and weekly
zards. 3.
e Area. 4.

efing before start work.


3. Supervise and
workers. 4. Issued an
5.

be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.

d before commencing of work.


before commencement and weekly
zards. 3. Stop
Control
rchy:

ment (PPE)

be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.

rocedure and posture.


2 person lift the heavy object if more

box Talk before start work.


g manual handling activities.
all potential area.
e start work.
ice.
4. Analyze works expose to
5. To provide body part
to ensure work fit health.

6. Job rotation and

efing before start work.


3. Supervise and
workers. 4. Issued an
5.

cooling body from direct sun. 2.


plain water.
appropriate cloth due to hot weather.
Control
rchy:

ment (PPE)
d before commencing of work.
before commencement and weekly
zards. 3.
atform or catch netting at a potential
4.
od communication to operator.

d before commencing of work.


elow 30 meters from the potential

rovide training & safe work practice.


4.
works..

ine must be fully guarded. 2.


before commencing of work. 3. All
re start work. 4.
le working. 5.
hich involved.

efore excavation. 2.
in full time. 3.
art work. 4.

E
Control
rchy:

ment (PPE)

1. Permit
Isolation Requirement.
ety of Atmosphere. 5. Entry Into
6. Rescue and Emergency
nts of Person Working in Confined
9. Additional Precautions During
e. 10. Record Keeping.

before commencing work. 2. All


3. To provide
se the activity full time.
4. To organize Tool Box
tart work.
5. To provide ‘Clearance Marking’
mit To Work.

efore excavation. 2.
in full time. 3.
art work. 4.

or Hot Job.
mpulsory.
ore start work.
Control
rchy:

ment (PPE)

ine must be fully guarded. 2.


before commencing of work. 3. All
re start work. 4.
le working. 5.
hich involved.

LEVEL

High

Medium

Low
ENERGISER ENTERPRISE SDN BHD OSH TASK RISK A
Department TOWER SITE Personnel participated & consulted:
Area ALL Name Designation
Activity General Activities

Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)

Info from: DOSH,Niosh, CROSH,


Manual handling Sprains, strains
CCOHS, Miosh & etc

Loading and unloading of construction


1
materials

OSHA Sec 15,


Snapping of lifting gear Fatality /Body injuries
FMA 1967
Loading and unloading of construction
Hazard Identification
1
materials

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc

OSHA Sec 15 & 24


Struck by material Body injuries
FMA (BOWEC)

OSHA Sec 15 & 24


Falling from height Body injuries / fatality
FMA (BOWEC)

Installation of temporary access / Sprains, strains & Info from: DOSH,Niosh, CROSH,
2 Manual handling
working platform backache CCOHS, Miosh & etc

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Irritation of respiratory OSHA Sec 15 & 24


Inhalation of thinner/paint
tract / chronic health OSH (USECHH)
vapor/ mist
problem in long term Reg. 2000

OSHA Sec 15 & 24


Splashes of hinner/paint in Eye injuries & skin
FMA (SHW) & Sec 23
eyes and contact with skin irritation, dermatitis
OSH (USECHH) Reg. 2000

3 Application of painting
Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,
Body strain
& repetitive motion CCOHS, Miosh & etc

Fire hazard - Smoking while OSHA Sec 15 & 24


Skin burnt
painting FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24


Falling from height Body injuries / fatality
FMA (BOWEC)

OSHA Sec 15 & 24


Splashes in eyes and contact Eye injuries & skin
FMA (SHW) & Sec 23
with skin irritation, dermatitis
OSH (USECHH) Reg. 2000

Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)

Sprains, strains & Info from: DOSH,Niosh, CROSH,


Refilling of fuel, hydraulic & application Manual handling
4 backache CCOHS, Miosh & etc
of lubricant
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Refilling of fuel,
Sub-Activity
hydraulic & application Hazards Consequences addition to OSHA Sec 15,
4 FM(SHW) reg)
of lubricant

Irritation of respiratory OSHA Sec 15 & 24


Inhalation of vapor/ fume tract / chronic health OSH (USECHH)
problem in long term Reg. 2000

OSHA Sec 15 & 24


Fire & explosion Body injuries / fatality
FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Sprains, strains & Info from: DOSH,Niosh, CROSH,


Manual handling
backache CCOHS, Miosh & etc

OSHA Act Sec 15


Chronic hearing
Exposure to noise FM (Noise Exposure)
problem
Reg. 1989.

OSHA Sec 15 & 24


Flying of concrete particles Eye / body injuries
FMA (BOWEC)

5 Hacking & drilling of concrete structure

Irritation of respiratory OSHA Sec 15,


Exposure to concrete dust
tract FM (Mineral Dust) Reg. 1989

Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15 & 24


Falling from height Body injuries / fatality
FMA (BOWEC)

OSHA Sec 15 & 24


Inhalation of vapor /mist Chronic health problem OSH (USECHH)
Reg. 2000

OSHA Sec 15 & 24


Splashes in eyes and contact Eye injuries, Skin
FMA (SHW) & Sec 23
with skin irritation/dermatitis
OSH (USECHH) Reg. 2000

6 Application of pesticide
Sprains, strains & Info from: DOSH,Niosh, CROSH,
Manual handling
backache CCOHS, Miosh & etc

Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Slip, trip & fall- body


Insufficient lighting
injuries

Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)

Unprotected floor opening/ Slip, trip & fall- body OSHA Sec 15 & 24
edge injuries / fatality FMA sect. 8, 15, 88 (BOWEC)

1. OSHA Act Sect 15,


2. FMA Sect. 22. 3.
Dengue/ skin
Mosquito/ insect bites Prevention And Control Of
rash/dermatitis
Infectious Diseases Act and
Regulation

Falling of construction OSHA Sec 15 & 24


Fatality /body injuries
material from height FMA (BOWEC)

7 Workplace Inspection & site visit


Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

7 Workplace Inspection & site visit

Protruding nails, starter bar & OSHA Sec 15 & 24


Body injuries
sharp objects FMA 1967

OSHA Sec 15 & 24,


Heat stress Fatigue/ skin rash
FMA Sect. 23

Struck against object/ OSHA Act Sec 15.


Body injuries
structure FM (BOWEC)(Safety)

OSHA Sec 15.


Thunder and lightning. Body injuries/ fatality
FMA Sec 23

Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Act Sec 15.


Struck against object Body injuries
FM (BOWEC)(Safety)

Inhalation of heavy smoke / Irritation of respiratory OSHA Sec 15,


exhaust fume tract FM (BOWEC) Reg 11 & 14. 1986

OSHA Sec 15 & 24


Contact with hot parts Skin burnt
FMA (BOWEC)

OSHA Act Sec 15


Chronic hearing
Exposure to noise FM (Noise Exposure)
problem
Reg. 1989.
8 Operation of genset & air compressor
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
8 Operation of genset & air compressor FM(SHW) reg)

OSHA Sec 15 & 24


Fire & explosion Body injuries / fatality
FMA (BOWEC)

OSHA Act 15, FM (BOWEC)


Electric shock/ electrocution Body injuries / fatality (SAFETY) Reg. 16.
1986

OSHA Sec 15.


Struck by pressure hoses Body injuries
FMA Reg 4 & 118

FM - Rules (Boiler and


Compressor) 1970 & FMA
Unfit/ unsafe machine Body injuries / fatality
(Notification,Cert of Fitness &
Insp.) Reg.1970
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Osha Sec. 15 & 24


Falling from height /
Fatality /Body injuries FM (SHW) Reg 12, 32 & (Scaffold)
Unprotected edges
Pt 10 Reg 72-98

Slippery & poor Slip, trip & fall - body OSHA Sec 15,
access/egress injuries FM (SHW) & (BOWEC)

9 House Keeping
Info from: DOSH,Niosh, CROSH,
Manual handling Sprains, strains
CCOHS, Miosh & etc

OSHA Sec 15,


Inhalation of dust Irritate respiratory tract
FM (Mineral Dust) Reg. 1989

OSHA Sec 15,


Exposed to UV & IR ray permanent eye damage FMA Sec 11 & (BOWEC)
Reg 15
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15,


Exposure to welding spark Skin burnt FMA Sec 11 & (BOWEC)
Reg 15

OSHA Sec 15,


Electrocution Fatality /body injuries
FM (BOWEC) Reg. 16

OSHA Sec 15 & 24,


Irritation of respiratory
Exposure to welding fume FM (BOWEC)(Safety)
tract
Reg 14.

OSHA Act Sec 15 & 24


Minor fire accident Skin burnt
FMA 1967
10 Welding, grinding & oxy-cutting
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
10 Welding, grinding & oxy-cutting FM(SHW) reg)

Leakage of oxy-acetylene OSHA Sec 15 & 24


Fatality /body injuries
hose- fire or explosion FMA (BOWEC)
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

Irritation of respiratory OSHA Sec 15,


Inhalation of dust
tract FM (Mineral Dust) Reg. 1989

OSHA Sec 15,


Flying of particles Eye or body injuries
FMA Sec. 24

OSHA Sec 15
Body vibration Body injuries
FMA (BOWEC)

Ergonomic- awkward position Info from: DOSH,Niosh, CROSH,


Body strain
& repetitive motion CCOHS, Miosh & etc
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

OSHA Sec 15
Exposure to noise in long Chronic hearing
FM (Noise Exposure)
term problem
Reg. 1989.

Operation of pneumatic/electrical
11
powered hand tools.

OSHA Sec 15,


Flying of sharp object Eye or body injuries
FMA Sec. 24

OSHA Sec 15 & 24


Exposure to rotating parts Hand injuries
FMA sec 15,20

OSHA Sec 15,


Electrocution Fatality /body injuries
FM (BOWEC) Reg. 16

* PROBABILITY x
Probability Index Description Severity Index
Hazard Identification

Applicable OSH Leg/Reg/COP (in


No. Sub-Activity Hazards Consequences addition to OSHA Sec 15,
FM(SHW) reg)

4 VERY LIKELY : Could happen frequently. Exposures are excessive. 4


3 LIKELY : Could happen occasionally. Exposures are not 3
adequately control.
2 UNLIKELY : Could happen, but only rarely. Exposures are controlled 2
and likely to remain so.
1 HIGHLY UNLIKELY : Could happen but probably never will. Exposures are 1
negligible.
Doc No.
H TASK RISK ASSESSMENT Ref Code / Rev
Assessors name Prepared by: Reviewed by: Approved by:
1) Name: Name: Name:
2) Signature: Signature: Signature:
3) Date: Date: Date:
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. Proper PPE must be worn.
Engineering, Admin Control 2. Briefing before start work.
- Provided proper 3. Supervise and
C 2 2 Y 4 I
access/egress, monitoring potential impact to workers.
training/information 4. Issued an appropriate grip shoe.
5. Wear a appropriate clothing.
1. All workers must be inducted before commencing of work.
Admin control & PPE 2. All workers must be briefing before commencement and weekly
Training, Briefing, Safe Work toolbox talks to explain the hazards. 3.
C 2 4 Y 8 II
Practice & Provide training & safe work practice.
Safety Helmet 4. Monitoring and supervise the
works..

1. Lift the objects with good procedure and posture.


Admin. Control - 2. Used trolly or 2 person lift the heavy object if more
Training, Briefing, Job C 3 2 Y 6 I than 2 KG .
Rotation & Safe work practice 3. Briefing/Toolbox Talk before start work.
4. ProvideTraining manual handling activities.

1. Only Machiineries with the fit certificate (PMA) can be used at


site work. 2. Daily checklist for machineries to be fill up before
Comply SWL and inspection
C 3 3 Y 9 I start work. 3. SWL must be follow and monitoring by supervisor. 4
of machineries & lifting gears.
Change any damages item immediately. (Stop work if
necessary/change other machine)
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. All workers must be inducted before commencing work.
2. All workers must use proper P.P.E 3
Admin. Control -
To provide body part assessment before work start.
Training, Briefing, Job C 3 2 N 0 I
Rotation & Safe work practice
4. Briefing before start work.
5. Job rotation and rest if necessary
1. All workers must be inducted before commencing of work.
2. All workers must be briefing before commencement and weekly
Admin. Control - Safety toolbox talks to explain the hazards. 3.
C 2 2 N 0 I
awareness Provide training & safe work practice.
4. Monitoring and supervise the
works..

1. All workers must be inducted before commencing of work.


Engin. & Admin Control - 2. All workers must be briefing before commencement and weekly
Walking Platform, Safety toolbox talks to explain the hazards. 3.
C 3 4 Y 0 I
Harness /belt, lifelines, Provide training & safe work practice.
Training & Briefing 4. Monitoring and supervise the
works..

1. Lift the objects with good procedure and posture.


Admin. Control - 2. Used trolly or 2 person lift the heavy object if more
Training, Briefing, Job C 3 2 N 0 I than 2 KG .
Rotation & Safe work practice 3. Briefing/Toolbox Talk before start work.
4. ProvideTraining manual handling activities.

1. All workers must be inducted before commencing of work.


Admin control & PPE 2. All workers must be briefing before commencement and weekly
Training, Briefing, Safe Work toolbox talks to explain the hazards. 3.
C 2 4 Y 0 I
Practice & Provide training & safe work practice.
Safety Helmet 4. Monitoring and supervise the
works..
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
Admin control & PPE Dust
C 3 2 N 0 I 4. Provide Eye wash station for emergency.
mask and training
5. Refer SDS before use the chemical.
6. All workers must used proper PPE
during work conducted.

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
PPE- Protective clothing,
C 3 2 N 0 I 4. Provide Eye wash station for emergency.
safety glass & glove
5. Refer SDS before use the chemical.
6. All workers must used proper PPE
during work conducted.

1. All workers must be inducted before commencing work.


Admin. Control - 2. All workers must use proper P.P.E 3
Training, Briefing, Job To provide body part assessment before work start.
C 2 2 N 0 I
Rotation & safe lifting
procedure 4. Briefing before start work.
5. Job rotation and rest if necessary
1. All workers must be inducted before commencing of work.
2. No smokimg or naked fire below 30 meters from the potential
Elimination & Admin area. (Briefing & signages)
C 2 2 N 0 I
Control - No spark source 3. Provide training & safe work practice
4.
Monitoring and supervise the works..
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Engin. & Admin Control - 2. All workers must be briefing before commencement and weekly
Walking Platform, Safety toolbox talks to explain the hazards. 3.
C 3 4 Y 12 II
Harness /belt, lifelines, Provide training & safe work practice.
Training & Briefing 4. Monitoring and supervise the
works..

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
PPE- Protective clothing,
C 3 2 N 0 I 4. Provide Eye wash station for emergency.
safety glass & glove
5. Refer SDS before use the chemical.
6. All workers must used proper PPE
during work conducted.
1. Proper PPE must be worn.
Engineering, Admin Control 2. Briefing before start work.
- Provided proper 3. Supervise and
C 2 2 N 0 I
access/egress, monitoring potential impact to workers. 4. Issued an
training/information appropriate grip shoe. 5.
Wear a appropriate clothing.

1. Lift the objects with good procedure and posture.


Admin. Control -
2. Used trolly or 2 person lift the heavy object if more
Training, Briefing, Job
C 2 2 N 0 I than 2 KG .
Rotation & safe lifting
3. Briefing/Toolbox Talk before start work.
procedure
4. ProvideTraining manual handling activities.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
Admin control & PPE Dust
C 3 2 N 0 I 4. Provide Eye wash station for emergency.
mask and training
5. Refer SDS before use the chemical.
6. All workers must used proper PPE
during work conducted.

1. All workers must be inducted before commencing of work.


2. No s,okimg or naked fire below 30 meters from the potential
Admin. Control Training,
area.
Briefing & Safety C 3 4 Y 0 I
3. Provide training & safe work practice.
Awareness
4. Monitoring and supervise
the works..
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Lift the objects with good procedure and posture.


Admin. Control -
2. Used trolly or 2 person lift the heavy object if more
Training, Briefing, Job
C 2 2 N 0 I than 2 KG .
Rotation & safe lifting
3. Briefing/Toolbox Talk before start work.
procedure
4. ProvideTraining manual handling activities.

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E 3
Admin. Control & PPE -
To provide competent super visor to supervise the activity.
Safety awareness
C 3 2 N 0 I
-Ear plug/muff &
4. Briefing before start work.
initial noise monitoring
5. Noise monitoring must be conducted to area and
personal.

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
PPE- Protective clothing,
C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
safety glass & glove
4. All workers must used proper PPE during work
conducted.
1. Safe work practice/procedure must be follow
2. Monitoring and analyze the potential of hazard.
Admin control & PPE 3. Briefing/Toolbox Talk before start work.
Safety Awareness C 3 2 N 0 I 4. Provide water sprinkler/ browser to prevent flying
Dust mask and training dust. 5. supply face mask to worker which
involved 6. All
workers must used proper PPE during work conducted.

1. Proper PPE must be worn.


Engineering, Admin Control 2. Briefing before start work.
- Provided proper 3. Supervise and
C 2 2 N 0 I
access/egress, monitoring potential impact to workers. 4. Issued an
training/information appropriate grip shoe. 5.
Wear a appropriate clothing.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Engin. & Admin Control - 2. All workers must be briefing before commencement and weekly
Walking Platform, Safety toolbox talks to explain the hazards. 3.
C 3 4 Y 12 II
Harness /belt, lifelines, Provide training & safe work practice.
Training & Briefing 4. Monitoring and supervise the
works..

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
Admin control & PPE 3. Briefing/Toolbox Talk before start work.
Safety Awareness C 3 2 N 0 I 4. Provide Eye wash station for emergency.
Dust mask and training 5. Refer SDS before use the chemical.
6. All workers must used proper PPE
during work conducted.

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
PPE- Protective clothing,
C 3 2 N 0 I 4. Provide Eye wash station for emergency.
safety glass & glove
5. Refer SDS before use the chemical.
6. All workers must used proper PPE
during work conducted.
1. Lift the objects with good procedure and posture.
Admin. Control -
2. Used trolly or 2 person lift the heavy object if more
Training, Briefing, Job
C 2 2 N 0 I than 2 KG .
Rotation & safe lifting
3. Briefing/Toolbox Talk before start work.
procedure
4. ProvideTraining manual handling activities.
1. Proper PPE must be worn.
Engineering, Admin Control 2. Briefing before start work.
- Provided proper 3. Supervise and
C 2 2 N 0 I
access/egress, monitoring potential impact to workers. 4. Issued an
training/information appropriate grip shoe. 5.
Wear a appropriate clothing.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. All workers must be inducted before commencing work.
2. All workers must use proper P.P.E 3
Admin. Control -
To provide body part assessment before work start.
Training, Briefing, Job C 2 2 N 0 I
Rotation & Safe work practice
4. Briefing before start work.
5. Job rotation and rest if necessary
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Provide safe & secure walk way.


Elimination- Provide sufficient 2. Briefing about safety matters and site condition before
C 2 2 N 4 I
lighting entring workplace.
3. Provide local lighting if necessary.

1. Proper PPE must be worn.


Engineering, Admin Control 2. Briefing before start work.
- Provided proper 3. Supervise and
C 2 2 N 0 I
access/egress, monitoring potential impact to workers. 4. Issued an
training/information appropriate grip shoe. 5.
Wear a appropriate clothing.
1. Provide safe & secure walk way.
2. Briefing about safety matters and site condition before
entring workplace.
Elimination- Provide edge
C 2 4 Y 12 II 3. All unprotected floor opening/ edge install hard
protection
barricade. 4. Monitoring
activities near the visiting people. 5. Stop
work at a risky area if necessary.

1. Appoint pest control to clear all insect/ mosquito as shown in


Elimination- Pest Prevention And Control Of Infectious Diseases Act and Regulation
C 2 3 Y 6 I
control 2.
Proper Housekeeping and safe environment.

1. Provide safe & secure walk way. (Barrier & Signages)


2. Briefing about safety matters and
Admin control & PPE
site condition before entring workplace.
Training, Briefing, Signalman,
C 3 4 Y 12 II 3. Avoid to be under loading materia
Safe Work Practice & Safety
4. Monitoring activities
Helmet
near the visiting people. 5. Stop work at
risky area if necessary.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All moving part of the machine must be fully guarded. 2


All workers must be inducted before commencing of work. 3. All
Engineeering & Admin
C 2 2 N 0 I workers must be briefing before start work. 4.
control -house keeping
Proper PPE must be worn while working. 5.
Provide training to workers which involved.

Engineering, admin control 1. Provive Shelter for workers cooling body from direct sun. 2.
& PPE - Shelter, C 2 1 N 0 I Brief workers to drink a lot of plain water.
Briefing & Protective clothing 3. Advise workers to use a appropriate cloth due to hot weathe

1. Provide safe & secure walk way.


Enggineering & Admin. 2. Briefing about safety matters and site condition before
Control - Safety awareness entring workplace.
-Barrier, Traffic C 2 4 Y 8 I 3. Avoid to be under loading material.
Control, Training, Briefing & 4. Monitoring activities near the visiting people
Monitoring 5. Stop work at a risky area if necessary.

1. Provide safe & secure walk way.


2. Briefing about safety matters and site condition before
Admin Control - Safe
C 2 4 Y 8 I entring workplace.
work practice & Briefing.
3. Stop activities immediattely when storm/thunder seen.

1. Proper PPE must be worn.


Engineering, Admin Control 2. Briefing before start work.
- Provided proper 3. Supervise and
C 2 2 N 0 I
access/egress, monitoring potential impact to workers. 4. Issued an
training/information appropriate grip shoe. 5.
Wear a appropriate clothing.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

Enggineering & Admin. 1. All workers must be inducted before commencing of work.
Control - Safety awareness 2. All workers must be briefing before commencement and weekly
-Barricade, Traffic C 2 4 Y 8 I toolbox talks to explain the hazards.
Control, Training, Briefing & 3.Monitoring the activities.
Monitoring 4. Barricade at te potential area and place signages

Enggineering & Admin.


1. All workers must used proper PPE at work site. 2.
Control - Safety awareness
Un-good condition of machinery need to be check and repair as
-Face mask, C 3 2 N 0 I
posible. 3.
Servicing, Toolbox Talk,
Toolbox Talk before start work.
Monitoring

1. Proper PPE must be worn.


Admin Control & PPE - 2. Briefing before start work.
Briefing,Protective clothing, C 3 2 N 0 I 3. Supervise and
hand glove & face shield monitoring potential impact to workers. 4. Wear an
appropriate clothing.

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E 3
Admin. Control & PPE -
To provide competent super visor to supervise the activity.
Safety awareness
C 3 2 N 0 I
-Ear plug/muff &
4. Briefing before start work.
initial noise monitoring
5. Noise monitoring must be conducted to area and
personal.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
1. All workers must be inducted before commencing of work.
2. No smokimg or naked fire below 30 meters from the potential
Admin. Control Training,
area. (Briefing & signages)
Briefing & Safety C 3 4 Y 12 II
3. Provide training & safe work practice
Awareness
4.
Monitoring and supervise the works..

1. Analyze any potential of hazards. 2. Daily checklist need to be


Admin Control & PPE updated and display by the supervisor and any hazards must
-Briefing,Protective clothing, C 2 4 Y 8 I immediattely take necessary action. 3. Safe work practice and
hand glove & Safety Boot display signage. 4. only trained person can operate the machine.
5. Work monitoring and supervising

Enggineering & Admin. 1. Analyze any potential of hazards. 2. Daily checklist need to be
Control - Safety awareness updated and display by the supervisor and any hazards must
-Barrier, Traffic C 2 3 Y 6 I immediattely take necessary action. 3. Safe work practice and
Control, Training, Briefing & display signage. 4. only trained person can operate the machine.
Monitoring 5. Work monitoring and supervising

1. All Air compressor must have c ertificate of fitness from DOSH


Admin Control - Only
and display at the compressor.
machine with fitness certified C 3 4 Y 12 II
2. Maintenance and servicing as schedule.
must be used.
3. Record Keeping.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


Engin. & Admin Control -
2. All workers must be briefing before commencement and weekly
Walking Platform, Safety
C 3 4 Y 12 II toolbox talks to explain the hazards.
Harness /belt, Training &
3.Monitoring the activities.
Briefing
4. Barricade at te potential area and place signages

1. Proper PPE must be worn.


Engineering, Admin Control 2. Briefing before start work.
- Provided proper 3. Supervise and
C 2 2 N 0 I
access/egress, monitoring potential impact to workers. 4. Issued an
training/information appropriate grip shoe. 5.
Wear a appropriate clothing.

1. Lift the objects with good procedure and posture.


Admin. Control - 2. Used trolly or 2 person lift the heavy object if more
Training, Briefing, Job C 2 2 N 0 I than 2 KG .
Rotation & Safe work practice 3. Briefing/Toolbox Talk before start work.
4. ProvideTraining manual handling activities.

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
Engineering, admin control
3. Briefing/Toolbox Talk before start work.
& PPE - Water
C 3 1 N 0 I 4. Provide water sprinkler/ browser to prevent flying
sprinkling/Browser, Dust
dust. 5. supply face mask to worker which
mask and training
involved 6. All
workers must used proper PPE during work conducted.

1. Proper PPE must be worn.


2. Briefing before start work.
Admin control & PPE
3. Supervise and
Training, Briefing & C 2 2 N 0 I
monitoring potential impact to workers. 4. Provide eye
Face Shield
wash station for emergency..
5. Wear a appropriate clothing.
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Safe work practice/procedure must be follow


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective
C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
clothing, hand glove &
4. All workers must used proper PPE during work
face shield
conducted.

1. Electrical Hand Tool must be in good condition.


Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 3 4 Y 12 II 3. Briefing/Toolbox Talk before start work.
clothing & hand glove. 4. Competent/Training. 5. Proper PPE must be
provided. 6. Random check before start work.

1. Safe work practice/procedure must be follow


Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing & C 2 2 N 0 I 3. Briefing/Toolbox Talk before start work.
Face mask 4. All workers must used proper PPE during work
conducted.

1. Permit To Work Required before excavation. 2


Admin Control & PPE - Supervise at all potential area in full time. 3.
Briefing,Protective clothing, C 2 2 N 0 I Briefing/Toolbox Talk before start work. 4
hand glove & face shield Training.
5. Used appropriate PPE
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Cartridge must be stored in proper place and secure.


2. The cartridge must have a bucket c/w standby fire extinguisher
Engineering & Admin.
3. Only the hose with flash back arrestor allowed to be used. 4
Control - Flash Back
C 3 4 Y 12 II Only the competent/train workers can operate the welding
Arrestor, Training, Briefing &
equipment.
Hot work permit
5. Working permit needed before start hot work
6. Safety briefing and workplace
monitoring by supervisor in charge
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
Engineering, admin control 3. Briefing/Toolbox Talk before start work.
& PPE - Welding Sheild, C 3 1 N 0 I 4. Provide water sprinkler/ browser to prevent flying
Face mask and training dust. 5. supply face mask to worker which
involved 6. All
workers must used proper PPE during work conducted.

1. Safe work practice/procedure must be follow


Admin control & PPE
2. Monitoring and analyze the potential of hazard.
Training, Briefing, Welding
C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
sheild, Protective clothing &
4. All workers must used proper PPE during work
hand glove.
conducted.

1. Electrical Hand Tool must be in good condition.


Admin. Control - 2. Workers must be inducted before start work.
Training, Briefing, Job C 3 2 N 0 I 3. Work monitoring and supervising.
Rotation & Safe work practice 4. Workers must have a good health and fit t
work. 5. Competent/Training.
1. All workers must be inducted before commencing work.
2. All workers must use proper P.P.E 3
Admin. Control -
To provide body part assessment before work start.
Training, Briefing, Job C 2 2 N 0 I
Rotation & Safe work practice
4. Briefing before start work.
5. Job rotation and rest if necessary
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E 3
Admin. Control & PPE -
To provide competent super visor to supervise the activity.
Safety awareness
C 2 2 N 0 I
-Ear plug/muff &
4. Briefing before start work.
initial noise monitoring
5. Noise monitoring must be conducted to area and
personal.

1. Safe work practice/procedure must be follow


Admin control & PPE 2. Monitoring and analyze the potential of hazard.
Training, Briefing, Protective C 3 2 N 0 I 3. Briefing/Toolbox Talk before start work.
clothing & hand glove. 4. All workers must used proper PPE during work
conducted.

1. All workers must be inducted before commencing of work.


Engin, Admin Control &
2. All workers must be briefing before commencement and weekly
PPE - Machine Guard, Safe
C 2 3 Y 6 I toolbox talks to explain the hazards. 3.
work practice, Training &
Provide guard to moving part if necessary.
Briefing.
4. Supervise the work

1. Electrical Hand Tool must be in good condition.


2. Monitoring and analyze the potential of hazard.
Admin control & PPE 3. Briefing/Toolbox Talk before start work.
Training, Briefing, Protective C 3 4 Y 12 II 4. Competent/Training.
clothing & hand glove. 5. Proper PPE must be provided.
6. Random check
before start work.

** SEVERITY = *** RISK RANKING


Description SCORE
Risk Assessment Control
Legal Determination of control hierarchy:
Compliance 1. Elimination of hazards
Significant
Existing Control Measures ***Risk Risk 2. Substitution
*P **S Hazard?
(ECM) Rating Categ. 3. Engineering
(Y/N)
C, PC, NC 4. Administrative
5. Personal Protective Equipment (PPE)
FATALITY : Death / Property damage more than RM 100K. 9 -16
MAJOR INJURY / : Normally irreversible. Permanent / partial disability /
ILLNESS / PROPERTY DAMAGE Property damage more than RM 50K to RM 100K. 4-8
MINOR INJURY / : Normally reversible and affect work performance /
ILLNESS / PROPERTY DAMAGE Property damage RM 10K to RM 50K. 1-3
NEGLIGIBLE INJURY / : Not affecting work performance. First aid case /
ILLNESS / PROPERTY DAMAGE Property damage less than RM 10K.
Approved by:

Control
rchy:

ment (PPE)

efing before start work.


3. Supervise and
workers.
e grip shoe.
priate clothing.
d before commencing of work.
before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

rocedure and posture.


2 person lift the heavy object if more

box Talk before start work.


g manual handling activities.

it certificate (PMA) can be used at


or machineries to be fill up before
llow and monitoring by supervisor. 4.
mediately. (Stop work if
hine)
Control
rchy:

ment (PPE)
d before commencing work.
r P.P.E 3.
ent before work start.

f necessary
d before commencing of work.
before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

rocedure and posture.


2 person lift the heavy object if more

box Talk before start work.


g manual handling activities.

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the
Control
rchy:

ment (PPE)

ure must be follow


alyze the potential of hazard.
box Talk before start work.
h station for emergency.
re use the chemical.
l workers must used proper PPE

ure must be follow


alyze the potential of hazard.
box Talk before start work.
h station for emergency.
re use the chemical.
l workers must used proper PPE

d before commencing work.


r P.P.E 3.
ent before work start.

f necessary
d before commencing of work.
elow 30 meters from the potential

rovide training & safe work practice.


4.
works..
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

ure must be follow


alyze the potential of hazard.
box Talk before start work.
h station for emergency.
re use the chemical.
l workers must used proper PPE

efing before start work.


3. Supervise and
workers. 4. Issued an
5.

rocedure and posture.


2 person lift the heavy object if more

box Talk before start work.


g manual handling activities.
Control
rchy:

ment (PPE)

ure must be follow


alyze the potential of hazard.
box Talk before start work.
h station for emergency.
re use the chemical.
l workers must used proper PPE

d before commencing of work.


low 30 meters from the potential

e work practice.
4. Monitoring and supervise
Control
rchy:

ment (PPE)

rocedure and posture.


2 person lift the heavy object if more

box Talk before start work.


g manual handling activities.

d before commencing work.


r P.P.E 3.
sor to supervise the activity.

art work.
ng must be conducted to area and

ure must be follow


alyze the potential of hazard.
box Talk before start work.
t used proper PPE during work

ure must be follow


alyze the potential of hazard.
box Talk before start work.
inkler/ browser to prevent flying
5. supply face mask to worker which
6. All
E during work conducted.

efing before start work.


3. Supervise and
workers. 4. Issued an
5.
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards. 3.
ractice.
Monitoring and supervise the

ure must be follow


alyze the potential of hazard.
box Talk before start work.
h station for emergency.
re use the chemical.
l workers must used proper PPE

ure must be follow


alyze the potential of hazard.
box Talk before start work.
h station for emergency.
re use the chemical.
l workers must used proper PPE

rocedure and posture.


2 person lift the heavy object if more

box Talk before start work.


g manual handling activities.

efing before start work.


3. Supervise and
workers. 4. Issued an
5.
Control
rchy:

ment (PPE)
d before commencing work.
r P.P.E 3.
ent before work start.

f necessary
Control
rchy:

ment (PPE)

way.
y matters and site condition before

necessary.

efing before start work.


3. Supervise and
workers. 4. Issued an
5.

way.
y matters and site condition before

or opening/ edge install hard


4. Monitoring
ple. 5. Stop
ary.

r all insect/ mosquito as shown in


ectious Diseases Act and Regulation.
2.
e environment.

way. (Barrier & Signages)


Briefing about safety matters and
orkplace.
. Avoid to be under loading material.
4. Monitoring activities
5. Stop work at a
Control
rchy:

ment (PPE)

ine must be fully guarded. 2.


before commencing of work. 3. All
re start work. 4.
le working. 5.
hich involved.

cooling body from direct sun. 2.


plain water.
appropriate cloth due to hot weather.

way.
y matters and site condition before

oading material.
ng activities near the visiting people.
p work at a risky area if necessary.

way.
y matters and site condition before

ediattely when storm/thunder seen.

efing before start work.


3. Supervise and
workers. 4. Issued an
5.
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards.

e potential area and place signages.

er PPE at work site. 2.


ry need to be check and repair as
3.
.

efing before start work.


3. Supervise and
workers. 4. Wear an

d before commencing work.


r P.P.E 3.
sor to supervise the activity.

art work.
ng must be conducted to area and
Control
rchy:

ment (PPE)
d before commencing of work.
elow 30 meters from the potential

rovide training & safe work practice.


4.
works..

zards. 2. Daily checklist need to be


pervisor and any hazards must
action. 3. Safe work practice and
ed person can operate the machine.
vising

zards. 2. Daily checklist need to be


pervisor and any hazards must
action. 3. Safe work practice and
ed person can operate the machine.
vising

ve c ertificate of fitness from DOSH


.
and servicing as schedule.
Record Keeping.
Control
rchy:

ment (PPE)

d before commencing of work.


before commencement and weekly
zards.

e potential area and place signages.

efing before start work.


3. Supervise and
workers. 4. Issued an
5.

rocedure and posture.


2 person lift the heavy object if more

box Talk before start work.


g manual handling activities.

ure must be follow


alyze the potential of hazard.
box Talk before start work.
inkler/ browser to prevent flying
5. supply face mask to worker which
6. All
E during work conducted.

efing before start work.


3. Supervise and
workers. 4. Provide eye

g.
Control
rchy:

ment (PPE)

ure must be follow


alyze the potential of hazard.
box Talk before start work.
t used proper PPE during work

be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining. 5. Proper PPE must be
check before start work.

ure must be follow


alyze the potential of hazard.
box Talk before start work.
t used proper PPE during work

efore excavation. 2.
in full time. 3.
art work. 4.

E
Control
rchy:

ment (PPE)

proper place and secure.


bucket c/w standby fire extinguisher.

ack arrestor allowed to be used. 4.


ers can operate the welding

permit needed before start hot work.


ety briefing and workplace
arge
Control
rchy:

ment (PPE)

ure must be follow


alyze the potential of hazard.
box Talk before start work.
inkler/ browser to prevent flying
5. supply face mask to worker which
6. All
E during work conducted.

ure must be follow


alyze the potential of hazard.
box Talk before start work.
t used proper PPE during work

be in good condition.
e inducted before start work.
onitoring and supervising.
rs must have a good health and fit to
5. Competent/Training.
d before commencing work.
r P.P.E 3.
ent before work start.

f necessary
Control
rchy:

ment (PPE)

d before commencing work.


r P.P.E 3.
sor to supervise the activity.

art work.
ng must be conducted to area and

ure must be follow


alyze the potential of hazard.
box Talk before start work.
t used proper PPE during work

d before commencing of work.


before commencement and weekly
zards. 3.
f necessary.

be in good condition.
analyze the potential of hazard.
olbox Talk before start work.
raining.
5. Proper PPE must be provided.
6. Random check

LEVEL
Control
rchy:

ment (PPE)
High

Medium

Low
Type Hazard description Consequences
exposed to pathogen - bacteria, fungus, virus, toxic plant, leech
Biological
exposed to allergen
chemical splash onto skin, eye skin or eye iritation
chemical (high concentration) splash onto skin, eye skin burnt
chemical (high concentration) splash eye blindness
explosion Fatality
acute inhalation of vapor (short period of exposure to high concentration narcosis (unconsciousness), due to a repressive
of chemical vapour) - e.g. n-hexane effect on the central nervous system.

chronic inhalation of vapor (repeated or prolonged exposure to relatively Chronic effect - e.g. cause peripheral neuropathy
Chemical low concentration of chemical vapour) - e.g. n-hexane (disease of the peripheral nerves), an irreversible
effect
chronic inhalation of fume (repeated or prolonged exposure to relatively anaemia, a reduced ability of the blood to
low levels of substance) - e.g. lead distribute oxygen throughout the body
inhalation of toxic substance refer to CSDS
swallow (ingestion) of chemical refer to CSDS
fire Fatality
exposed to carcinogens - e.g. benzene leukaemia - cancer of blood-forming tissues
inhalation of smoke
exposed to X-ray
exposed to excessive noise
exposed to high/low temperature
subjected to vibration impact
Physical exposed to laser
exposed to microwave frequency
exposed to low freqeuncy
exposed to infrared
exposed to ultra violet
repetitive motion
awkward posture
wrong sitting posture
Ergonomic physical stress
vibration impact
computer screen radiation
forceful hand exertion
sexual harrasment
Psychosocial work harrassment
mental stress
exposed to conductive material
exposed to high static voltage
exposed to high voltage
hit/poked by object/mass
cut/poked by sharp object/edges
unguarded machine
draw in …
caught in between …
Snake bite
lack of oxygen asphyxiation (acute lack of oxygen that can cause
death)
fall from height
fall on same level
Others
hit by falling object
hit by vehicle
stab/puncture by flying object
stab/puncture by moving parts of machinery
sheared between two machines
sheared between a machinery part and workpiece
Drawn in between counter-rotating parts
Caught in between rotating and fixed-parts
caught in between materials in motion
contact against hot surface
contact against abrasive material
crushed by moving parts
crushed by stamping machine
Factories and Machinery Act (FMA) 1967
No. Reg/Order
1 Electric Passenger & Goods Lift Regulations 1970
2 Fencing of Machinery & Safety Regulations 1970
3 Notification, Certificate of Fitness and Inspection Regulation 1970
4 Persons-In-Charge Regulations 1970
5 Safety, Health & Welfare Regulations 1970
6 Steam Boiler and Unfired Pressure Vessel Regulations 1970
7 Lead Regulations 1984
8 Asbestos Process Regulations 1986
9 Building Operations & Works of Engineering Construction (Safety) Regulations 1986
10 Noise Exposure Regulations 1989
11 Mineral Dust Regulations 1989

Occupationa Safety & Health Act (OSHA) 1994


No. Reg/Order
1 Control of Industrial Major Accident Hazards (CIMAH) Regulations 1996
2 Safety and Health Committee (SHC) Regulations 1996
3 Classification, Packaging & Labelling of Hazardous Chemical (CPL) Regulations 1997 .
4 Safety and Health Officer (SHO) Regulations 1997
5 Safety and Health Officer (SHO) Order 1997
6 Prohibition of Use of Substance Order 1999
7 Use and Standards of Exposure of Chemicals Hazardous to Health (USECHH) Regulations 2000 .
8 Notification of Accident, Dangerous Occurrence, Occupational Poisoning & Occupational Diseases (NADOOPOD) Regulations 2004

Others
No. Act/Reg./Order
1 Fire Services Act 1988
1.1 Fire Certificate Regulations 2001
2 Poisons Act 1952
2.1 Poisons Regulations 1952
2.2 Sodium Arsenite Regulations 1949
2.3 Sodium Hydroxide Regulations 1962
2.4 Psychotropc Substance Regulations 1989
3 Electricity Supply Act 1990
3.1 Electricity Regulation 1994
4 Atomic Energy Licensing Act 1984
4.1 Licensing Regulations
4.2 Basic Safety Standards Regulations
4.3 Transport Regulations

Code of Practices (COP)


No. COP
1 COP of Food Hygiene 1980
2 ICOP for Safe Working in a Confined Space 2010
3 COP on Prevention and Management of HIV/AIDS at the Workplace 2001
4 COP on Indoor Air Quality 2005
Engineering control Administrative control PPE control
(Provision, control and
maintenance)
Adapt work to individual studies Planned machinery maintenance Safety helmet
prior to work start and applied
Water spray Medical surveillance Safety shoes
Detection system Emergency preparedness and response plan Wire harness
Enclosure/closed system Audiometric test Protective clothing
Machine guarding Lock-out Tag-out (LOTO) system Goggles
Interlock system Permit to work system Face shield
General ventilation Workplace inspection Dust mask
Isolation Signages Vapor mask
Local exhaust ventilation Safe work instruction availability Fume mask
Process control Scheduled breaks Half-faced respirator
Safety switch Job rotation Full-faced respirator
Safety valve Human factors: Ear plug
Competency requirement (e.g. forklift driver, boilderman, Ear muff
wireman, chargeman, AGT)
Awareness program Cotton glove
Training on PPE usage Nitril (chemical) glove
Training on safe handling
On-the-Job Training (OJT)
Work matches workers physical capabilities
Medical checkup prior to work allocation (e.g. fitness check)
Behavior: Workers
a. following safe work practices / procedures (SWP)
b. wearing PPE (e.g. ear plug, chemical glove, vapor mask)
c. highligting on safety issues when observed